STEPHEN M. FREIMAN, JR. EXPERIENCE PROFILE Working competitively to help build great projects and forge solid relationships for over 20 years. Has sharp ability to interpret contract documents, make timely decisions and motivate the team. Prevents & solves problems from vision to achievement. INDUSTRY KNOW-HOW Heavy/Civil/Underground Tunnels/Shafts/Stations Foundations/Geotechnical Airfield/Flatwork Wet & Dry Utilities Environmental/Hazmat QA/QC & Safety Supervision EDUCATION B.S. Civil Engineering Rutgers University,1988-1992 CURRENT and PRIOR * TRAINING & AFILLIATIONS - OSHA 10 Hour - OSHA 40 HAZWOPER * - NIMS/ICS 100/200/300/400 - CPR, AED and First Aid - USACE CQMC * - CMAA Univ. Quality Mgt., Safety Mgt. & Contract Admin. - Many Bechtel & HDR continuing education & training courses. - ACI Grade I - DOT HAZMAT Management - Various RR Safety Training * - UCA of SME - ASQ * - ASCE * COMPUTER SKILLS Outlook, Word, Excel, Power Point, CM 13, Share Point SECURITY CLEARANCES DOD - JBAB, 2011-2016 TSA & CBP Seal - IAD, 2004-2008 AWARDS 2011 Quality Award – Dulles Corridor Metrorail Project – NATM Tunnel Team OTHER ABILITIES Small Business Operation Route Sales Door-to-Door & In-Home Sales Telemarketing Business Development PROJECT EXPERIENCE Construction Engineering EPC Consultants, Inc. Chief Inspector October 2011 to Present DC Clean Rivers Project – Blue Plains Tunnel DC Water – Washington, DC 24,000-lf tunnel (23-ft ID) with 5 deep slurry wall shafts (50-ft to 132-ft dia.). 9,000-lf of the alignment beneath Potomac & Anacostia Rivers. Lead construction inspection efforts for CSO shaft and near surface structures. Integrate safety, quality & environmental clarity to facilitate contractor success and owner satisfaction. Ensure current documents and procedures are used in field inspection. Participate in review of construction submittals, schedule and pay requests. Provide daily summaries of inspectors’ reports. Spearhead verification & assurance of contactor work quality & efficacy of their QA/QC program. Bechtel Civil Infrastructure / Dulles Transit Partners, LLC Sr. Construction Engineer / NATM Tunnel Office Engineer June 2010 to October 2011 Dulles Corridor Metrorail Project Metropolitan Washington Airports Authority – Tysons Corner, VA Part of a 23-mile extension to WMATA rail system (Silver Line). Twin 1,700lf soft ground tunnels with canopy tubes, lattice girders, steel fiber reinforced shotcrete, waterproofing, CIP concrete final liner & cut and cover sections. Interpreted design drawings & construction requirements to support Field Engineers and Superintendent. Handled construction field changes so work stayed ahead of schedule. Ensured complete supply of materials, tools, PPE and equipment parts at the heading & the batch plant. Worked closely with Superintendent & others to select materials and means & methods for waterproofing, rebar and CIP concrete forming, placing & consolidation processes. Ensured that work execution and final product quality & safety followed procurement, delivery, inspection, warehousing & installation procedures. Reviewed Field & QC Engineer reports & exchanged project progress details with Project Field Engineer on behalf of Sr. Field Engineer. HDR Inc. / HLH7 Sr. Tunnel Inspector September 2008 to June 2010 No. 7 Subway Extension MTA Capital Construction – New York, NY 34th Street Station cavern, shafts, adits & twin TBM drives. Inspected drill & blast cavern, shaft, starter & tail tunnel excavation with rock bolt & shotcrete support. Facilitated safe quality operations with Herrenknecht double-shield TBM setup, mining, PCC segment lining, backfill grouting & contact grouting. Produced timely, detailed daily reports. Helped client avert costly claims and helped job progress properly and well-ahead of schedule. Trained new inspectors in safety, QA field work & documentation. 6799 Howellsville Road, Boyce, VA 22620 freiman2@comcast.net Home 540-837-2319 Mobile 202-308-0219 Page: 1/5 STEPHEN M. FREIMAN, JR. The Lane Construction Corp. Quality Control Manager February 2008 to September 2008 Dulles Corridor Metrorail Project – Utility Relocations Metropolitan Washington Airports Authority – Vienna, VA Subcontract work to Dulles Transit Partners, LLC. Trenched utility work & trenchless crossings up to 60” diameter. Promoted & administered QC processes. Managed QC inspections. Amplified safety, procurement, estimating & training efforts. Planned & conducted pre-work meetings. Completed daily report with work overview, testing summary, materials inspection and DFW checklists. Improved directhire crews’ and subcontractors’ ability to achieve high-quality work. Delon Hampton & Associates, Chartered Sr. Tunnel/Civil Inspector July 2004 to February 2008 D2 Capital Improvements – Washington Dulles International Airport Metropolitan Washington Airports Authority – Chantilly, VA Parsons Management Consultants- PM/CM for APM Tunnel System, Stallion Branch Sanitary Force Mains and Pump Station, Taxiway Q Rehabilitations & New Fourth Runway construction. Made QA and Safety appraisal for tunnel, underground station, utility and airfield construction. Inspected multiple jobs involving: open cut & underground rock mining excavation, blasting, SOE (rock bolts, shotcrete, pile & lagging) CIP concrete structures, waterproofing, underpinning, soilcement stabilization, flatwork concrete (airfield repairs & new runway), sanitary force mains, sewage pump station & booster station, microtunneling and various other utilities & task order work. Served as lead inspector to other civil, mechanical and electrical inspectors. Coordinated construction activity with airport operations and FAA to uphold safety. Compiled detailed daily reports & periodic records of progress, deficiencies & punch list items. Maintained record drawings with all RFI and change updates. Bradshaw Construction Corporation Project Engineer March 2004 to July 2004 72-in. Eastern Transmission Main Reinforcements – Phase II Elizabethtown Water Company – South Bound Brook and Middlesex, NJ Subcontractor to Metra Industries for 1,200-lf of tunnel with 72-in. diameter steel water main underneath the D&R Canal and the Raritan River. Organized proper completion of shaft excavation, blasting, SOE (liner plates, rock bolts, shotcrete, sheet piles), 102-in LOVAT single shield TBM mining (steel ribs & lagging support), dewatering & groundwater treatment, carrier pipe installation and grouting. Coordinated receiving shaft construction through saturated & contaminated soil zone. Supplied materials, bolstered safety, helped manage subcontractors & direct hires. Assisted PM with contract administration, billing and survey work. Collaborated with owner & engineer (Target Price/Cost Reimbursable contract). Made recommendations (TBM head reconfiguration & alternate grouting scheme) that were used to avert severe schedule bust. 6799 Howellsville Road, Boyce, VA 22620 freiman2@comcast.net Home 540-837-2319 Mobile 202-308-0219 Page: 2/5 STEPHEN M. FREIMAN, JR. Frontier-Kemper Constructors Field Engineer June 2003 to March 2004 Weehawken Tunnel New Jersey Transit – Weehawken to North Bergen, NJ 4,100-lf Tunnel enlargement and rehabilitation – commuter light rail. Performed Quality Control, oversight and daily record of rock blasting, ground support (rock dowels, shotcrete, lattice girders and spiling), waterproofing, reinforcing steel, concrete operations and grouting. Supported supervision & management with safety and production goals. Coordinated concrete liner reinforcement steel, embedments, grouting schemes & formwork. Clean Earth Remediation & Construction Services / Barbella Environmental Technologies Project Engineer April 2003 to June 2003 Duraport Marine Terminal – Bayonne, NJ Material transfer for landfill embankment and cap end use. Managed soil delivery, handling & transfer for main and remote port facilities. Generated approved select fill for two New York landfill closure projects. Handled billing, negotiations, labor supervision and disposition of incoming deliveries of contaminated soils. Assured NJ DEPE & US EPA compliance. Directed loads that did not meet contamination levels criteria to treatment and disposal facility. Directed material mixing, CKD drying, equipment operations, barge loading, cargo surveys and tug shipments. Commissioned adaptation of ferry vessel into loading platform as alternative to barge crane. Merco, Inc. Field Engineer April 2002 to January 2003 Bergen Tunnel Rehabilitations New Jersey Transit – Jersey City to Hoboken, NJ Over 4,000-lf tunnel enlargement and rehabilitation – commuter rail. Handled QC inspection of rock excavation, shaft demolition & abandonment, portal rehabilitation, rock bolting, shotcreting, instrumentation, waterproofing, CIP concrete liner & invert and rail work. Developed & implemented work plans. Resolved QC, production and safety issues. Devised tunnel screed material design that achieved double-track, multipitched concrete invert placement in one pass. 6799 Howellsville Road, Boyce, VA 22620 freiman2@comcast.net Home 540-837-2319 Mobile 202-308-0219 Page: 3/5 STEPHEN M. FREIMAN, JR. Melick-Tully & Associates, P.C. Field Geotechnical Engineer September 2001 to April 2002 Various NJ, NY & PA Assignments Commercial, residential and utility construction consulting & testing. Monitored excavation, controlled fill, subsurface explorations, pre-blast survey, pile driving, dynamic compaction, subgrade preparation and septic systems. Performed compaction testing, laboratory testing, rock & soil classification, percolation tests, test borings / test pits / Shelby tubes / rock core logs and sampling. Also carried out forensic determination of foundations and monitoring of defects, limestone surveys & sinkhole remedial grouting. Prospected for surface mining. Produced daily and periodic reports with drawings. Trained new field engineers. Prismatic Development Corporation Project Engineer June 2001 to September 2001 Essex County Correctional Facility Essex County – Newark, NJ Prime subcontractor to Gilbane for new correctional facility construction. Maintained drawing, submittal, RFI and change order logs. Updated record drawings and distributed information to supervisors, craft and subcontractors. Coordinated subcontractor and vendor supply and performance (roofing, stairs, misc. metals, casework, masonry and fireproofing). J. Fletcher Creamer & Son, Inc. Project Engineer and Contract Administrator November 1998 to June 2001 Various Long-Haul & City-Build Underground Utility Projects New Jersey Utility construction involving numerous miles of trenched, directional bore and plowed utilities, plus related civil improvements. Assisted superintendents and project managers with safety, labor relations, equipment & materials management. Performed quantity take-offs, cost estimates and job bidding. Tracked quantities progress and costs. Managed utility protection & avoidance, permitting, traffic control and OCIP insurance reporting. State of New Jersey – Board of Public Utilities Senior Engineer - Utilities April 1997 to November 1998 Bureau of Service Evaluation – One Call Unit New Jersey Underground Facility Protection Act enforcement Investigated utility damage, excavation and markout incidents. Issued Notice of Probable Violation and counseled Attorneys General on UFPA incident facts and presented technical findings. Helped develop the NJ OneCall Excavators’ Handbook & elevated utility protection awareness. 6799 Howellsville Road, Boyce, VA 22620 freiman2@comcast.net Home 540-837-2319 Mobile 202-308-0219 Page: 4/5 STEPHEN M. FREIMAN, JR. Melick-Tully & Associates, P.C. Field Geotechnical Engineer April 1995 to April 1997 Various NJ, NY & PA Assignments See above, “September 2001 to April 2002”. Goodkind & O’Dea, Inc. Construction Inspector November 1994 to February 1995 Disaster #1008 – Northridge Earthquake FEMA Technical Assistance Contract temporary position. Assessed and documented earthquake damage and hazards to be repaired and mitigated. Collaborated with California State Office of Emergency Services on each case to effectively generate and process Damage Survey Reports. Foster Wheeler USA – Environmental Services Division QA/QC Engineer and Alternate/Assistant Health & Safety Officer September 1993 to October 1994 Combe Fill South Landfill Remediation New Jersey DEPE – Chester, NJ Superfund (CERCLA) landfill cleanup/closure Reviewed and submitted vendor & subcontract drawings. Monitored & guided landfill grading, drainage, embankment/fill, clay capping, membrane installation, gas wells, monitoring wells, gas extraction building and water treatment plant. Conducted daily morning safety meetings, performed air monitoring & sampling, trained new hires and fulfilled Safety Officer duties. Participated in HAZMAT recovery team operations utilizing Level B+ (supplied air). Engineering Design Killam Associates Assistant Engineer June 1992 to September 1993 Water Supply Management Group Various water companies and municipal water authorities Water supply, pumping, treatment and distribution system projects – design and construction monitoring. Performed design calculations and materials & equipment selection for water distribution, storage, pumping, treatment and cleaning & lining projects. Helped develop specifications and made permit applications. Rendered design AutoCAD drawings and details for site grading, water system plan & profiles, structural plans & sections and SCADA/PLC logic diagrams. Helped coordinate architectural, structural, electrical, MOT and environmental design elements. 6799 Howellsville Road, Boyce, VA 22620 freiman2@comcast.net Home 540-837-2319 Mobile 202-308-0219 Page: 5/5