Prüfungsnummer: adwords- fundamentals

advertisement
Exam Number/Code: C_TSCM42_64
Exam Name: SAP Certified Application
Associate - Production Planning & Manufacturing with
SAP ERP 6.0 EHP4
Version :
Demo
http://cert24.com/
QUESTION NO: 1
In production order processing, for which of the following objects can you enter a
confirmation? (Choose three.)
A. Work Center
B. Individual Capacity
C. Order
D. Operation / Suboperation
E. Trigger Point
Answer: B,C,D
QUESTION NO: 2
Which one of the following scheduling types cannot be assigned as default to an order
type (production order)?
A. Midpoint
B. Forward
C. Only capacity requirements
D. Backward
Answer: A
QUESTION NO:3
In your enterprise, a planning strategy is used in SAP ECC that enables joint planning of
all MRP scheduled assemblies for a finished product to trigger procurement of these
assemblies. It is important to ensure that the finished product is only produced when there
is a customer order present. When a customer order is received, production of the
finished product should be triggered in the form of make-to-order planning and production.
Which planning strategy covers this scenario?
A. Planning with make-to-stock (strategy 10)
B. Planning at the assembly level (strategy 70)
C. Planning with final assembly (strategy 40)
D. Planning without final assembly (strategy 50)
Answer: D
QUESTION NO: 4
An enterprise based in the USA produces an end product that is used with the unit of
measure "pound" (LB). The material is now to be marketed in the EU. A prerequisite for
this is that the material can be sold with the unit kilogram (KG).
Which of the following solutions does SAP ECC offer?
A. In the basic data customizing, you create a unit of measure group that converts pounds
to kilograms. You then assign this to the material master on basic data view 1.
B. You create a new material with a reference to the original material and assign the
metric unit of measure to the new material master.
C. In the material master, you create a conversion factor for converting pounds to
kilograms on basic data view 1.
D. There is no need to take any action. There is a general conversion in the central
customizing of units of measurements, so that automatic conversion of pounds to
kilograms takes place.
Answer: D
QUESTION NO:5
Which of the following functions are available in the SAP ECC system for leveling
overloads in individual work centers with the capacity planning tools? (Choose three.)
A. Midpoint scheduling
B. Batch size optimization
C. Lot size optimization
D. Setup time reduction
E. Finite capacity scheduling
Answer: A,D,E
QUESTION NO: 6
The company that you advise does not want to manage certain value-intensive materials
in the warehouse stock. Instead, the user wishes to control material provision in such a
way that these materials are procured directly for the production and/or process order.
How can you fulfill this request? (Choose two.)
A. Using the special procurement key subcontracting in the material master for the
component
B. Using the special procurement key direct procurement/external procurement in the
material master for the component
C. Using the item type non-stock item in the bill of material for the material in question
D. Using the procurement type external procurement in the material master for the
component
E. Controlling the material in question as a co-product
Answer: B,C
QUESTION NO: 7
The user you advise requests that you make it possible for the user to produce materials
for stock, for customer orders, projects, orders and cost centers with production orders.
Where can you make settings to ensure these options?
A. Serial number profile.
B. Settlement profile.
C. Valuation variant.
D. Production scheduling profile.
Answer: B
QUESTION NO: 8
Which statement regarding lot size procedures is correct?
A. The procurement quantity of a lot size procedure can be specified using a safety time
period profile.
B. If a long-term lot size is in use, procurement is conducted with a long-term perspective.
C. If a make-to-order production strategy is in use, a lot for lot (exact) lot size is always
determined for the corresponding procurement element.
D. The lot size quantity can be influenced using a minimum quantity and the rounding
profile.
Answer: D
Download