29 AGENDA ITEM BACKGROUND TO: GOVERNING BOARD DATE FROM: PRESIDENT SUBJECT: January 9, 2012 Ratification: Construction Change Orders REASON FOR BOARD CONSIDERATION ACTION ITEM NUMBER ENCLOSURE(S) Page 1 of 2 A.3 BACKGROUND: In accordance with Board Policy 4155, the attached change orders over $25,000 and less than 10% of the original contract value are submitted for Governing Board ratification. Continued on page 2 FISCAL IMPACT: $82,120 from project’s contingency. RECOMMENDATION: It is recommended that the Governing Board ratify the construction change orders provided as an attachment. Administrator Initiating Item: Joe Nugent Victoria Lewis Academic and Professional Matter If yes, Faculty Senate Agreement Senate President Signature Yes No Yes No Final Disposition Approved Ratification: Construction Change Orders: cont. Project Green Tech Center Change order # PCO 047R1 PCO 056R1 PCO 059 PCO 060 PCO 062 PCO 063 PCO 066 Green Technology Center Project Building 1300 HVAC Change order # PCO 001 Contractor Dilbeck Amount Description 5,369 Install a new traffic rated datacabling box in existing parking lot to allow connecting new buildings to existing buildings. It was thought this box was connect to the existing buildings it was not. 1,167 Change made to the shade canopy supports design to improve the connection. 1,952 Install a 6" trench drain instead of the base contract 4" trench drain to improve the drainage along Trafton 516 Add and additional circuit breaker. 62,254 Add Data Cabling and network backbone to the scope of the project -1,686 Removed the installation of the Watsonville City supplied street light heads from the contractor's scope. (the city will install free of charge) 391 Install a new 4 plex for the new IDF in Building B 69,962 Total Change Order Contractor Geo. Wilson Amount 451 PCO 002 119 PCO 003 173 PCO 004 606 PCO 005 9,832 PCO 006 633 PCO 007 Building 1300 346 12,158 Total All Change Orders 30 Description Add and additional exhaust duct for emergency back up to accommodate a "Move and Cool" unit. Add additional pipe supports required when we removed the joists which were supporting them. Change out a grid ceiling mounted light fixture to a hard lid ceiling mounted fixture. Request from IT to modify the ceiling type to accommodate a fire supression system to be installed at a later date. Request electrical changes from IT to accommodate future equipment needs to be installed at a later date. Install new unistrut support for the new larger electrical cabinets. Modify the wire size for the UPS system (purchased after construction portion went to bid) Total Change Order 82,120 Note: These change orders are reflected in the Facilities Master Plan (FMP) Status Report.