Cycle 14 Peer Review 25-29 June 2012, Hilton, Logan Airport No major changes in Cycle 14 13 topical panels, 1 BPP (LPs, XVPs) XVP Panel: Pundits: met Wed, voted and wrote reports Program as last year: Tues, Wed: topical panels (+XVP) Thurs, Frid: BPP (+ initial organizational session Wed evening) Reviewer Stats: 110 reviewers, including 6 pundits, 13 chairs 2 remote: Webex + telcon CUC 10-11 Oct 2012 Chandra Director’s Office Cycle 14: Final Proposal Statistics 672 proposals submitted: • • • • • GO 452 LP 78 XVP 17 Archive 72 Theory 53 185 approved Oversubscription (time): 5.2 Time allocation: 23.3 Ms CUC 10-11 Oct 2012 Chandra Director’s Office Cycle 14 Proposal Statistics (cont) Time allocation: • Total Time: 23.3 Ms • LP: 5.7 Ms (4.2Ms) • XVP: 6.2 Ms (7.4Ms) CUC 10-11 Oct 2012 Chandra Director’s Office Archive/Theory Results Archive: Budget: $1050K Allocated $1095K (17) Over-subscription: 4.2 CUC 10-11 Oct 2012 Theory: • Budget: $600K • Allocated: $654K (8) • Over-subscription: 5.8 Chandra Director’s Office X-ray Visionary Projects (XVP) 17 proposals submitted, time range: 1-6 Ms Total request: 41.7 Ms (5.6* over-subscribed) 4 allocated, for 1-3 Ms, range of science topics: • • • • COSMOS sky survey expansion 1.7 sq.deg. To 160 ks: 2.8 Ms Planck z<0.35 cluster survey, to complete 165: 1 Ms SMC: deep study of low Z populations: 1.1 Ms PWNe: deep observations of 3: 1.3 Ms Process: XVP panel (6 pundits) discussed all proposals and brought recommendations to BPP Topical panels discussed XVPs and LPs, as usual Final decisions made by BPP after discussion of highestranked proposals BPP moved ~1.2Ms to LPs (+0.2Ms from TPs) Final over-subscription for both = 6.6 CUC 10-11 Oct 2012 Chandra Director’s Office Multi-cycle Proposals 11 submitted for total 3.6, 2.3, 0.5 Ms in Cycles 14,15,16 (resp.) 5 approved for total 0.9, 0.6, 0.1 Ms (inc. 1 TOO) 1 of those approved included joint time w/HST CUC 10-11 Oct 2012 Chandra Director’s Office Cost Proposals in Cycle 14 • • • • • Deadline: 14 Sept 2012 176 proposals received and processed Confirmed: 5 not submitting (foreign PIs) Currently 19 with incomplete documentation No early observations this cycle, so all can be processed together CUC 10-11 Oct 2012 Chandra Director’s Office GO Budget • GO budget: $10.5M • Includes: Observing, Archive ($1.05M), Theory ($0.6M) • Cycle 14: overall decreasing budget projected ~$0.7M cut for first time • Cycle 12-16: 15-25% increase in awarded time (orbit evolution) • Cycle 13 awards: median $42K, average $54K, decrease ~10% SR2012: • CXC requested GO budget augmentation to compensate decrease in budget and $/time awarded • 50% of proposed augmentation was approved • theory, archive funding at same level • increase in GO total budget • Cycle 14 awards: median $46.4K, average $59K CUC 10-11 Oct 2012 Chandra Director’s Office NASA/China Restrictions and Chandra NASA GIC 12-01, 9 Feb 2012: restricting bi-lateral collaboration with China or Chinese-government owned entity RJB+MSFC personnel met with NASA HQ personnel to discuss issue China-US/China-only proposals considered bi-lateral and cannot be supported No bi-lateral China-US proposals approved in Cycle 14 All Cost PIs required to sign a form: “Assurance of Compliance” with this regulation This restriction will be explicitly included in the Cycle 15 CfP CUC 10-11 Oct 2012 Chandra Director’s Office Cycle 15: Planned Schedule • • • • • • CfP, POG etc. release: 13 Dec 2012 Proposal Deadline: 14 Mar 2013 Peer Review: 17-21 June 2013 Results: 12 July 2013 E-letters: by 16 August 2013 Cost Deadline: 17 Sept 2013 CUC 10-11 Oct 2012 Chandra Director’s Office Cycle 15: X-ray Visionary Projects Cycle 14: • 4 (of 17) proposals accepted • Over-subscription 6.6 (time) Surveyed panel chairs: • Generally supported balance of time (~ on category) • Most did not feel XVPs were >> LPs, just larger • Supported continuation of XVP-level language Cycle 15: plan to include a third XVP call Time available is significantly lower, 20 Ms (TBR): • GO 11 Ms • LP 4 Ms • XVP 5 Ms Propose to run peer review similarly CUC 10-11 Oct 2012 Chandra Director’s Office Cycle 15: Joint Programs HST, Spitzer (reinstated), XMM-Newton, NOAO, NRAO, Suzaku Possible new joint programs: NRAO/ALMA: discussions open with new director (Beasley) for ALMA Cycle 2 NuSTAR: recently launched, contacted Harrison, Stern to open discussion CUC 10-11 Oct 2012 Chandra Director’s Office