The Result
■ Reduced customer risk in
terms of resources and
experience through excellent
project management and
expertise in hydroelectric
power plants
■ Comprehensive one-stop
turnkey solution
■ Subsequent support with
local service
SPPA-E3000 Complete Electrical Package
provides a comprehensive one-stop turnkey
solution, accompanied with competent project
execution, for all electrical systems in the new
Akköy-II hydro power plant in Turkey for
convenient, consistent control of all processes.
The Plant
One of the world’s top 10 and Turkey’s highest
(1241 m) hydroelectric power plant, Akköy-II is
located in the north-eastern province of Giresun.
Based on two 115 MW Pelton turbines with two
vertical-axis synchronous generators, an energy
output of 890 GWh/year serves all of the
electricity needs of Giresun and the nearby
regions of Ordu and Gümüshane. This provides
2.5 % of Turkey’s power thus enabling annual
savings of about 100 million (USD) for gas
imports.
With most of the electrical equipment produced
in Turkey, Siemens delivered, installed and
commissioned two 154/14 4kV transformers,
a 14,4 kV Generator Circuit Breaker (GCB),
Isolated Phase Busbar (IPB), TRV Communication
System, LV 400 V AC / 110 V DC switchboards,
HV / MV / LV systems, and power and control
cable supply.
This comprehensive and proven solution
guarantees utmost availability from the
beginning due to high-quality components
and innovative technology. Furthermore,
effective design minimizes power consumption.
Siemens was also responsible for training the
operating personnel. Even after completing
the project, Siemens continues to support the
customer with local service.
The Task
As it had just been built, the hydroelectric
power plant Akköy-II needed to be electrically
equipped from the ground up. For this task,
operator Akköy Enerji required a single, highly
experienced, comprehensive electrical solution
provider in order to ensure plant’s utmost
availability and highest energy efficiency. The
solution provider would also need to be able to
take over the entire project execution, including
all necessary resources.
Our Solution
Operator Akköy Enerji trusted Siemens’ extensive
know-how and expertise, acquired through more
than 500 successfully completed electrical
engineering projects, including hydroelectric
power plants.
Thus, Siemens also competently managed the
entire electrical equipping of Akköy-II: the onestop, turnkey SPPA-E3000 Complete Electrical
Package solution includes all electrical
components and services required for the
construction of a new power plant.
“Siemens has overtaken reliably
and professionally all tasks and
installations necessary to equip
our hydroelectric power plant
Akköy-II, from planning to
commissioning and training.
And they will continue to assist
us with local personnel.”
Mr. Ahmet Erbas, Plant Manager
Akköy Enerji
siemens.com/sppa
Published by and copyright © 2015:
Siemens AG
Power and Gas Division
Freyeslebenstrasse 1
91058 Erlangen, Germany
For more information contact
sppa-e3000.energy@siemens.com
www.siemens.com/energy/sppa-e3000
E301_FR_CEP_HEPP-Akkoey-II-TRK_e_V1-0
Order no. E50001-G230-A391-X-4A00
Printed in Germany
Dispo 05401
Printed on elementary chlorine-free
bleached paper.
Unrestricted
AL:N ECCN:N
All rights reserved.
Trademarks mentioned in this document are
the property of Siemens AG, its affiliates, or
their respective owners.
Subject to change without prior notice.
The information in this document contains
general descriptions of the technical options
available, which may not apply in all cases.
The required technical options should
therefore be specified in the contract.