ROSATOM
Rosatom Investment Projects
Perspective in Europe and in the world
Ivo Kouklík
Vice-President,
Rusatom Overseas
June 13, 2013
Rauma
PRESENTATION CONTENT
ROSATOM - Introduction
ROSATOM – Investment Principles
ROSATOM – New NPPs in Europe
ROSATOM - New NPPs in the world
ROSATOM – Other nuclear projects
Conclusion
www.rosatom.ru
2
Rosatom - Fully Integrated Nuclear Technology Company
Nuclear
Power Complex
Uranium
production
Uranium
enrichment
www.rosatom.ru
Fuel
Power equipment
fabrication
manufacturing
Applied and Basic
Science
NPP Design,
Engineering
and Construction
Electricity
generation
Nuclear and
Radiation
Nuclear
Safety
Icebreakers
Services and
modernization
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
3
Rosatom Global Operations
leader in key segments
5 continents. More than 40 countries.
Europe
Finland, Sweden, the Netherlands,
Belgium, Germany, France, Spain, GB,
Switzerland, Czech Republic, Slovakia,
Hungary, Lithuania, Bulgaria, Slovenia
in uranium enrichment
CIS
Russia, Ukraine, Kazakhstan,
Belorussia, Armenia
North America
USA, Canada,
Mexico
Asia
China, Japan,
South Korea,
Vietnam, India,
Bangladesh,
Mongolia
in new NPPs construction
MENA
Turkey, Libya,
Morocco, Algeria,
Egypt, Iran, Jordan
nuclear fleet globally, 25,2 GWe
installed capacity
Latin America
Venezuela, Argentina,
Brazil
Australia
Africa
Namibia, South
Africa, Tanzania
in uranium deposits
www.rosatom.ru
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
4
Rosatom operating NPP fleet in Russia
Kola NPP
Leningrad NPP
Bilibino NPP
Kalinin NPP
Smolensk NPP
Beloyarsk NPP
Novovoronezh NPP
- VVER
- RBMK
- BN
- EGP
Balakovo NPP
Kursk NPP
Rostov NPP
Balakovo NPP
Kola NPP
Kursk NPP
Leningrad NPP
Beloyarsk NPP
Units in operation: 4
Units in operation: 4 Units in operation: 4 Units in operation: 4 Units in operation: 1
Capacity: 4000 MW
Capacity: 1760 MW
Kalinin NPP
Novovoronezh NPP
Capacity: 4000 MW
Rostov NPP
Capacity: 4000 MW
Smolensk NPP
Capacity: 600 MW
Bilibino NPP
Units in operation: 4
Units in operation: 3 Units in operation: 2 Units in operation: 3 Units in operation: 4
Capacity: 4000 MW
Capacity: 1880 MW
www.rosatom.ru
Capacity: 2000 MW
Capacity: 3000 MW
Capacity: 48 MW
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its
affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
5
Rosatom - Key figures - 2012
30 nuclear units
Simultaneous implementation
275 000 people
Number of employees
www.rosatom.ru
Revenue
Net income
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
6
PRESENTATION CONTENT
ROSATOM - Introduction
ROSATOM – Investment Principles
ROSATOM – New NPPs in Europe
ROSATOM - New NPPs in the world
ROSATOM – other nuclear projects
Conclusion
www.rosatom.ru
7
Rosatom is the responsible vendor ready to meet the
challenges of the evolving market
Energy Solution
Modern NPP design (Gen III+)
NPP construction and life cycle management support
(fuel, services, modernization)
Operation & maintenance
Regulation,
Infrastructure and
Public acceptance
Industrial
Solution
Creation and development of
regulatory base
NFC facilities construction,
SNF & RW management,
Social-political programmes support
Rosatom
Integrated Solution
NPP equipment manufacturing,
service & works localization,
Technology transfer,
Certification of local suppliers,
participation in Rosatom third
countries projects
Financial
Solution
Knowledge, skills,
human capital
Personnel education & training (incl.
traineeship on NPP sites),
BOO projects implementation;
R&D base development,
Partnership projects
State credits,
NPP operation experience exchange
- basic principle
www.rosatom.ru
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
8
Rosatom Generation III+ NPP Design
VVER-1200
(Water-Water Power Reactor)
Protection from outer impacts
Forefront of nuclear technology –
Generation 3+ reactor
Proven and mature solutions –
1400 reactor years of total
operating time
Hurricanes, tornadoes
Airplane crash
Snow load
A high level of internal safety gained
through evolution of design
Most demanded capacity suitable
for various grid conditions – 10001200 MWe
Tsunamis, floods
Outside explosions
Earthquakes
Long – run facility – design lifetime
of the main equipment: 60 years
High performing source of supply –
availability factor 92 %
www.rosatom.ru
Meets all current Russian and international safety
standards and the IAEA requirements
Widely referenced by utilities
EUR certified
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
9
PRESENTATION CONTENT
ROSATOM - Introduction
ROSATOM – Investment Principles
ROSATOM – New NPPs in Europe
ROSATOM - New NPPs in the world
ROSATOM – other nuclear projects
Conclusion
www.rosatom.ru
10
How strongly did Fukushima affect the plans to the
world’s nuclear energy development?
Eastern
Europe
North
America
38
Western
Europe
150
135
24 24
32 29
Russia
31
Korea
113 113
114 114
111 99
120 123
114 114
47 44
34 32
24 24
38 38
2012 2020 2030
30 31
2012 2020 2030
China
2012 2020 2030
120 124
21 21
74
2012 2020 2030
18
MENA
54
22
India
13
World
12 12
17 11
2012 2020 2030
South Africa
-12%
36
37 37
South-East
Asia
2012 2020 2030
-11%
652
62
2012 2020 2030
19 19
Installed capacity
Latin
America
66
26 27
10
GW, reference scenario
Japan*
2012 2020 2030
34
2012 2020 2030
5 5 10 7
9,4
7
588
2012 2020 2030
2012 2020 2030
Rosatom’s portfolio
515
460
2012 2020 2030
21
365 365
12
2012
2020
2030
2010 2011
Rosatom’s scenario before Fukushima
Rosatom’s scenario after Fukushima
www.rosatom.ru
* Does not include national nuclear power program potential strategy revision (to be revised shortly)
The content of this pre sentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
11
Ongoing NPP construction projects in Europe
4 units under construction in European Union (2 VVER).
10 units (all VVER) in other Europe countries are successfully implemented .
Olkiluoto 3 NPP (EPR)
Baltic 1-2 NPP (VVER-1200)
Flamanville 3 NPP (EPR)
Belorussian 1-2 NPP (VVER-1200)
Khmelnitsk 3-4 NPP (VVER-1000)
Mohovce 3-4 NPP (VVER-440)
Akkuyu 1-4 NPP (VVER-1200)
www.rosatom.ru
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
12
Akkuyu NPP
Key parameters
Akkuyu is the first
Rosatom’ foreign NPP
project configured on BOO
principles
• Project value – $ 20 bn.
• Implementation period – 2011-2021
• Legal basis – Intergovernmental Agreement of
May 12, 2010
• Reactor design – NPP-2006 (VVER-1200)
• Total capacity – 4 800 MW (4 units)
• PPA period –15 years, fixed price terms
Project highlights
• First NPP project in Turkey
Turkey
• Sound Russian and Turkish State encouragement
• Strong support to Turkey with regulatory system
establishment and personnel training
Site – Akkuyu, province Mersin, Turkey
• The project is implemented in close cooperation
with Turkish partners, involvement of Turkish
suppliers mainly in civil construction
• International investors are welcome to join the
project with up to 49% Akkuyu SPV stake
www.rosatom.ru
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
13
PRESENTATION CONTENT
ROSATOM - Introduction
ROSATOM – Investment Principles
ROSATOM – New NPPs in Europe
ROSATOM - New NPPs in the world
ROSATOM – other nuclear projects
Conclusion
www.rosatom.ru
14
VVER technology has potential to be built worldwide
Czech Republic
2
Slovakia
1
Hungary
2
Brazil
4
Argentina
2
Finland
1
Belorussia
2
Russia
9
Ukraine
2
Kazakhstan
2
9 Armenia
China
1
Turkey
2
4
Egypt
India Bangladesh
3
2
Vietnam
4
2
Jordan
12
2
Malaysia
2
Saudi Arabia
Indonesia
2
2
South Africa
8
46
28
8
In progress Tendering
process/
negotiations
Potential
Rosatom NPP construction perspective backlog – more than 80 units
www.rosatom.ru
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
15
Busher NPP, Iran
Key Parameters
Reactor design: VVER-1000
(V-446)
Total Gross Capacity: 1000 MW (1 x
1000 MW)
First criticality:
08 May 2011
First grid connection:
03 Sep 2011
Legal basis: IGA (1992)
Construction on the “turn-key” basis
www.rosatom.ru
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
16
Kudankulam NPP, India
Key Parameters
Reactor design: VVER-1000
(V-412)
Total Gross Capacity: 2000 MW (2 x
1000 MW)
First criticality:
2013 (anticipated date)
First grid connection:
2013 (anticipated date)
Legal basis: IGA (1998)
www.rosatom.ru
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
17
PRESENTATION CONTENT
ROSATOM - Introduction
ROSATOM – Investment Principles
ROSATOM – New NPPs in Europe
ROSATOM - New NPPs in the world
ROSATOM – other nuclear projects
Conclusion
www.rosatom.ru
18
Russian Experience in Design and Construction of
Research Reactors in Foreign Countries
Ukraine
Ukraine
Belarus
IR-100, 0.2MW
VVR-M, 10MW
IRT-M, 4MW
Uzbekistan
Kazakhstan
Kazakhstan
VVR-K, 6MW
IVG, 1.60MW
VVR-SM, 10MW
Latvia
IRT-M, 5MW
Kazakhstan
IGR
Georgia
Czech Republic
LVR-15, 10MW
IRT-M, 8MW
North Korea
IRT, 8MW
Germany
RFR-10, 10MW
Serbia
China
RFR-10, 10MW
Iraq
RA, 6.5MW
IRT-5000, 5MW
Vietnam
Hungary
DRR, 0.5MW
BRR, 10MW
Poland
Romania
VVR-S, 2MW
EVA,10MW
Libya
Bulgaria
IRT-1, 10MW
IRT-2000, 2MW
Egypt
Poland
MARIA, 30MW
ETRR-1, 2MW
Reactor Type:
www.rosatom.ru
- Tank
- Heavy Water
- Pool
- Pulse
- Channel in Pool
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
19
Nuclear Innovation – Variety of Applications
Nuclear Icebreaker Fleet
- #1 nuclear fleet in the world
- Assures stable functioning of Northern Sea Route
Fast Reactors (Gen IV)
- #1 fast neutron reactor in the world
- #1 operating fast neutron reactor in the world
- Broad development programme
Small and Medium Size Reactors
- Variety of different designs with referent parameters
- #1 floating NPP in the world is being built
- #1 successful public-private partnership for developing SMR
Radiation Technologies
- Isotope production
- Nuclear medicine
- Irradiation facilities
www.rosatom.ru
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
20
CONCLUSION
ROSATOM is currently the world leading company in the
construction of new nuclear units.
Company utilizes the advantages of continuing development and
construction of nuclear installations without interruption for
decades,
very broad research and engineering base and strong financial
position.
www.rosatom.ru
21
Thank You for Attention!
Ivo Kouklík
Vice-president
Rusatom Overseas
E-mail: IIKouklik@rosatom.ru
Phone: +7 967 213 7935
www.rosatom.ru