Portable Affordable Easy to use Reliabl e Score Goals/ Objectives Safe Safe *** 1 1 1 1 4 Portable 0 *** 1 0 0 1 Affordable 0 0 *** 0 0 0 Easy to use 0 1 1 *** 1 3 Reliable 0 1 1 0 *** 2 Back Back Solutions with Electrical Engineering Knowledge Project Management for “Toys for Special Needs Children” project Team Members:Kamal Al Khuffash Abdullah Al Qaydi Syed Ghufran Hashmi 920012902 920011367 920013717 Outline:• Introduction: – Project overview • Purpose • Stakeholders – Clarifications of client needs • Original Client statement • Objectives and constraints • Revised Client statement • Project Management – Approach – Work breakdown schedule – Obstacles • Conclusion and request to proceed Project Overview The team intends to build an educational toy for special needs children to develop their learning skills. Our client is the “Special Care Center” in Abu Dhabi, and will be used by the children in the center. Client Statement “The Special Care Center is seeking proposals from experienced engineering companies for the design of an educational toy for use in our classrooms. The toy should be suitable for children with varying disabilities and should be appropriate for use in a class room environment. The toy must be safe, affordable and reliable.” Objectives • • • • • Safe Portable Affordable Easy to use Reliable Pair wise comparison chart Objectives tree Revised Client statement • “The team should build an educational toy to support the learning experience of the special needs children in the Special Care Center. As the client has stated the toy will be used by children with various disabilities in a classroom environment, therefore it is important that the toy has to be portable. The client also required the toy should be easy to use by the teachers and the children themselves with a minimum purchase cost. The most important factors that the toy’s safety and reliability should be guaranteed.” Project Management • Reasons. • Tools Used – GANTT Chart – Percentage Completion Matrix “PCM” – Linear Responsibility Chart “LRC” • Progress The Team Approach Problem Definition Conceptual design Objectives Functions Means Detailed Design Evaluation Matrix Building the prototype * Circuit * Materials * Dimensions * Codes Testing the prototype Work Breakdown Schedule Obstacles • Time Management • Looking for alternatives • Early deadline Summery • Objectives – – – – – Safe Portable Affordable Easy to use Reliable • Revised Client statement – “The team should build a safe, portable, affordable, easy to use and reliable educational toy to support the learning experience of the special needs children in the Special Care Center.” • Project Management – GANTT Chart – LRC – PCM Solutions with Electrical Engineering Knowledge Any Questions??