Chandra Users’ Committee CXC Manager’s Status Report For the period October 07 – March 08 Roger Brissenden CXC Manager 9 April 2008 Topics • Program Level Status – Program Management – Spacecraft – Science Instruments and Calibration – – – – Mission Planning OCC Data Processing CXCDS – Chandra Director’s Office – Education and Public Outreach • Mission Metrics • Chandra Grant Awards 19 September 2007 CXC Status Report/CUC Page 2 Program Level Status • Program Management – Budget: The CXC’s budget is unchanged from the current Program Operating Plan (POP07, submitted Oct 07), and expenditures are on track to meet the budget. We presented POP08 to NASA headquarters on 3/28/08. – Senior Review: The proposal for the Senior Review of the Chandra Program was submitted to NASA on 3/12/08. A presentation to the review board will be given on 4/23/08. – Staffing: Staff numbers remain near FY06 levels, as planned. Sabina Bucher has been appointed Flight Operations Team manager to replace Dan Shropshire. Ms. Bucher, who has been with the FOT for 8 years, was previously a mission planner and a propulsion engineer, and most recently the Mission Planning manager. – Facilities: The OCC’s backup computer system, which has been installed in the CfA’s Cambridge Discovery Park facility, is being configured for test and will be operational in summer 08. The OCC’s operations areas and common spaces are being painted and renovated. 19 September 2007 CXC Status Report/CUC Page 3 CXC Organization MSFC Space Systems Programs & Projects Office Hefner Chandra X-ray Center Program Office Tananbaum Canizares (MIT) Brissenden Education & Outreach Lestition Director's Office Wilkes Grants Award Section Sozanski Flight Operations Team Bucher Online Operations Mission Planning & Testing Spacecraft Engineering Flight Software Factory Support Team 19 September 2007 OCC Operations Eagan Science Tananbaum Facility Systems Team Integration & Ground S/W Maintenance Ground Ops Team Ops. Science Support Calibration Mission Planning Sci. Data Sys. Planning IPI Teams CXC Status Report/CUC Science Data System Fabbiano Systems Engineering Holmes Hardware & Systems Software Development Test Archive Operations Data Processing Operations Page 4 Program Level Status • Spacecraft – Continues to operate extremely well overall – No spacecraft anomalies during this period – Nominal passages through winter eclipse season, 12/21/07 – 1/3/08, and two lunar eclipses, 10/10/07 and 2/6/08 • Science Instruments – Instruments are operating extremely well. – The HRC +Y Shutter was used successfully in an observation of the Crab Pulsar to reduce the event rate below telemetry saturation in order to enable high-precision timing. – Tests of turning off the ACIS detector housing heater were successful and the Flight Directors’ Board has approved turning off the heater permanently, as early as 4/7. This action should result in a higher fraction of ACIS observations having a cold and stable focal plane temperature. 19 September 2007 CXC Status Report/CUC Page 5 Program Level Status • Mission Planning – load-interrupting TOOs Accepted 09/20/07 10/10/07 10/26/07 12/19/07 01/14/08 02/10/08 02/15/08 Target Time* SGR 1806-20 H 2356-309 Comet 17P/Holmes m81-ot071213 NGC2770/SN2007uy GRB 080207 4U1812-12 4d 20h 0d 20h 4d 20h 2d 05h 5d 11h 5d 14h 2d 11h *Time from TOO approval to start of observation • OCC – Following an extensive security audit, the OCC received the formal Authority to Operate from NASA on 9/17/07. – The OCC Data System and GRETA networks have been migrated to a NetApp storage cluster for increased reliability. 19 September 2007 CXC Status Report/CUC Page 6 Program Level Status • Data Processing – – • Automatic processing is current; time from end of observation to delivery to user remains at about one day (median increased slightly during this period due to a few difficult-to-process observations of Venus) Data reprocessing (Repro 3) was completed 11/05/07. 514 HRC-I observations were reprocessed to apply new calibrations (completed 11/26/07), and reprocessing of an additional 157 observations to apply observation parameter corrections is in preparation. CXC Data System Releases Version CIAO 4.0 B3 DS 7.6.11.3 CIAO 4.0 DS 7.6.11.4 Date 11/14/07 12/14/07 12/15/07 12/19/07 CIAO4.0.1 DS 7.6.11.5 DS 7.6.11.6 2/15/08 2/13/08 4/2/08 19 September 2007 Main contents Sherpa/ChIPS/tools release Cycle 10 proposal release; new TOO Manager GUI Major CIAO Data Analysis release One-day-turnaround patch release to sync EPHIN processing pipeline with the Offline System for turnoff of EPHIN G detector high voltage ObsVis upgrades for grids for CfP10 P009 database; HRC telemetry bit fix ACIS Fid cooling handling CXC Status Report/CUC Page 7 Program Level Status • CXC Data System Planned Releases Version DS 7.6.11.7 CIAO 4.0.2 DS 7.6.11.8 DS 7.7 Date Apr 4/17 5/28 Fall Main contents OFLS upgrade - SOE/ORL files Mac/Intel 10.5 (Leopard) Port L3 Archive prep release - migration to Sybase 15 Operations migration to Solaris10 • Level 3 Catalogue Version CAT 2.6 CAT 2.6.1 CAT 2.6.2 CAT 2.6.3 CAT 2.7 CAT 2.7.1 CAT 2.8 CAT 3.0 19 September 2007 Date 11/2 12/7 1/4 1/11 2/15 3/12 May Aug Main contents Repro; Science upgrades Science pipeline upgrades Low frequency background enhancements Infrastructure upgrades SAP & manual QA; science upgrades Integration analysis feedback Complete science pipeline & infrastructure Feedback from science test; ops interfaces CXC Status Report/CUC Page 8 Program Level Status • Calibration Database (CalDB) Releases CalDB 3.4.2 12/13/07 ACIS T-gain Epoch 31 (8/07-10/07), Cycle10 PIMMS Effective Areas CalDB 3.4.3 3/31/08 ACIS T-gain Epoch 32 (11/07-1/08), T-gain Epoch 0 (9/99-1/00) • GO Program – Cycle 10: 639 GO proposals were received by the 3/20 deadline; 89 Msec requested (5.4x oversubscription) – Peer review is scheduled for the week of 6/16/08 • Chandra Fellows program – – – – Chandra Fellows symposium was held at CfA, 10/10/07 99 applications for the current cycle were received by 10/31/07 Fellowship panel met at CfA on 1/16/08 to rank the applicant list 5 Fellows have accepted; will be hosted at U. Michigan, CalTech, Berkeley, Hawaii, Stanford 19 September 2007 CXC Status Report/CUC Page 9 Program Level Status • Education and Public Outreach – – – – – – – – – – – – – – 15 press activities (1 media telecon, 9 press releases, 4 image releases, 1 press advisory) 150* print articles (incl. 1 NY Times, 2 Wash. Post (one front page teaser), USA Today 532* web articles 65 TV broadcasts on national news (media telecon), M33 x-7 story on Fox affiliate, 3 stories related to 8 Years conference on WAAY (Huntsville ABC affiliate), separate WAAY broadcast on RX J0822-4300 Released multi-wavelength Braille book containing Chandra images, plus audio version on Chandra public web site 5 radio broadcasts, 4 on media telecon, 1 on Braille book sn2006gy recognized by Time Magazine as a “Top 10 Science Discovery” Science News and space.com cite several Chandra results in “The Year in Review” and “Best Discoveries of 2007” 21 education events and workshops 7 Chandra podcasts released, including first Chandra HD podcast 259 requests for 48,130 items of Chandra materials 74 permissions to use Chandra content and images Held Cycle 9 Chandra EPO peer review. Reviewed 12 proposals, funded 2 individual and 5 team and institutional for $183k Contracted with Goodman Research Group for an independent summative (outcome oriented) impact evaluation of the education and outreach components of the EPO program *Through February 2008 19 September 2007 CXC Status Report/CUC Page 10 Mission Metrics MUPS Fuel Usage 19 September 2007 CXC Status Report/CUC Page 11 Mission Metrics Thruster Warm Starts 19 September 2007 CXC Status Report/CUC Page 12 Mission Metrics Observing Efficiency 0.90 0.85 0.80 Scheduled Efficiency 0.75 0.70 0.65 0.60 0.55 0.50 High solar radiation during 12/06 0.45 0.40 Mar-07 Apr-07 19 September 2007 May-07 Jun-07 Jul-07 Aug-07 Sep-07 Oct-07 CXC Status Report/CUC Nov-07 Dec-07 Jan-08 Feb-08 Page 13 Data Delivery Effectiveness As of middle of following month Month Num ber of Obs Days to Data Delivery Mi n Avg Max As of 3/11/08 Number Deliv Number Outstanding Number Deliv Number Outstandin g Mar-07 84 0 1 5 84 0 84 0 Apr07 65 0 1 3 65 0 65 0 May-07 54 0 1 8 54 0 54 0 Jun-07 69 0 1 3 69 0 69 0 Jul-07 83 0 1 3 83 0 83 0 Aug-07 61 0 1 14 61 0 61 0 Sep-07 76 0 1 16 76 0 76 0 Oct-07 73 0 2 12 67 6 73 0 Nov-07 78 0 1 22 77 1 78 0 Dec-07 89 0 2 18 89 0 89 0 Jan-08 98 0 1 3 98 0 98 0 Feb-08 145 0 1 11 145 0 145 0 19 September 2007 CXC Status Report/CUC Notes Page 14 Grant Award Effectiveness Month of Data Delivery Federal Grants (1,3) SAO Grants (2) As of middle of following month As of 3/18/08 NonFederal Grants (3) No. Grants Awarded No. Outstandin g Avg days to award (4) No. Grants Awarded No. Outsta nding Mar-07 0 14 1 13 9 14 0 Apr-07 0 11 2 9 16 11 0 May-07 1 10 7 3 10 10 0 Jun-07 1 16 15 1 18 16 0 Jul-07 0 13 11 2 17 13 0 Aug-07 1 17 6 11 32 17 0 Sep-07 3 11 2 9 15 11 0 Oct-07 2 12 8 4 19 12 0 Nov-07 0 6 3 3 9 6 0 Dec-07 0 41 33 8 12 41 0 Jan-08 7 51 33 18 36 51 0 10 9 1 26 9 1 Feb-08 0 (1)1. Grants awarded to scientists at Federal institutions as interagency transfers through MSFC. (2)2. Grants awarded to scientists at non-Federal institutions through SAO Contracts and Grants Department. (3)3. Number of grants eligible for award, for which data were delivered to the observer in the month. (4)4. Average days from data delivery to grant award to observer. Outstanding Awards Proposal no, Comments 9700400