Office of Financial Management Washington State Major Project Status Report 30 June 2015 Agency Number: 699 Agency: State Board for Community & Technical Colleges School/Campus: Skagit Valley College Project Number: 20081224 Project Title: Academics & Student Support Building Bill Reference: SBCTC – AD7H; Fund – 057; Appropriations - I28 & J09; a state funded COP was provided for the construction phase. Contact Name/Phone Number/e-mail: Dave Scott, Facilities Director Skagit Valley College 2405 East College Way Mount Vernon, WA 98273-5899 (360) 416-7751/ dave.scott@skagit.edu Project Description: This project provides construction of a new facility to replace the 50-year old Lewis Hall. The proposed building includes up to date classrooms, computer labs and lab facilities to accommodate basic skills instruction and coordinated student services. It will include expansion of the student learning center, tutoring space, small seminar rooms and classrooms with language labs for ESL students. Square feet: 72,858-gsf Scope changes: The project is complete. There have been only minor scope changes and typical field changes since the start of construction Project Total Cost: Phase Predesign Design Construction* Other (Approp./Non Approp. Total Biennium 2007-2009 2009-2011 2012 Appropriation Amount I28 $ 123,000 J09 $ 1,730,000 State COP $ 29,067,971 $30,920,971 MACC = $21,399,000 1 Schedule: Predesign Complete Start Design Design Complete Bid Date Notice to Proceed 50% Complete Substantial Completion Phase-I Substantial Completion Phase-II Final Acceptance Note: 1. 2. Budget Schedule (as currently funded) 7/1/2008 7/1/2009 5/1/2012 5/1/2012 9/1/2014 Actual/ Forecast Variance (wks) 7/1/2008 10/9/2009 1/9/2012 6/6/2012 6/6/2012 7/1/2013 8/1/2014 2 1/6/2015 5/1/2015 0 14 -16 1 4 18 Design complete was extended due to funding of construction slipping from 2011-13 to the 201315 funding cycle Phase-I Construction Phase was extended to address atypical wet winter Project Status and discussion of Critical Path for Construction: The Project is complete and warranty inspection for Phase-I is scheduled for 13 July 2015. Contract Award History A/E Agreement Original Agreement Amendments Pending Changes Total Design Contingency $ $ $ $ 1,058,972 1,532,282 0 2,591,254 $ 0 Construction Contract (excl. sales tax) Bid Award Amount $ 20,950,189 Change Orders $ 1,215,177 Pending Changes $ 0 Total $ 22,165,366 Construction Contingency $ 0 Potential for Project Cost Overruns/Claims The project is complete and all changes negotiated and executed. Total changes were 5.8%, well below the planned contingency. Discussion of Project Quality The quality goal for this project includes use of materials and systems that are both costeffective and durable but also aesthetically pleasing. The focus on quality also extends to the requirement to achieve LEED goals. The project achieved LEED Gold certification. 2 Project Photographs 3 4 5