Project managment Presentation

advertisement
Portable
Affordable Easy to use Reliabl
e
Score
Goals/
Objectives
Safe
Safe
***
1
1
1
1
4
Portable
0
***
1
0
0
1
Affordable
0
0
***
0
0
0
Easy to use
0
1
1
***
1
3
Reliable
0
1
1
0
***
2
Back 
Back 
Solutions with Electrical Engineering Knowledge
Project Management for
“Toys for Special Needs Children” project
Team Members:Kamal Al Khuffash
Abdullah Al Qaydi
Syed Ghufran Hashmi
920012902
920011367
920013717
Outline:• Introduction:
– Project overview
• Purpose
• Stakeholders
– Clarifications of client needs
• Original Client statement
• Objectives and constraints
• Revised Client statement
• Project Management
– Approach
– Work breakdown schedule
– Obstacles
• Conclusion and request to proceed
Project Overview
The team intends to build an educational
toy for special needs children to develop their
learning skills.
Our client is the “Special Care Center” in
Abu Dhabi, and will be used by the children in
the center.
Client Statement
“The Special Care Center is seeking proposals
from experienced engineering companies for
the design of an educational toy for use in our
classrooms. The toy should be suitable for
children with varying disabilities and should be
appropriate for use in a class room environment.
The toy must be safe, affordable and reliable.”
Objectives
•
•
•
•
•
Safe
Portable
Affordable
Easy to use
Reliable
Pair wise comparison chart
Objectives tree
Revised Client statement
• “The team should build an educational toy to
support the learning experience of the special
needs children in the Special Care Center. As the
client has stated the toy will be used by children
with various disabilities in a classroom
environment, therefore it is important that the
toy has to be portable. The client also required
the toy should be easy to use by the teachers and
the children themselves with a minimum
purchase cost. The most important factors that
the toy’s safety and reliability should be
guaranteed.”
Project Management
• Reasons.
• Tools Used
– GANTT Chart
– Percentage Completion Matrix “PCM”
– Linear Responsibility Chart “LRC”
• Progress
The Team Approach
Problem
Definition
Conceptual
design
Objectives Functions Means
Detailed
Design
Evaluation
Matrix
Building the
prototype
* Circuit
* Materials
* Dimensions
* Codes
Testing the
prototype
Work Breakdown Schedule
Obstacles
• Time Management
• Looking for alternatives
• Early deadline
Summery
• Objectives
–
–
–
–
–
Safe
Portable
Affordable
Easy to use
Reliable
• Revised Client statement
– “The team should build a safe, portable, affordable, easy to use and
reliable educational toy to support the learning experience of the
special needs children in the Special Care Center.”
• Project Management
– GANTT Chart
– LRC
– PCM
Solutions with Electrical Engineering Knowledge
Any Questions??