Viet Professional Co. Ltd. (VnPro)
149/1D Ung Van Khiem St, Ward 25, Binh Thanh Dist., HCMC
Tel: (08) 35124257 (5 lines) Fax: (08) 35124314
Website: http://www.vnpro.vn Support forum: http://www.vnpro.org
Network channel: http://www.dancisco.com
Knowledge and skills necessary to to plan, configure and verify the implementation of complex enterprise switching solutions using Cisco's
Campus Enterprise Architecture.
1.
Implement VLAN Based Solution, given a Network Design and a set of
Requirements
Determine network resources needed for implementing a VLAN based solution on a network
Create a VLAN based implementation plan
Create a VLAN based verification plan
Configure switch-to-switch connectivity for the VLAN based solution
Configure loop prevention for the VLAN based solution
Verify EIGRP solution was implemented properly using show and debug commands
2.
Implement a Security Extension of a Layer 2 Solution, given a Network
Design and a set of Requirements
Determine network resources needed for implementing a security solution
Create a implementation plan for the security solution
Create a verification plan for the security solution
Configure port security features
Configure general switch security features
Configure private VLANs
Configure VACL and PACL
Viet Professional Co. Ltd. (VnPro)
149/1D Ung Van Khiem St, Ward 25, Binh Thanh Dist., HCMC
Tel: (08) 35124257 (5 lines) Fax: (08) 35124314
Website: http://www.vnpro.vn Support forum: http://www.vnpro.org
Network channel: http://www.dancisco.com
Verify the Security based solution was implemented properly using show and debug commands
Document results of security implementation and verification
3.
Implement Switch Based Layer 3 Services, given a Network Design and a set of Requirements
Determine network resources needed for implementing a Switch based
Layer 3 solution
Create an implementation plan for the Switch based Layer 3 solution
Create a verification plan for the Switch based Layer 3 solution
Configure routing interfaces
Configure Layer 3 Security
Verify the Switch based Layer 3 solution was implemented properly using show and debug commands
Document results of Switch based Layer 3 implementation and verification
4.
Prepare infrastructure to Support Advanced Services
Implement a Wireless Extension of a Layer 2 solution
Implement a VoIP support solution
Implement video support solution
5.
Implement High Availability, given a Network Design and a set of
Requirements
Determine network resources needed for implementing High Availability on a network
Create a High Availability implementation plan
Create a High Availability verification plan
Implement first hop redundancy protocols
Implement switch supervisor redundancy
Verify High Availability solution was implemented properly using show and debug commands
Document results of High Availability implementation and verification