global review 2016 extraordinary possibilities CONTENTS DRA’s Complete Offering 3 Who Are We 4 We Believe In DRA 5 Our History 6 What We Do 9 Where We Operate 16 Commodity Expertise 19 Projects24 Contact Us 32 1 DRA’S COMPLETE OFFERING 1 WHO WE ARE WE BELIEVE IN DRA DRA is a multi-disciplinary engineering group that delivers mining, minerals processing and infrastructure services from concept to commissioning, as well as comprehensive operations and maintenance services. Over the last 30 years we have strengthened our presence within the Mining and Minerals industry and believe our unique project offering is unrivalled in this sector. Engineering is our passion, our vision travels across borders and sectors growing our global capabilities and enhancing our client service offering. From humble beginnings in 1984, with the inception of our first minerals processing plant in South Africa, DRA soon expanded its footprint to include projects across Africa, and the rest of the world. We have defined ourselves as experts in engineering and we continue to redefine the essence of the discipline to meet the challenges of the global economy in the 21st century. As industry leaders we cover a wide range of commodities including gold, platinum, coal, ferrous metals, diamonds, uranium, base metals, potash and rare earths. We bring to projects the deep market knowledge and insights of over 3,000 people in 20 offices worldwide. Our collaborative community is diverse in culture and disciplines and includes engineers, project managers, draughts people, operators and support staff. Many of our people are recognised as leaders in their fields and as such, we are able to navigate complexities across commodities and borders. Clients continue to choose DRA due our ability to deliver world-class service to world-class companies across the globe; we provide a comprehensive list of engineering services required to advance a mineral project from concept to commissioning. We share an uncompromising commitment to excellence, which explains why our contract operations division operates and maintains numerous minerals processing plants, around the world, on behalf of our clients. We are the distinction; through our expertise we undertake the design and construction management of surface and underground mining projects, in both hard and soft rock design and confidently offer design and implementation services of associated infrastructure projects, such as ports, roads, bridges and housing development. trust 4 Our client service principles grow partnerships beyond connections to lasting relationships. We not only meet expectations, on time and on budget, we exceed them! In 2015, our enviable reputation within the market enabled us to confidently declare DRA as the engineering group that creates extraordinary possibilities. This is our legacy, one we are proud to share with the world. Where projects face seemingly insurmountable challenges DRA finds solutions. DRA is present in 20 locations worldwide, our collaborative efforts enable us to think globally but implement locally, merging highly skilled minds to deliver bespoke solutions to a specific market. In 2016, we will intensify our efforts to diversify and further commit our resources to develop broad solutions to specific challenges faced by the global community. Our key infrastructure focus areas include energy, water, transportation and social infrastructure solutions. Our clients range from local communities to government, private developers, mining companies as well as oil and gas suppliers. The core of our corporate mission and values is people our greatest asset. Our culture of safety is intrinsic to the company and has resulted in a Lost Time Injury Frequency Rate (“LTIFR”) of 0.099 in 2015, well below the industry standard. We believe that safety is a prerequisite to any function on our projects. Our safety culture enables us to adapt to challenging circumstances to deliver our clients’ projects safely. As we lay the foundation for future development, we leverage our talent, geographic reach and resources to make a positive and lasting impact on many of today’s social and economic challenges. By diversifying in expertise and location, we combine our skills to look beyond tomorrow and remain united in our quest to discover new potential. In line with our corporate vision, DRA will strive to advance sustainable solutions in energy, food and infrastructure through collaboration: • DRA was appointed Lead Study Manager for the Triton Minerals’ Nicanda Hill project in Mozambique. Not only will we enhance Triton Minerals’ graphite knowledge, it is our belief that graphite holds the key to energy storage which is vital in the development of the renewable energy sector. • Further expanding our focus is the exploration of potash and phosphate, two key commodities for food security. Earlier this year, we were awarded our first phosphate project, followed by the completion of a definitive feasibility study of the project. The project, due for commissioning in August 2016, is designed to produce approximately 1.35 Mtpa of phosphate concentrate. • We will aggressively pursue the development of our infrastructure services and capabilities worldwide, by expanding on similar work undertaken in the mining sector. Paul Thomson – CEO, DRA Group 5 OUR HISTORY From relatively humble roots in South Africa founded by engineers with an entrepreneurial spirit in 1984, we have subsequently built expertise and capacity in the rest of Africa. This has enabled us to present our total mineral and mining engineering solutions services to the rest of the world. 1997 1995 1984 1989 1990 DRA’s first gold project at Weltevreden. DRA’s first East African Project Williamson Diamond Mine in Tanzania. 1993 DRA’s first project in Canada, a Dowding Reynard & Associates is established by Brian Dowding and Tony Reynard. diamond plant at First of the Lonmin platinum projects. Yellowknife. 2014 2013 2010 DRA 30 years old. Paul Thomson succeeds Leon Phola Coal and DMO DRA Acquires Uys as CEO of the DRA Group. specialist engineering ARDBEL is established for company, large-scale materials handling Taggart Global. projects. WAH Engineering Consultants is acquired to add shaft structural design capability. 2012 Brian Bruce is DRA deliveries Liberia’s first commercial gold mine for Aureus Mining 6 2002 DRA’s Winder systems DRA completes Platinum Project 2001 projects in one year, establishes DRA as DRA builds the simultaneously. is established. Kroonendal a leader in platinum world’s largest concentrators. floating diamond six platinum two of them plant on a modified DRA’s first project marine vessel. in Australia, Merlin Diamonds. 2004 1998 DRA’s first venture 1996 Minopex wins the into mining - Letseng Diamond a decline shaft for Mine operation. DRA Kroonendal Platinum. Mining is awarded Minopex is established. DRA’s first large coal project at Twistdraai (JV with Fluor). Marula off-reef conversion project. 2009 2006 DRA acquires Holly & establish DRA in the Associates. mega-coal projects DRA is awarded arena. DRA Mining its first major Leon Uys succeeds acquires LQS. infrastructure project. Brian Dowding as CEO. DRA Americas is established. DRA is awarded its first project in China for a coal producer in Xinwen. BKM Project established DRA in iron ore. Modular diamond plants completed for De Beers’, Snap Lake and Victor projects in Canada. Vhumbanai Projects established. 2005 appointed as chairman of the DRA Group. The DRA SA Group Employee 2015 1999 Broad-Based Trust is established. 2007 As the business environment has changed we have evolved from a company that only engineered processing plants, to one that provides customised mine and infrastructure engineering, as well as complete operations and maintenance solutions for clients. Our passion for excellence in engineering carried us through the downturn in the industry and sustained our growth from Africa into the rest of the world. experience 7 WHAT WE DO DRA offers a full range of engineering and project services. Our services are tailored to meet the needs of our clients, delivering both comprehensive and customised project solutions. “I truly believe that engineering is fun, building things is fun. Whether it’s a toy steam engine, a Meccano bridge, a new substation, a 6 MW winder or a 600,000 tpm platinum concentrator, there’s something in building things that appeals to many kids and those kids What we deliver: • Conceptual design and feasibility studies (including stock exchange compliant studies) • Detailed design and engineering • Mine Winder systems engineering and design and shaft headgear design • Mine design and scheduling • Customised design of processing plants • Electrical control and instrumentation • Infrastructure design and engineering plant, mining and Bulk utilities • Project and construction management • Commissioning and production ramp-up • Contract operations of mineral processing plants DRA’s contract operations provide feedback to the design engineers regarding efficiency optimisation as well as possible areas of improvement. This detailed review of procedures specifically highlights operability, maintainability and constructability. As a group we provide a variety of services, allowing us to meet the needs of multinational mining companies as well as medium-sized and emerging producers. often grow up to become engineers.” MINERALS PROCESSING MINOPEX OPERATIONS INFRASTRUCTURE WINDERS engineer 8 STUDIES EXTERTISE MINING OPERATIONS Brian Dowding, Founder IMPLEMENTATION Expertise: 9 WINDER SYSTEMS MATERIALS HANDLING In 1999 DRA developed a unique capability in the design of winder systems and ever since, our electrical and mechanical Winder Engineers develop the design framework and establish the operating specifications. We work alongside industry specialists to construct new winders, refurbish existing winders and manage winder/shaft installations on behalf of the client. Winders which have been suitably refurbished and modernized can significantly reduce capital outlay and delivery time by as much as 50%. As an extension of our service, we also source new and used winders required for the development of new shafts or to upgrade existing infrastructures. All clients benefit from the technical training we provide to their maintenance personnel which not only upskills employees but also reduces reliance on outsourced winder maintenance services. DRA provides well-designed, custom-engineered materials handling systems that increase throughput, boost productivity and reduce plant operating costs. From frozen Arctic conditions to hot and dusty arid environments, we have designed and built conveyor systems in a variety of climates and delivered to client expectations regardless of the circumstance. Our vast experience includes design and construction of belt feeders, bins, silos, stockpiles, stackers/ reclaimers and bulk transfer systems. Our comprehensive service offering incorporates unabridged design, project management and procurement layout services, shaft steelwork, conveyancing and loading arrangements. As a dynamic organisation, DRA is able to offer this integrated solution and tailor services to meet specific customer requirements. Over the past three decades, DRA has expertly designed and installed more than 300 km of conveyors with some overland conveyors stretching to 10 km in length and boasting 5500tph capacity. As an industry leader, DRA brings the latest in innovation to its clients and offers technologically advanced Discrete Element Modelling design and simulations on all chutes and transfer points. In order to calibrate our models specific material flow test work is undertaken; we are confident of our solutions and our customers are confident of our commitment to their success. customised 10 ELECTRICAL, CONTROL AND INSTRUMENTATION SERVICES IIncluding high, medium, low-voltage and light current electrical designs, surface and underground reticulation, as well as power supply systems for remote mines, our electrical, control and instrumentation services afford both customisation and variety. Our systems are designed by in-house specialists who develop all instrumentation and control software. This process ensures maximum efficiency and minimal room for error. We design, procure, programme and commission complex systems for mining and broad industrial applications. STUDIES Planning brings the future into the present and each step taken brings a goal closer to fruition. Almost all of the studies that DRA has undertaken have resulted in the successful implementation of projects, these projects were undertaken for both local and global clients and often, due to our efficient service delivery, resulted in DRA providing ongoing operational support and guidance. Our comprehensive study service includes; conceptual, pre-feasibility and bankable feasibility studies, for the full range of commodities and all consistent with the appropriate international stock exchange compliance codes and standards. 11 HEADGEAR AND SHAFTS With the acquisition of Walker Ahier Holtzhausen (WAH) in 2013 DRA added numerous highlyspecialised capabilities to its service offering and ever since, we have supplied the best in mine headgear and shafts to our clients. Conceptualised and designed following decades of experience in South Africa’s deep underground mines, DRA continues to extend the value PROJECT IMPLEMENTATION DRA’s ability to successfully implement projects across Africa and throughout the world has earned the organisation its enviable reputation. This success is owed largely to our smart, ‘fit for purpose’ engineering and design which is complemented with strong project management skills and knowledge. Our value added services provide flexible and project specific implementation plans and contracting models tailored to meet the unique project requirements of clients to clients. Our contract models are typically based on EPCM, EPC or hybrid solutions. DRA’s client service principles not only integrate our people across the globe but also integrate our people and our clients. Our firmly established relationships with global industry suppliers and contractors afford us reliability and quality and ensure the consistent delivery of cost effective solutions to our clients. Our project models have proven to be very successful, delivering challenging projects within stringent and varied constraints such as time, cost, quality, risk, safety and client satisfaction. 12 OPERATIONS As the leading contract operator of mineral processing facilities in Africa, we specialise in the commissioning, operation and maintenance of mineral processing plants. Our expertise extends to both greenfield and brownfield operations, we are able to provide the most time efficient and cost effective solutions. With our unrivalled experience in facility improvements it is clear why customers have, and continue to choose DRA as the firm of choice. Our collective knowledge is a culmination of experience and knowledge; it is the collective expertise of our process engineers, specialist maintenance, asset management, training and safety management teams across various commodities. Additional operational services include a full suite of laboratory services, as well as the operation and maintenance of tailings deposition facilities and water treatment plants. Over the past three decades, DRA has mastered its capabilities to operate plants across the globe in temperatures ranging from -50 ˚C to +50 ˚C. The extensive experience of our people ensures that our client needs are met timeously, regardless of how these needs may evolve in scope of work and project duration. We are experts in what we do and our knowledge ensures that we deliver exceptional service, at a competitive rate while reducing risk and improving productivity. OUR FULL SERVICE OFFERING DRA has specialist capabilities in the design of mineral processing plants for a wide range of commodities. Our process expertise in comminution, flotation, gravity concentration and hydrometallurgy is highly regarded throughout the industry and attests to our integrated approach to mine design. Our vast experience in mine design ranges from the exploitation of deep-level gold deposits on the Witwatersrand of South Africa, to the ore bodies situated in northern Canada and Russia. The DRA mine design and engineering team is an integration of expertise from our mining, mechanical, electrical, control, instrumentation and winder specialisations. Our comprehensive service offering includes engineering, procurement and construction management (EPCM) as well as lump-sum turnkey (LSTK) solutions. The team’s engineering design work is supported by in-house drawing offices located in Johannesburg, India and Canada. Our highly advanced software ensures that the team produces the highest quality 2D and 3D designs. The above capabilities are complimented by our proficiency in design and construction management, specific to mining-related infrastructure for both surface and underground operations. Our scope of work within this specialisation is varied; we deliver standalone infrastructure such as bridges, roads, dams, schools, hospitals and offices as well as larger and more complex projects such as township development, complete ports and airports, railway lines and hydropower plants. full service 13 WHERE WE OPERATE We started as five engineers in 1984 and have since grown to a global organisation with a diverse service offering in 20 locations worldwide. While our roots originated in South African soil, we have crossed borders and oceans to service the needs of our global customers. It began at our offices in Sunninghill, Johannesburg and, to this day, these same offices form the heartbeat of the organisations global operations. We have grown exponentially throughout the continent and today, we are present in 13 locations throughout Africa. level of service to our customers in the Americas. The Brisbane, Perth and Beijing operations enable us to extend our total service offering to clients throughout the Pacific Rim. DRA has also established offices in Kazakhstan and India which continue to grow. While we have traversed borders and continue to grow our global presence, our professionals, based in Johannesburg, not only share insights and best practices across borders and projects but also assist with the execution of large projects globally, making DRA a cost effective solution for international clients. With our offices in Pittsburgh (USA) and Toronto (Canada) we are able to provide the same superior africa AMERICAS india PACIFIC Our extensive experience throughout Africa has earned us our exceptional reputation within the market and our unmatched standard of project delivery has secured us as the firm of choice across the continent. We are not only able to complete projects according to customer specifications, we also significantly reduce the risk associated to projects we undertake. DRA is fortunate to serve both local and international tenement holders in Africa. DRA has proven capability in project execution across regions and in extreme environmental conditions. Undertaking projects in remote, largely inaccessible locations of the world, requires specialised logistical planning, as well as expert design and project execution skills but this is exactly how DRA creates extraordinary possibilities. Our drawing office in India produces cost effective design work for our clients on any project, throughout the globe. We also provide process engineering plant technology and general engineering services to the Indian mining industry. For over a decade, DRA has successfully operated in Australasia. Our Mandarin office in Beijing, supports global procurement and our offices in Perth and Brisbane support the local mining industry as well as clients with African tenements. Snap Lake Diamonds Fe Labrador Iron Mines Groundhog Coal Black Otter Coal Almarty Kazakhstan Toronto Canada Beijing China Pittsburgh USA Au Au Muscat Oman Edikan Gold Liberia Ghana Kibali Gold OBOTAN Gold KINSENDA Copper Tati nickel Ni KAROWE DIAMOND Tanzania KonKola North Copper Zambia Namibia Zimbabwe Botswana Mozambique JHB South Africa PACIFIC india Cu DRC africa Vallabh Vidyanagar India Au Au NEW LIBERTY Gold AMERICAS tongxin Coal Cu coobina chromite Cr tweefontein Coal Perth Australia Brisbane Australia Pt Booysendal Platinum 14 15 COMMODITY EXPERTISE “As the organisation further expands its global footprint and continues to diversify its expertise in commodities, we are able to address nuances of local markets and deliver world-class services to our clients across a broad spectrum of projects.” Johann de Bruin, Managing Director DRA Projects GOLD DRA has a long association with the gold mining industry. As a result, we are able to meet the design requirements of gold mines and gold plants, for any application. Our success is owed to our team of leading gold processing engineers and their ability to supply gold plants to Africa and the rest of the world. Now comprising the collective knowledge of more than 60 process engineers, and their relative design and plant operation expertise, our process department adds significant value to our clients’ gold projects. Our gold specialists are experts in the testing of refractory ores and specifically in gold processing through cyanide destruction resulting in the delivery of optimal and cost-efficient process designs, for even the most challenging projects. Due to the relationships we have established with equipment suppliers and commercial laboratories, worldwide, DRA’s cutting-edge technology enables us to deliver the best in gold processing plants and mine designs. FERROUS METALS Our ferrous metals processing capabilities include iron ore, chromite, manganese and vanadium projects using crushing, screening and milling, washing and scrubbing, gravity concentration, magnetic separation, flotation, pressure leach and dry separation processes. We have designed and built numerous processing plants and projects within this sector. DRA has designed and constructed processing plants for ferrous metal operations in Australia, Canada and Kazakhstan with Khumani Iron Ore being our flagship project in South Africa. Our partnership with the mine dates back to 2006 and ever since DRA has provided mining-related infrastructure development for the entire operation, including the load-out system and tailings handling facility. We have most recently upgraded the hematite iron ore through a process of crushing, screening, jigging and WHIMS (Wet High Intensity Magnetic Separation). Clients have become accustomed to our high levels of customer service and often request our plant operations team to train in-house operators, in the commissioning and running of gold plants. safety 16 Paul Thomson – CEO, DRA Group 17 PLATINUM DRA is the world leader in the development of platinum concentrator projects and we are renowned for our service offering and delivery. Within this unique field of mineral processing we undertake the necessary testwork, design concentrators for specific ore bodies, implement plant modifications, to increase recovery and throughput, and offer both plant design and construction. Characterised by the in-house comminution design, our platinum processing plants offer an advanced level of process control and automation. Our engineers prioritise efficiency and as such, our solutions offer the most cost-effective plants in the industry. We have also distinguished ourselves in preconcentration technology; by pioneering the use of dense medium separation in PGM concentrators in the processing of UG2 ore, with a high chromite content, we set ourselves apart from others in the industry. Our expert knowledge is a culmination of 10 years’ experience gained through the design and construction of over 40 concentrators in the Southern region of Africa. Having been instrumental in 80 percent of platinum plants in South Africa and Zimbabwe, in the past 20 years, with a combined throughput of approximately 40 Mtpa, attests to our superior solutions and insight 18 BASE METALS DIAMONDS DRA provides the base metals sector with stateof-the-art technical solutions and is known in the industry as the expert in concentrator plant design. We offer practical solutions in processing strategies, including comminution circuit design, flotation, leaching, solvent extraction and electrowinning. We understand feasibility and apply this to our design of orebody-specific processing plants. We acknowledge the importance of flexibility in the implementation of plant modifications to boost recovery and throughput. We know that innovation must move beyond current and we drive this by pioneering the use of dense medium separation (DMS) technology in the pre-concentration of base-metal ores. DRA is a leading contractor in the design, construction and commissioning of diamond recovery and dense medium separation (DMS) plants. The vast experience of our team of engineers, the application of our extensive technical knowledge and the use of the best in technological innovation, ensure that our clients receive engineered processing plants beyond compare. Our services are as varietal as our experience; testwork programme management, conceptual and final process-option selection and engineering development, complete processing plant and infrastructure engineering design and implementation management, electrical and control systems design, and the design and construction of mining infrastructure. One of the many notable applications of our expertise was the successful design of the Nkomati Nickel plant’s Phase 2 expansion project. The expansion was necessary for the mine to process two minerals, nickel and chrome, through one plant. Following the upgrade, plant production has increased from 100,000 tonnes per month (tpm) to 250,000 tpm. Our clients vary in operation size and geographic location, we are proud to have supplied diamond processing plants to the largest diamond producers on five continents. These unit processes include liberation by primary, secondary and tertiary crushing using jaw, gyratory, cone, high pressure grinding rolls (HPGRs), scrubbing and milling. Waste sorting in pre-concentration is also becoming increasingly prevalent. Final diamond recovery is achieved through any combination of wet or dry magnetic separation, X-ray sorting and the use of greasebelts. DRA recently acted as the engineering, procurement and construction management (EPCM) contractor on the Karowe Mine Diamond Project for Boteti Mining in Botswana. The Karowe processing plant is the first in Southern Africa to use autogenous milling as a primary liberation technique. COAL DRA are experts in the design of coal processing plants. Over the last 30 years, DRA has expertly designed processing plants producing approximately 50% of washed coal in South Africa. Our involvement in over 350 coal processing projects globally, complete with materials handling facilities, confirms our ability to deliver only the best. Our enviable credentials in this commodity extend beyond Africa and into China, USA, Australia, India, Russia, Trinidad and Indonesia. DRA provides the full spectrum of coal processing services – from feasibility studies and plant design, through to project implementation and processing plant commission. We are regarded as world leaders in the delivery of turnkey solutions, particularly in coal washing plants. We are able to deliver varied- and multiple-stage washing plants, including gravity or pump-fed DMS plants, drum plants, spiral plants, flotation plants and jig separation plants. The award of the Merlin Project in Australia by Ashton Mining confirms our status as costcompetitive, world-class designers of diamond plants. This accolade was further supported by DRA’s subsequent award of the Namibian sub-sea diamond recovery contract for the construction of the world’s largest sea-borne DMS. comprehensive 19 RARE EARTHS URANIUM From upfront beneficiation and concentration, through to the production of either rare earth oxides or chlorides, or purified rare earths, DRA has thorough knowledge in the development of rare earth hydrometallurgical projects in Africa. Another of our specialist areas of expertise is the uranium sector and although we are able to offer a comprehensive solution, we continue to improve on our offering. DRA has successfully completed uranium scoping or preliminary economic assessment (PEA), pre-feasibility and feasibility studies (NI 43-101 and JORC compliant) for Mantra Resources, Uranium One, Rockgate Resources and Peninsula Energy, as well as a 2.3 million tonnes per month tailings retreatment study for Goldfields. Rare earth beneficiation and concentration capabilities include crushing, radiometric or X-ray fluorescence (XRF) sorting, dense media separation, gravity separation, milling, low intensity magnetic separators (LIMS), wet high intensity magnetic separators (WHIMS) and flotation. Extending beyond conventional hydrometallurgical processing, our experience also includes more complex rare earth extraction technologies such as caustic and sulphuric acid cracking, whole ore hydrochloric leaching, recovery of reagents, complex solid or liquid separation, thermal decomposition, selective precipitation and redissolution, double salt formation, solvent extraction, ion exchange, acid retardation, nanofiltration and flowsheet simulation. These studies explored a variety of production rates and processing methods, including acid heap leach, acid and alkali agitated leaching, resin-inpulp (RIP), ion exchange (NIMCIX, Fixed Bed IX and others), counter-current decantation (CCD), solvent extraction (SX), nanofiltration, energy recovery systems and various back-end precipitation circuits (ADU, SDU and Peroxide). We are fortunate to have comprehensive heap leach experience which includes both static and dynamic heap leaching with uranium recovery via IX and SX. Our process engineers have managed and supervised uranium test work campaigns in South Africa, Australia and Canada, offering customers their expert insight into the design, execution and commissioning of uranium projects that process ores from deposits in South Africa (ADU precipitate) and Namibia (SDU precipitate). Our close and established relationships with key contractors, suppliers and consultants in the global uranium industry facilitate our production of comprehensive trade-off studies on processing options. During project development, from the conceptual phase through to construction and commissioning, we focus on economic value-add and risk mitigation. commodities 20 21 extraordinary possibilities PROJECTS Booysendal Platinum Mine, South Africa. BOOYSENDAL PLATINUM “We taylor our services to meet the needs of our clients, offering both total solutions as well as customised project solutions. Our ability to draw on our engineering and support staff in Johannesburg to assist with the execution of large projects, makes us cost-effective.” Paul Howard – Global Business Development 22 DRA was appointed as the mining and mineral processing EPCM (engineering, procurement and construction management) contractor for the Booysendal Platinum Project for Northam Platinum. We successfully completed the detailed design and construction management of the complete mining complex, including two declines, a 187.5 ktpm platinum group metals (PGM) concentrator and all supporting infrastructure. The typography of the project and the environmentally sensitive surroundings of the Dwars River Valley presented various challenges to the project team. Our three decades knowledge afford us the confidence to navigate even the most difficult territories and make informed decisions; DRA’s effective management of multiple elements of the project, significantly contributed to its success. 23 Karowe Diamond Mine, Botswana. Lubambe Copper Mine, Zambia. LUBAMBE COPPER As the EPCM contractor for the Lubambe Copper Project at the Lubambe Mine in Zambia, DRA was involved in the conversion of a shaft, mothballed for 50 years, to support an operating mine. By replacing the existing steelwork, refurbishing the shaft’s two winders and designing and managing the construction of a new winder, we were able to meet client expectations. In addition, DRA engineers also designed a Karowe DIAMOND new decline and designed and managed the construction of a materials-handling system, a tailings dam and related infrastructure. Finally, the beneficiation plant was designed and built, including a sophisticated milling and flotation system. The entire project was completed two weeks ahead of schedule with the Lubambe concentrator producing its first concentrate on 20 September 2012. After a successful commissioning in 2012, Boteti approached DRA to complete the Phase 2 upgrade of the Karowe process plant in 2014. DRA again utilised Kinsenda COPPER innovative engineering design to integrate specialised X-Ray technology into a new diamond recovery circuit that will identify and recover carbon-specific diamondiferous material. This unique XRT technology will enhance Boteti’s ability to recover larger diamonds, prior to the DMS, whilst mitigating the risk of downstream damage. Within the first year of the plant upgrades, this innovative process plant design has assisted in the recovery of a 1,111 carat gem quality diamond, the second largest diamond recovered in history. KIBALI GOLD In 2015 DRA completed construction of one of the world’s highest grade copper deposits, Metorex’s Kinsenda copper project in the Katanga Province of the Democratic Republic of Congo. DRA was appointed to refurbish the current shafts and erect a process plant, onsite, to improve process efficiencies of mining copper resources in the DRC. mandate included, multidisciplinary engineering design, procurement of equipment and building materials, logistical delivery to site and the construction management of contractors actively assisting with the project implementation. DRA designed the plant to process the 700 kt resource extending to both sulphide and oxide copper ore. The project scope includes the construction of a new 600 ktpa processing plant, a decline development, a new winder as well as surface and underground mine infrastructure for the re-opening of the existing mine. By using local labour and applying our contract management skills to oversee over 950 people on site, the processing plant was commissioned in early in 2015. DRA ensured short term deliverables were met on time and within budget and disclosed impeccable safety records for the duration of the project. As the EPCM contractor, DRA implemented our pit to port service on yet another project in Africa. Our Commissioned in Q2 2015 DRA brought various unique elements to this diamond plant designed constructed for Boteti Mining. Located in Botswana, DRA began work on Phase 1 of this greenfields 2.5 Mtpa process plant project in 2010, and incorporated autogenous (or AG) milling technology into the innovative design, a first in the Southern African diamond processing region. Kibali Gold is one of the largest gold plants on the continent of Africa. DRA delivered the design, procurement and project management of the metallurgical plant, infrastructure, a 45 MW backup power system, tailings system for a 6.1 Mt lined concentrate tailings dam and 7.6 Mt float tailings dam. Although DRA was awarded the process plant EPCM contract, two-thirds of the project was infrastructure-related. The first phase of the project also included the 22MW Nzoro hydropower plant. (DRA is currently managing construction of the second 12 MW hydropower plant – Ambarau). During the peak construction phase of Kibali, DRA was responsible for more than 4500 contractor personnel on site, achieving 9.8 million consecutive injury free hours. Kibali Gold Mine, DRC. Kinsenda Copper Mine, DRC. 24 innovation 25 New Liberty Gold Mine, Liberia. Tweefontein Coal Mine, South Africa. TWEEFONTEIN COAL The Tweefontein Optimisation Project is, to date, one of DRA’s largest EPC (engineering, procurement and construction) contracts. The project involved the replacement of three existing coal preparation plants, at Glencore Xstrata’s Boschman site, which collectively yielded a 9Mtpa output from a single plant. The coal preparation plant (CPP) has been designed for a raw coal feed capacity of 12.5 Mtpa and features two 1,000 tph modules, a two-stage, primary and secondary dense medium cyclone facility, for coarse coal, and a spiralbased unit for fine coal processing. Both primary export and secondary, local, product is produced. Construction New Liberty GOLD began in August 2012 and is currently on schedule for its completion date in the first quarter of 2015. DRA;s scope Further extends to include all infrastructure associated with the 18 MVA power-consuming CPP, starting from the ROM tip all the way through to the rail load-out facility. During this projects DRA has made use of virtual construction simulation software in order to ensure the designed connections cater for simplified assembly of workshop or ground assembled sections. This integrated software allowed DRA to greatly mitigate risks, improve safety and optimise constructability TATI NICKEL Appointed as EPCM contractor to maximise profitability at Tati Nickel’s Phoenix Mine in Botswana, DRA designed and built the first ever dense medium separation (DMS) pre-concentration plant for nickel. Our innovative application of DMS technology produced a significant increase in the viable mineral reserve and simultaneously reduced the overall production cost. DRA is extending our African gold track record through the EPCM contract of the New Liberty gold project for Aureus Mining. New Liberty is located within the BeaMDA property, in Grand Cape Mount County in the northwestern portion of the Republic of Liberia, approximately 100km north-west of the capital, Monrovia. New Liberty, is currently the only gold mine under construction in West Africa with first gold pour targeted for Q2 2015. The project objective is to provide a gold processing facility that will be capable of handling a nominal tonnage of 90 000 tpm throughput of ore. The process consists of a two-stage crushing circuit and a primary mill with regrinding using VERTIMILL® technology. Gold is leached in the carbon-in-leach circuit and gravity gold is leached with an intensive leach reactor. DRA has been involved at the New Liberty project since its inception in May 2011, and will be on site until commissioning in 2015. This will be yet another project where DRA are responsible for various service offerings from total mine infrastructure development, processing plant to the diversion of the Marvoe Creek away from the open cast pit, and the tailings storage facility. Despite some of the extreme challenges of implementing a project in Liberia DRA has managed to mitigate all risks and is on target to handover the plant to Aureus Mining for full production Early in Q3 2015. BLACK OTTER COAL DRA provided turnkey design, engineering, procurement, erection and startup for Signal Peak Energy’s bituminous coal handling and washing facility in Montana, USA. Signal Peak Energy’s Black Otter Mine employs longwall mining to produce 7,000 tph of run-of-mine (ROM) coal, which is conveyed to a stacking tube for ground storage. Reclaimed at 3,500 tph, the ROM coal is conveyed to a screening and crushing building for reduction to 2” top size and is then transported to a raw coal stockpile. Flexibility has been provided to direct the reclaimed raw coal to the preparation plant or, directly to the clean coal storage area, depending on quality. Black Otter Coal Mine, USA. 26 technology 27 Tati Nickle Mine, Botswana. Kumani Iron Ore Mine, South Africa. Black Rock Manganese Mine, South Africa BLACK ROCK MANGANESE Since 2010 DRA has been the EPCM contractor responsible for upgrading the Black Rock Manganese project. The purpose of the upgrade is to increase processing capacity from 3.2 Mtpa, to 4.6 Mtpa. In addition, the client, Assmang, requested the improvement of efficiencies to ultimately result in the reduced operating costs. DRA is currently responsible for the design, supply, installation and commissioning of new crushing, screening and materials handling facilities at the existing Nchwaning Mine. We have successfully undertaken studies on alternative approaches to expand the capacity of the Black Rock Mine Operations of Assmang since late 2010 and the upgrade is currently being executed In addition to our current work at Black Rock, we have over several years carried out the studies and execution projects for Assmang’s major iron ore project, Khumani, also located in the Northern Cape. These projects and others firmly place DRA on the world stage of expertise and project delivery capability in manganese and iron ore. TONGXIN COAL DRA commissioned a 1 900 Mtph coal preparation plant at the Tongxin Mine in Datong, Shanxi Province in the People’s Republic of China for the Datong Coal Mining Group, during 2009. With an annual processing capacity of 10 million tonnes of raw coal, the plant was designed to produce both high and low quality steam coal along with a commercial kaolinite product. The scope of supply included the entire production facility and all ancillary systems, from the run-of-mine coal conveyor, through to the railcar loading station. Construction of the Tongxin Plant began in May 2008 with plant commissioning in September 2009. KUMANI IRON ORE Tongxin Coal Mine, China. In 2004, DRA was contracted by Assmang to manage and design their greenfields Khumani Iron Ore Project near Kathu, South Africa. The project was delivered ahead of time and under budget and resulted in a brownfields expansion. Kumani Iron Ore is DRA’s cornerstone project, boasting a total production capacity of 16 Mtpa, with 22 Mtpa ROM processing capability. Initially appointed as the study manager, DRA was subsequently appointed as the main engineering, procurement and construction management (EPCM) contractor for detail design and engineering. Our specialised project team was tasked as the lead contractor for end-to-end project management and integration of the crushing facility, processing plant, stockyards and infrastructure, which included power, water, roads, rail 27 sidings and on- and off-site accommodation during the construction phase. In addition, DRA was commissioned to design and integrate mine and plant control systems using a comprehensive management information system (MIS), which accurately monitors production by way of realtime data. Site clearing started in mid-2008, with the first product stockpiled in the 12 months that followed. Due to this highly successful implementation, DRA was contracted to manage various other phases of the project, including the EPCM contract for a super fines beneficiation plant at Khumani in 2011. This plant uses WHIMS technology to process -1 mm super fines for the extraction of saleable product. performance 28 Phola Coal Mine, South Africa. Nkomati Nickel Mine, South Africa Nkomati Nickel Phola Coal At the Nkomati Nickel Mine in Mpumulanga Province in South Africa, DRA was contracted to design the plant’s Phase 2 expansion project to enable the mine to process nickel as well as chrome through a spirals plant. The upgrade increased plant production from 100 000 tonnes per month (tpm) to 250 000 tpm. As part of the project, DRA upgraded the tailings thickener and designed and built a spiral processing plant to treat the chrome ore. This spiral plant is a high-end system that shares infrastructure with the MMZ plant. We added a new conveyor system and a new stockpile that is 90 m long, 11 m wide and 35 m high. The mine’s older plant had been designed to process ore from the Main Mineralised Zone (MMZ) but it was proven more profitable to mine Peridotic Chromitite Mineralised Zone (PCMZ) ore at the time. The Phase 2 plant was therefore designed to process PCMZ ore, which is lower grade nickel ore with a high chrome content. One of the challenges that DRA met was the timely upgrading of the plant equipment – we completed this preparation work according to schedule over a 14-week shutdown period. Pilanesberg Platinum Following the completion of a bankable feasibility study in March 2007, Boynton Investments contracted DRA to build a new US$170 million concentrator for the Pilanesberg Platinum Mines Project located on the Western Limb of the Bushveld Igneous Complex adjacent to the Pilanesberg Dome. The operations of one open pit mine fed around 365 000 tpm of < 300 mm run of mine ore into the concentrator. The plant treats two types of ore: UG2 at 65 000 tpm gets processed in the UG2 concentrator section; the Merensky (300 000 tpm), which itself consists of two types, contact reef and pothole reef, goes to the Merensky concentrator section. BHP Billiton Energy Coal South Africa (BECSA) called for the design and construction of a 16 Mtpa coal processing plant. DRA was awarded the US$100 million Phola Coal project in 2007, the largest coal washing facility in South Africa. This followed our successful study of the engineering design, procurement, project management, construction management and commissioning of the project. The plant consists of two 8 Mtpa DMS, fine coal spirals modules, and probably the largest coal slime filter press filtration section in the world, in order to meet the stringent environmental standards. It serves both BHP Billiton’s Klipspruit colliery and Anglo Coal’s colliery at Zondagsfontein. During construction, the Ogies area experienced some of its heaviest rainfall for two years in a row, the first coinciding with the peak of civil construction and the second with the structural steel erection. However DRA’s project management ensured that the plant was completed on schedule in June 2009. Obotan Gold During the first half of 2009 commissioning of the Pilanesberg Platinum Concentrators were completed. Three million LTIF hours were reached from inception to April 2009, with site personnel peaking at 1 950 at the beginning of the year. DRA was responsible for the process, civil, structural, mechanical, electrical and instrumentation design, construction and commissioning of the entire concentrator complex from the ROM receiving bins through to the tailings dam. DRA was awarded the EPCM contract for the 3 Mtpa gold processing plant located 36 km west of Obuasi in the Amansie West District, Ashanti Region of Ghana. This is DRA’s second gold plant in Ghana and third in West Africa over the past 4 years. The project was confronted with extremely high rainfall during the construction period. Nonetheless, we are on schedule to pour gold in Q1 2016. DRA managed 2 400 employees and contractors on site. Once commissioned the process plant will produce 190 000 oz of gold per annum. DRA also implemented all associated mine infrastructure. Pilansberg Platinum Mine, South Africa Obatan Gold Mine, Ghana. 29 processing 30 extraordinary possibilities CONTACTS DRA PPROJECTS (PTY) LTD Tel: +27 11 202 8600 (Johannesburg) E-mail: info@DRAglobal.com DRA PACIFIC (PTY) LTD Tel: +61 732 364 157 (Brisbane) Tel: +61 8 9324 3833 (Perth) E-mail: info@DRAglobal.com DRA GLOBAL (PTY) LTD) Tel: +1 724 754 9800 (USA) Tel: +1 416 800 8797 (Canada) E-mail: info@DRAglobal.com 31 32 GLOBAL REVIEW DRA Group Holdings (PTY) LTD DRA GR Q1 V1