RESUME MOHAMMAD ZUBAIR MOHAMMAD ZUBAIR Muscat, Oman Cell: +968-94056294 sirfzubair@hotmail.com 8 years of Buildings, Marine and Infrastructure experience OBJECTIVE: To work in a prestigious organization so that my involvement could contribute positively towards the growth and success of the company and myself. EDUCATION: Sir Syed University of Engineering and Technology – Karachi, Pakistan. B.S in Civil Engineering. December 2003 Major GPA: 3.06/4.00 COMPUTER SKILLS: Complete project documentation using MS Word, Excel and Access. Familiar with AutoCAD and STAAD 3. Learn new engineering and general softwares quickly. RELATED Oman Designers, Oman EXPERIENCE: Resident Structural Engineer: (BUILDINGS) July 2010-present Building the “Headquarter building for ministry of manpower at airpot heights, Muscat” tasks comprise: Reviewing the agreement, conditions of contract and BOQ. Checking the entire required documents as per contract. Reviewing the specifications, scope of work. Reviewing the design drawings of architect, structure and MEP. Reviewing the clause 14 program of work submitted by the contractor. Studying and replying to the method statement of each activity. Reviewing and checking monthly progress. Final checking of as built drawings. Commenting and replying to RFIs. Issuing site instructions and NCRs. Coordinating construction activities Checking material, reinforcement and formwork as per approved drawings and specifications. Attending all site meetings i.e. progress meeting, technical meeting, safety meeting, staff meeting and progress review meeting with client and contractor. Attending other meetings as directed by project director. Maintaining a daily diary that donates the daily construction activities and observations. Page 1 of 4 RESUME MOHAMMAD ZUBAIR Coordinating and communicating with the project director, engineering mangers and others as required on applicable technical and commercial issues. Providing daily supervision, guidance and assignments to various field engineers. Developing and implement safety procedures and program as required. Orion Engineering Consultants, DUBAI Oct 2008-Jan 2010 Project Engineer: (BUILDINGS) Inspecting various warehouse and office building projects in Jebel Ali Free zone (JAFZA) Dubai, duties included: Coordinating construction activities. Quality control/ Quality assurance. Checking the reinforcement & formwork. Checking the Lay out for block works, tiles marbles, plaster, paint, false ceiling etc. Attending all site meetings as well as following routine meetings: o Progress meetings o Technical meetings o Safety & planning meetings Coordinating with contractors regarding site executions, progress, checking & verifying the quantities of the work done as per site. Discussing the technical issues with Authorities & client Supervising the site in such a way that it should meet as per work schedule. Investigating the cause of Problem in case of any difficulty. DUTCO Balfour Beatty Construction Group, DUBAI Site Engineer: (MARINE) March 2008 – Sep 2008 Constructed “New FPSO Quay Wall” for Dry Dock World Dubai, which incorporated; a) b) c) d) Oct 2006–Sep 2008 Reclamation Vibro-Compaction Pile Walls Reinforced Concrete structures for the Bollards and Fenders. Taking instruction from the manager and assisting him in supervision. Page 2 of 4 RESUME MOHAMMAD ZUBAIR Coordinating with site personnel in monitoring site progress and ensuring the smooth progress of project June 2007 – March 2008 Site Engineer: (MARINE) Constructed Quay wall for “The Lagoons (Sama Dubai)” duty included; a) b) c) d) e) f) g) Excavation Dewatering Formation for Quay wall Rock foundation Blinding Placing of mass concrete blocks Final trimming for the canal Carried out construction activities as per method statement. Read drawings and executed actions accordingly. Maintained Haul roads of the complete project for the movement of more than 400 trucks, on ‘DAY WORKS’ directly from the client. Planned and forecasted manpower and material requirements Prepared and arranged weekly schedule, to control direct workers. Site Engineer: (ROADS / HIGHWAYS) Oct 2006 – June 2007 Constructed “Widening of ‘Emirates Road’ from six existing lanes to twelve proposes lanes” which integrated, Surveying, setting out and levels. Earthworks by different means, Dozer, grader, trucks and dumpers. Laying services ducts as per schedule given by each authority. Monitored site progress and productivity level. Prepared daily program, daily, weekly and monthly progress reports. Checked the adherence of all relevant drawings & provisions. Scrutinized the progress of the sub-contractor. Followed the specifications including civil works general specifications for construction and testing of materials. Assisted construction team in all aspect of earthworks i.e. Excavation, Formation, Sub- Base, Wet Mix, Prime Coat, Asphalt Concrete Base Course and Bituminous Wearing Course. Managed manpower and machinery of the project. Communicated with client and consultant for the approval of work. Page 3 of 4 RESUME MOHAMMAD ZUBAIR Provided instruction and support to fresh graduate engineers. Omer Bin Atik for General Const. Est. SAUDI ARABIA Jan 2005 – April 2006 Site Engineer: (ROADS / HIGHWAYS) Aided in design and building of various road concrete structures. Organized bar bending schedule of a large number of culverts. Managed and computed the quantities of materials i.e. concrete, steel and asphalt. Allocated suitable resources to specific location within the project Executed and supervised the project. Checked the performance of equipment on daily basis. National Highway Authority, PAKISTAN Jan 2004 – Dec 2004 Trainee Engineer: (ROADS / HIGHWAYS) Accomplished the training in the following fields of road works; Survey Material testing Site supervision of; a) b) c) d) e) Earthworks Pavement layers i.e. Asphalt works Construction of culverts and bridges. Reinforced earthworks. Drainage and erosion works. DRIVING LICENSE: Valid Omani driving license. VISA STATUS: Omani resident Visa ACTIVITIES: Member of Pakistan Engineering Council. REFERENCE: Available on request. Page 4 of 4