PPT

advertisement
Chandra Users’ Committee
CXC Manager’s Status Report
For the period October 07 – March 08
Roger Brissenden
CXC Manager
9 April 2008
Topics
• Program Level Status
– Program Management
– Spacecraft
– Science Instruments and Calibration
–
–
–
–
Mission Planning
OCC
Data Processing
CXCDS
– Chandra Director’s Office
– Education and Public Outreach
• Mission Metrics
• Chandra Grant Awards
19 September 2007
CXC Status Report/CUC
Page 2
Program Level Status
• Program Management
– Budget: The CXC’s budget is unchanged from the current Program
Operating Plan (POP07, submitted Oct 07), and expenditures are on track
to meet the budget. We presented POP08 to NASA headquarters on
3/28/08.
– Senior Review: The proposal for the Senior Review of the Chandra
Program was submitted to NASA on 3/12/08. A presentation to the review
board will be given on 4/23/08.
– Staffing: Staff numbers remain near FY06 levels, as planned. Sabina
Bucher has been appointed Flight Operations Team manager to replace
Dan Shropshire. Ms. Bucher, who has been with the FOT for 8 years, was
previously a mission planner and a propulsion engineer, and most recently
the Mission Planning manager.
– Facilities: The OCC’s backup computer system, which has been installed
in the CfA’s Cambridge Discovery Park facility, is being configured for
test and will be operational in summer 08. The OCC’s operations areas
and common spaces are being painted and renovated.
19 September 2007
CXC Status Report/CUC
Page 3
CXC Organization
MSFC Space Systems Programs & Projects Office
Hefner
Chandra X-ray Center Program Office
Tananbaum
Canizares (MIT)
Brissenden
Education & Outreach
Lestition
Director's Office
Wilkes
Grants Award Section
Sozanski
Flight Operations Team
Bucher
Online Operations
Mission Planning & Testing
Spacecraft Engineering
Flight Software
Factory Support Team
19 September 2007
OCC Operations
Eagan
Science
Tananbaum
Facility Systems Team
Integration & Ground
S/W Maintenance
Ground Ops Team
Ops. Science Support
Calibration
Mission Planning
Sci. Data Sys. Planning
IPI Teams
CXC Status Report/CUC
Science Data System
Fabbiano
Systems Engineering
Holmes
Hardware & Systems
Software Development
Test
Archive Operations
Data Processing Operations
Page 4
Program Level Status
• Spacecraft
– Continues to operate extremely well overall
– No spacecraft anomalies during this period
– Nominal passages through winter eclipse season, 12/21/07 – 1/3/08, and
two lunar eclipses, 10/10/07 and 2/6/08
• Science Instruments
– Instruments are operating extremely well.
– The HRC +Y Shutter was used successfully in an observation of the Crab
Pulsar to reduce the event rate below telemetry saturation in order to
enable high-precision timing.
– Tests of turning off the ACIS detector housing heater were successful and
the Flight Directors’ Board has approved turning off the heater
permanently, as early as 4/7. This action should result in a higher fraction
of ACIS observations having a cold and stable focal plane temperature.
19 September 2007
CXC Status Report/CUC
Page 5
Program Level Status
• Mission Planning – load-interrupting TOOs
Accepted
09/20/07
10/10/07
10/26/07
12/19/07
01/14/08
02/10/08
02/15/08
Target
Time*
SGR 1806-20
H 2356-309
Comet 17P/Holmes
m81-ot071213
NGC2770/SN2007uy
GRB 080207
4U1812-12
4d 20h
0d 20h
4d 20h
2d 05h
5d 11h
5d 14h
2d 11h
*Time from TOO approval to start of observation
• OCC
– Following an extensive security audit, the OCC received the formal
Authority to Operate from NASA on 9/17/07.
– The OCC Data System and GRETA networks have been migrated to a
NetApp storage cluster for increased reliability.
19 September 2007
CXC Status Report/CUC
Page 6
Program Level Status
•
Data Processing
–
–
•
Automatic processing is current; time from end of observation to delivery to user
remains at about one day (median increased slightly during this period due to a
few difficult-to-process observations of Venus)
Data reprocessing (Repro 3) was completed 11/05/07. 514 HRC-I observations
were reprocessed to apply new calibrations (completed 11/26/07), and
reprocessing of an additional 157 observations to apply observation parameter
corrections is in preparation.
CXC Data System Releases
Version
CIAO 4.0 B3
DS 7.6.11.3
CIAO 4.0
DS 7.6.11.4
Date
11/14/07
12/14/07
12/15/07
12/19/07
CIAO4.0.1
DS 7.6.11.5
DS 7.6.11.6
2/15/08
2/13/08
4/2/08
19 September 2007
Main contents
Sherpa/ChIPS/tools release
Cycle 10 proposal release; new TOO Manager GUI
Major CIAO Data Analysis release
One-day-turnaround patch release to sync EPHIN
processing pipeline with the Offline System for
turnoff of EPHIN G detector high voltage
ObsVis upgrades for grids for CfP10
P009 database; HRC telemetry bit fix
ACIS Fid cooling handling
CXC Status Report/CUC
Page 7
Program Level Status
• CXC Data System Planned Releases
Version
DS 7.6.11.7
CIAO 4.0.2
DS 7.6.11.8
DS 7.7
Date
Apr
4/17
5/28
Fall
Main contents
OFLS upgrade - SOE/ORL files
Mac/Intel 10.5 (Leopard) Port
L3 Archive prep release - migration to Sybase 15
Operations migration to Solaris10
• Level 3 Catalogue
Version
CAT 2.6
CAT 2.6.1
CAT 2.6.2
CAT 2.6.3
CAT 2.7
CAT 2.7.1
CAT 2.8
CAT 3.0
19 September 2007
Date
11/2
12/7
1/4
1/11
2/15
3/12
May
Aug
Main contents
Repro; Science upgrades
Science pipeline upgrades
Low frequency background enhancements
Infrastructure upgrades
SAP & manual QA; science upgrades
Integration analysis feedback
Complete science pipeline & infrastructure
Feedback from science test; ops interfaces
CXC Status Report/CUC
Page 8
Program Level Status
• Calibration Database (CalDB) Releases
CalDB 3.4.2 12/13/07 ACIS T-gain Epoch 31 (8/07-10/07),
Cycle10 PIMMS Effective Areas
CalDB 3.4.3 3/31/08 ACIS T-gain Epoch 32 (11/07-1/08),
T-gain Epoch 0 (9/99-1/00)
• GO Program
– Cycle 10: 639 GO proposals were received by the 3/20 deadline;
89 Msec requested (5.4x oversubscription)
– Peer review is scheduled for the week of 6/16/08
• Chandra Fellows program
–
–
–
–
Chandra Fellows symposium was held at CfA, 10/10/07
99 applications for the current cycle were received by 10/31/07
Fellowship panel met at CfA on 1/16/08 to rank the applicant list
5 Fellows have accepted; will be hosted at U. Michigan, CalTech,
Berkeley, Hawaii, Stanford
19 September 2007
CXC Status Report/CUC
Page 9
Program Level Status
•
Education and Public Outreach
–
–
–
–
–
–
–
–
–
–
–
–
–
–
15 press activities (1 media telecon, 9 press releases, 4 image releases, 1 press advisory)
150* print articles (incl. 1 NY Times, 2 Wash. Post (one front page teaser), USA Today
532* web articles
65 TV broadcasts on national news (media telecon), M33 x-7 story on Fox affiliate, 3 stories
related to 8 Years conference on WAAY (Huntsville ABC affiliate), separate WAAY broadcast
on RX J0822-4300
Released multi-wavelength Braille book containing Chandra images, plus audio version on
Chandra public web site
5 radio broadcasts, 4 on media telecon, 1 on Braille book
sn2006gy recognized by Time Magazine as a “Top 10 Science Discovery”
Science News and space.com cite several Chandra results in “The Year in Review” and “Best
Discoveries of 2007”
21 education events and workshops
7 Chandra podcasts released, including first Chandra HD podcast
259 requests for 48,130 items of Chandra materials
74 permissions to use Chandra content and images
Held Cycle 9 Chandra EPO peer review. Reviewed 12 proposals, funded 2 individual and 5
team and institutional for $183k
Contracted with Goodman Research Group for an independent summative (outcome oriented)
impact evaluation of the education and outreach components of the EPO program
*Through February 2008
19 September 2007
CXC Status Report/CUC
Page 10
Mission Metrics
MUPS Fuel Usage
19 September 2007
CXC Status Report/CUC
Page 11
Mission Metrics
Thruster Warm Starts
19 September 2007
CXC Status Report/CUC
Page 12
Mission Metrics
Observing Efficiency
0.90
0.85
0.80
Scheduled Efficiency
0.75
0.70
0.65
0.60
0.55
0.50
High solar radiation
during 12/06
0.45
0.40
Mar-07
Apr-07
19 September 2007
May-07
Jun-07
Jul-07
Aug-07
Sep-07
Oct-07
CXC Status Report/CUC
Nov-07
Dec-07
Jan-08
Feb-08
Page 13
Data Delivery Effectiveness
As of middle of following month
Month
Num
ber
of
Obs
Days to Data
Delivery
Mi
n
Avg
Max
As of 3/11/08
Number
Deliv
Number
Outstanding
Number
Deliv
Number
Outstandin
g
Mar-07
84
0
1
5
84
0
84
0
Apr07
65
0
1
3
65
0
65
0
May-07
54
0
1
8
54
0
54
0
Jun-07
69
0
1
3
69
0
69
0
Jul-07
83
0
1
3
83
0
83
0
Aug-07
61
0
1
14
61
0
61
0
Sep-07
76
0
1
16
76
0
76
0
Oct-07
73
0
2
12
67
6
73
0
Nov-07
78
0
1
22
77
1
78
0
Dec-07
89
0
2
18
89
0
89
0
Jan-08
98
0
1
3
98
0
98
0
Feb-08
145
0
1
11
145
0
145
0
19 September 2007
CXC Status Report/CUC
Notes
Page 14
Grant Award Effectiveness
Month of
Data
Delivery
Federal
Grants
(1,3)
SAO Grants (2)
As of middle of following month
As of 3/18/08
NonFederal
Grants (3)
No.
Grants
Awarded
No.
Outstandin
g
Avg days
to award
(4)
No.
Grants
Awarded
No.
Outsta
nding
Mar-07
0
14
1
13
9
14
0
Apr-07
0
11
2
9
16
11
0
May-07
1
10
7
3
10
10
0
Jun-07
1
16
15
1
18
16
0
Jul-07
0
13
11
2
17
13
0
Aug-07
1
17
6
11
32
17
0
Sep-07
3
11
2
9
15
11
0
Oct-07
2
12
8
4
19
12
0
Nov-07
0
6
3
3
9
6
0
Dec-07
0
41
33
8
12
41
0
Jan-08
7
51
33
18
36
51
0
10
9
1
26
9
1
Feb-08
0
(1)1. Grants awarded to scientists at Federal institutions as interagency transfers through MSFC.
(2)2. Grants awarded to scientists at non-Federal institutions through SAO Contracts and Grants Department.
(3)3. Number of grants eligible for award, for which data were delivered to the observer in the month.
(4)4. Average days from data delivery to grant award to observer.
Outstanding
Awards
Proposal no,
Comments
9700400