Utmost reliability and availability through a turnkey electrical solution at Turkey‘s highest HPP Reference – Electrical Solutions Instrumentation, Controls & Electrical Width: 4,36 The Result ■ Reduced customer risk in terms of resources and experience through excellent project management and expertise in hydroelectric power plants ■ Comprehensive one-stop turnkey solution ■ Subsequent support with local service SPPA-E3000 Complete Electrical Package provides a comprehensive one-stop turnkey solution, accompanied with competent project execution, for all electrical systems in the new Akköy-II hydro power plant in Turkey for convenient, consistent control of all processes. The Plant One of the world’s top 10 and Turkey’s highest (1241 m) hydroelectric power plant, Akköy-II is located in the north-eastern province of Giresun. Based on two 115 MW Pelton turbines with two vertical-axis synchronous generators, an energy output of 890 GWh/year serves all of the electricity needs of Giresun and the nearby regions of Ordu and Gümüshane. This provides 2.5 % of Turkey’s power thus enabling annual savings of about 100 million (USD) for gas imports. With most of the electrical equipment produced in Turkey, Siemens delivered, installed and commissioned two 154/14 4kV transformers, a 14,4 kV Generator Circuit Breaker (GCB), Isolated Phase Busbar (IPB), TRV Communication System, LV 400 V AC / 110 V DC switchboards, HV / MV / LV systems, and power and control cable supply. This comprehensive and proven solution guarantees utmost availability from the beginning due to high-quality components and innovative technology. Furthermore, effective design minimizes power consumption. Siemens was also responsible for training the operating personnel. Even after completing the project, Siemens continues to support the customer with local service. The Task As it had just been built, the hydroelectric power plant Akköy-II needed to be electrically equipped from the ground up. For this task, operator Akköy Enerji required a single, highly experienced, comprehensive electrical solution provider in order to ensure plant’s utmost availability and highest energy efficiency. The solution provider would also need to be able to take over the entire project execution, including all necessary resources. Our Solution Operator Akköy Enerji trusted Siemens’ extensive know-how and expertise, acquired through more than 500 successfully completed electrical engineering projects, including hydroelectric power plants. Thus, Siemens also competently managed the entire electrical equipping of Akköy-II: the onestop, turnkey SPPA-E3000 Complete Electrical Package solution includes all electrical components and services required for the construction of a new power plant. “Siemens has overtaken reliably and professionally all tasks and installations necessary to equip our hydroelectric power plant Akköy-II, from planning to commissioning and training. And they will continue to assist us with local personnel.” Mr. Ahmet Erbas, Plant Manager Akköy Enerji siemens.com/sppa Published by and copyright © 2015: Siemens AG Power and Gas Division Freyeslebenstrasse 1 91058 Erlangen, Germany For more information contact sppa-e3000.energy@siemens.com www.siemens.com/energy/sppa-e3000 E301_FR_CEP_HEPP-Akkoey-II-TRK_e_V1-0 Order no. E50001-G230-A391-X-4A00 Printed in Germany Dispo 05401 Printed on elementary chlorine-free bleached paper. Unrestricted AL:N ECCN:N All rights reserved. Trademarks mentioned in this document are the property of Siemens AG, its affiliates, or their respective owners. Subject to change without prior notice. The information in this document contains general descriptions of the technical options available, which may not apply in all cases. The required technical options should therefore be specified in the contract.