Nuclear power development

advertisement
ROSATOM
Nuclear Power Development: Rosatom perspective
Alexey Kalinin
Head, International Business, Rosatom
ENC 2012 conference
December 10, 2012
Fully Integrated Nuclear Technology Company
Anniversary of
Russian Nuclear
Industry
2010
Uranium
production
Uranium
enrichment
www.rosatom.ru
Fuel
Power equipment
fabrication
manufacturing
NPP Design,
Engineering
and Construction
Electricity
generation
Services and
modernization
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
2
Rosatom safe and mature VVER technology is one of the
most referenced
VVER Global Fleet
Country
Constructed
Armenia
2
Bulgaria
6
China
2
Czech Republic
6
Finland
2
Germany
6
Hungary
4
Iran
1
Russia
17
Slovakia
Slovakia
6
Hungary
Ukraine
15
TOTAL
67
Finland
Russia
Germany
Ukraine
Bulgaria
Armenia
China
Iran
Czech
Republic
www.rosatom.ru
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
3
Rosatom operating NPP fleet in Russia
Kola NPP
Leningrad NPP
Bilibino NPP
Kalinin NPP
Smolensk NPP
Beloyarsk NPP
Novovoronezh NPP
- VVER
- RBMK
- BN
- EGP
Balakovo NPP
Kursk NPP
Rostov NPP
Balakovo NPP
Kola NPP
Kursk NPP
Leningrad NPP
Beloyarsk NPP
Units in operation: 4
Units in operation: 4 Units in operation: 4 Units in operation: 4 Units in operation: 1
Capacity: 4000 MW
Capacity: 1760 MW
Kalinin NPP
Novovoronezh NPP
Capacity: 4000 MW
Rostov NPP
Capacity: 4000 MW
Smolensk NPP
Capacity: 600 MW
Bilibino NPP
Units in operation: 4
Units in operation: 3 Units in operation: 2 Units in operation: 3 Units in operation: 4
Capacity: 4000 MW
Capacity: 1880 MW
www.rosatom.ru
Capacity: 2000 MW
Capacity: 3000 MW
Capacity: 48 MW
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its
affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
4
Rostov NPP, unit 2
Key Project Parameters
Reactor design: VVER-1000
(V - 320)
Gross capacity: 1000 MW
First criticality:
22 Jan 2010
First grid connection: 18 Mar 2010
www.rosatom.ru
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom
disclaims all responsibility for any and all mistakes, quality and completeness of the information.
5
Kalinin NPP, unit 4
Key Project Parameters
Reactor design: VVER-1000
(V - 320)
Gross capacity: 1000 MW
First criticality:
08 Nov 2011
First grid connection: 24 Nov 2011
www.rosatom.ru
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom
disclaims all responsibility for any and all mistakes, quality and completeness of the information.
6
Tianwan NPP, China
Lianyungang, Jiansu province
Key Parameters
Reactor design: VVER-1000
(V-428)
Tianwan
1
2
Total Gross Capacity: 2120 MW (2 x
1060 MW)
First criticality:
20 Dec 2005 (unit 1)
01 May 2007 (unit 2)
First grid connection:
12 May 2006 (unit 1)
14 May 2007 (unit 2)
Commercial operation date:
17 May 2007 (unit 1)
16 Aug 2007 (unit 2)
Legal basis: IGA (1992)
www.rosatom.ru
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
7
Busher NPP, Iran
Key Parameters
Reactor design: VVER-1000
(V-446)
Total Gross Capacity: 1000 MW (1 x
1000 MW)
First criticality:
08 May 2011
First grid connection:
03 Sep 2011
Commercial Operation Date:
30 Jul 2012 (anticipated date)
Legal basis: IGA (1992)
Construction on the “turn-key” basis
www.rosatom.ru
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
8
Kudankulam NPP, India
Key Parameters
Reactor design: VVER-1000
(V-412)
Total Gross Capacity: 2000 MW (2 x
1000 MW)
First criticality:
2012 (anticipated date)
First grid connection:
2012 (anticipated date)
Legal basis: IGA (1998)
www.rosatom.ru
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
9
Rosatom Gen III+ NPP design
What is VVER?
(Water-Water Power Reactor)


Protection from outer impacts
Forefront of nuclear technology –
Generation 3+ reactor
Proven and mature solutions –
1400 reactor years of total
operating time

A high level of internal safety gained
through evolution of design

Most demanded capacity suitable
for various grid conditions – 10001200 MWe

Long – run facility – design lifetime
of the main equipment: 60 years

High performing source of supply –
availability factor ≈ 92 %
www.rosatom.ru
Hurricanes, tornadoes
Airplane crash
Snow load
Tsunamis, floods
Outside explosions
Earthquakes
 Meets all current Russian and international safety
standards and the IAEA requirements
 Widely referenced by utilities
 EUR certified
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
12
Novovoronezh NPP-II
Key Parameters
Reactor design: VVER-1200
(V-392M)
Total Gross Capacity: 2400 MW (2 x
1200 MW)
Construction start:
24 Jun 2008 (unit 1)
12 Jul 2009 (unit 2)
Commercial Operation Date:
end of 2013 (anticipated date, unit 1)
end of 2014 (anticipated date, unit 2)
www.rosatom.ru
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom
disclaims all responsibility for any and all mistakes, quality and completeness of the information.
11
How strongly did Fukushima affect the plans to the
world’s nuclear energy development?
Eastern
Europe
North
America
38
Western
Europe
150
135
120 123
24 24
32 29
Russia
31
Korea
113 113
114 114
111 99
114 114
47 44
34 32
24 24
38 38
2012 2020 2030
30 31
2012 2020 2030
China
2012 2020 2030
120 124
21 21
74
2012 2020 2030
18
MENA
54
22
India
13
26 27
10
Installed capacity
GW, reference scenario
World
12 12
17 11
2012 2020 2030
South Africa
-12%
36
7
37 37
South-East
Asia
2012 2020 2030
-11%
652
62
2012 2020 2030
19 19
Latin
America
Japan*
2012 2020 2030
66
34
2012 2020 2030
5 5 10 7
9,4
588
2012 2020 2030
2012 2020 2030
Rosatom’s portfolio
515
460
2012 2020 2030
21
365 365
12
2012
2020
2030
2010 2011
Rosatom’s scenario before Fukushima
Rosatom’s scenario after Fukushima
www.rosatom.ru
Source: Rosatom
* Does not include national nuclear power program potential strategy revision (to be revised shortly)
The content of this preсоsentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
5
Emerging Markets Become Increasingly Important in New Build
Countries’ decisions on the development of nuclear energy
Number of countries
4
Established nuclear markets
For example,
• France
• USA
• Russia
• Czech Republic
• …
www.rosatom.ru
Reviewed plans
For example,
• Germany
• Switzerland
• Italy
• Belgium
Emerging nuclear markets
Affirmed plans for
development of national
nuclear programs
For example,
• Turkey
• Vietnam
• UAE
• Belorussia
• …
13
Rosatom NPP construction projects worldwide
United Kingdom Finland
1
4
Czech Republic
2
Slovakia
1
Hungary
2
Bulgaria
1
Belorussia
2
Nigeria
2
Brazil
4
Argentina
2
Russia
9
Ukraine
2
Kazakhstan
2
9 Armenia
China
1
Turkey
2
4
2
India Bangladesh
2
Vietnam
4
2
Jordan
12
2
Malaysia
2
Saudi Arabia
Indonesia
2
2
South Africa
8
38
30
28
22
In progress
Tendering
process/
negotiations
Potential
Rosatom NPP construction perspective backlog – more than 80 units
content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to
www.rosatom.ru The
Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
14
Nuclear power plant brings more than just energy
Additional gains from NPP construction
Growth of demand in
other sectors of
economy
Job creation
Industry and
construction sector
development
Electricity export
opportunities
Development of
science and
education
Social infrastructure
development
Tax payments growth
Country’s reputation
growth at regional
level
Energy security
development
Freezing of nuclear energy development is equal to rejection of social and economic development
www.rosatom.ru
4
An integrated solution should be the only form of a
vendor’s offer in current conditions
Energy Solution
Modern NPP design (Gen III+)
NPP construction and life cycle management support
(fuel, services, modernization)
Operation & maintenance
Regulation,
Infrastructure and
Public acceptance
Creation and development of
regulatory base
NFC facilities construction,
SNF & RW management,
Social-political programmes support
Industrial
Solution
Responsible Vendor’s
Integrated Solution
NPP equipment manufacturing,
service & works localization,
Technology transfer,
Certification of local suppliers,
participation in third countries
projects
Financial
Solution
Knowledge, skills,
human capital
BOO projects implementation;
State credits,
Partnership projects
Personnel education & training (incl.
traineeship on NPP sites),
R&D base development,
NPP operation experience exchange
- basic principle
www.rosatom.ru
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
16
Akkuyu NPP project profile
Key parameters
Akkuyu is the first
Rosatom’ foreign NPP
project configured on BOO
principles
• Project value – $ 20 bn.
• Implementation period – 2011-2021
• Legal basis – Intergovernmental Agreement of
May 12, 2010
• Reactor design – NPP-2006 (VVER-1200)
• Total capacity – 4 800 MW (4 units)
• PPA period –15 years, fixed price terms
Project highlights
• First NPP project in Turkey
Turkey
• Sound Russian and Turkish State encouragement
• Strong support to Turkey with regulatory system
establishment and personnel training
Site – Akkuyu, province Mersin, Turkey
• The project is implemented in close cooperation
with Turkish partners, involvement of Turkish
suppliers mainly in civil construction
• International investors are welcome to join the
project with up to 49% Akkuyu SPV stake
www.rosatom.ru
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
17
Ninh Thuan NPP project profile
Ninh Thuan NPP is the
first to be constructed in
Vietnam
Key parameters
• Construction period – 2014-2020
• Legal basis – Governmental Agreement of October
31, 2010
• Reactor design – NPP-91 (VVER-1000)
• Total capacity – 2 000 MW (2 units)
Project highlights
• First NPP project in Vietnam
• Ninh Thuan NPP meets Vietnamian electricity
needs
• Strong support to Vietnam with regulatory system
establishment and personnel training
Site Ninh Thuan – Vietnam
• Russian state credit comprehensive financing
solution
• Significant local content sourcing, especially in civil
construction
• Broad localization programme envisaged
• Strong political support from the Vietnam
government
www.rosatom.ru
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
18
Contacts in Rosatom
Dr. Kirill Komarov Deputy Director General, Development and International Business
e-mail: kbkomarov@rosatom.ru
Assistant: Maria
tel.: +7(495)969-29-39, ext. 3236
e-mail: mimosur@rosatom.ru
Alexey Kalinin
Director, International Business
e-mail: aakalinin@rosatom.ru
Assistant: Natalia
tel.: +7(499)949-25-37
Alexander Vlasov Senior Manager, International Business
e-mail: avvlasov@rosatom.ru
tel.: +7 (499) 949-20-25
www.rosatom.ru
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
21
Download