Commercial in Confidence TESA Report Definition – RM.04 Project Summary Including Risk Ratings Customer Contract number Proposal number Business/project number LogicaCMG Project Manager ODPM Project Manager Project/document reference Issue Issue date Status : : : : : : : : : : Prepared by : Reviewed by : Checked by : Approved (LogicaCMG) : Approved (ODPM) : Office of the Deputy Prime Minister (ODPM) S687-ESAD UK/2005/7050 EC201486 Paul Dickey-Collas Nigel Williams EC201486 / 13/06 1.0 19/05/06 Definitive LogicaCMG Analyst Swarup Dasgupta Date: 19/05/06 MIS Team Lead Chris Crow Date: 19/05/06 LogicaCMG Analyst Mark Tolhurst Date: 19/05/06 Paul Dickey-Collas Project Manager ...................................... Date: ............................. Nigel Williams Project Manager ...................................... Date: ............................. © LogicaCMG plc 2005. This document and its contents are the confidential property of LogicaCMG plc. It should not be copied, reproduced, modified, altered, or circulated to any third party, in any form or media, without the prior written consent of LogicaCMG plc. Report Definition – page 1 of 7 Commercial in Confidence Commercial in Confidence TESA 19/05/06 Document Control Amendment History: Date Issue Status Author 02/05/06 0.1 First draft SD 19/05/06 1.0 Draft for review and sign off SD Distribution: Name and role Project Team Nigel Williams – ODPM Project Manager Paul Dickey-Collas – LCMG Project manager Alan Hazell – ODPM Technical Assurance Mark Malvisi - OPDM Greg Cusack – ODPM Business Analyst Mark Tolhurst – LCMG Analyst I R S 1.0 I R R R&S R&S R I Not issued For information only – no action required For review – comments to be directed to the Project Manager For sign-off 106752571 page 2 of 7 © LogicaCMG plc 2005 Commercial in Confidence Commercial in Confidence TESA 19/05/06 Report Definition Report Title Report Reference Category Purpose Adhoc / Standard Produced by End Users Access / Distribution Frequency of Use Data Refresh Output Media Document References Notes Project Summary Including Risk Ratings RM.04 Project Monitoring Review projects according to risk / select risky projects (Actual Projects Only- ‘Live, Closed and Financially Complete’) Standard Project Officer Project Officer, PMC Reporting tool Monthly Daily PDF (default), HTML The report is to be designed in accordance with the TESA reporting style guide (TESA Reporting Style Guide.doc) 106752571 page 3 of 7 © LogicaCMG plc 2005 Commercial in Confidence Commercial in Confidence TESA 19/05/06 Report Layout The layout adheres to the standard report template as specified in TESA Reporting Style Guide.doc. Report Type Tabular Report Header Header layout as per default report header as specified in TESA Reporting Style Guide.doc. Item Comments Parameter list Display parameters as per list below and any selected values. If no values have been chosen from an optional parameter, indicate this in the header, i.e. Measure(s): All Measures Report Body Page fields are report items on which the page breaks. Row fields are those which are grouped together in a tabular list, or which form the rows in a crosstab report. Column fields are the columns, in either a tabular list or a crosstab. Page fields Row fields Column fields Project ID, Project Name, Applicant, Applicant Type, Expenditure Eligible Expenditure,Commitment Grant Risk Rating, Slippage Score, Category Type Outputs Score Summary Data Detail any aggregations within the report, including sub totals. Item Comments None Parameter List Parameters available to users are to be presented via a separate “Prompt Page”. The prompt page adheres to the standard report template as specified in TESA Reporting Style Guide.doc. Sequence Name Report Field Comments Optional 1 2 3 Region Programme Measure 4 Action Plan See name See name Measure Identifier + Measure Name See name 5 Applicant See name This is defined by the action plan flag on the project table. 106752571 Free Form Entry Multiple Select N N Y Default Value None None All N Drop down N Drop down N Drop down N N Y Y All N Drop down Y Y All N Drop down Y page 4 of 7 © LogicaCMG plc 2005 Commercial in Confidence Commercial in Confidence TESA 6 7 8 Support Type Project Rating See name High, Medium , Low, No Rating 19/05/06 Y Y Y All All All N Drop down N Drop down N Drop down Y Y Y Sort Order Report Field Project ID Direction Asc Horizontal / Vertical (applies to Crosstab reports only) Report Items Ref 1 Label Project ID Description 2 Project Name 3 Applicant 4 Applicant Type 5 Risk Rating Type of applicant, eg Local Authority, Further Education, Private Sector, Voluntary, etc Risk rating for project 6 Expenditure Category Type Expenditure type for project (cap/rev/cap&rev) 7 Expenditure Grant Total Total expenditure Grant (todate) Split by Expend Category Type. 8 Commitment Grant Total Total commitment Grant (GBP). 9 Slippage Score Percentage of committed spend achieved pro rated to date Source [Project Measure]. [Project Identifier] [Project Measure]. [Project Name] [Project Measure]. [Organisation Name] [Project Measure].[Organisation Type Description] [Project Measure].[Overall Risk Rating] [Project Measure].[Expenditure Category Type name] [Project Measure].[Expenditure GrantGBP] [Project Measure].[Commitment GrantGBP] [Project Measure].[Expenditure Grant Total GBP] / [Project Measure].[Commitment Grant Total GBP] 106752571 Format Text Comments Report filtered for Actual projects only. Text Text Text Text Text Numeric (N,NNN - 0 DPs) Percentage (NN.NN % - 2 DPs) Text colour as per traffic lighting page 5 of 7 © LogicaCMG plc 2005 Commercial in Confidence Commercial in Confidence TESA Ref 10 Label Output Score Description Percentage of committed outputs which have exceeded their (pro-rata'd) commitment profile to date Source [Project Measure].[Achieved Indicator] / [Project Measure].[Contracted Indicator] 106752571 19/05/06 Format Percentage (NN.NN % - 2 DPs) Text colour as per traffic lighting Comments page 6 of 7 © LogicaCMG plc 2005 Commercial in Confidence Commercial in Confidence TESA 19/05/06 Suggested Report Layout 1 2 3 4 5 Project ID Project Name Applicant Applicant Type Risk Rating 6 Expenditure Category Type 7 8 9 10 Expenditure Grant Total Commitment Grant Total Slippage Score Output Score Proj_1 Proj_name_1 App_1 App_type_2 High Cap/Rev 50 46 Proj_2 Proj_name_2 App_2 App_type_2 Medium Cap/Rev 75 95 Proj_3 Proj_name_3 App_3 App_type_2 Low Cap/Rev 85 5 Proj_4 Proj_name_4 App_4 App_type_2 Cap/Rev 20 10 … … … … … … … 106752571 … page 7 of 7 © LogicaCMG plc 2005 Commercial in Confidence