TEMPORARY OPERATING INSTRUCTION No. 13-221 R3

O.O.

Name of

Outage:

13-11002 (ForbSVS)

13-12095 (907 Line)

13-12325 (SVS Bus)

13-12628 (F3M)

13-12629 (Run Caps)

13-12630 (Ros Caps)

MISO

No.

500 kV Forbes SVS and,

1-04137721

1-03863712

1-04626125 n/a n/a n/a

230 kV Line 907 (Shannon-Running) and,

500 kV Forbes SVS Bus (Breakers 8H and 602LX) and,

115 kV Line F3M (Ft Francis – International Falls) and,

230 kV Running Shunt Caps and,

230 kV Roseau Shunt Caps

File No. 240803

Effective Dates:

2013-12-03 from 0700 to 2013-12-04 at 1700 CST

(2013-12-03 from 0800 to 2013-12-04 at 1800 EST)

Standing Guide

Reference:

MHEX – USA Special Study as per K. Long 2013-11-27

Description of Work:

Forbes SVS: XCEL - Up-grade to the Forbes SVS

907 Line: MP – Maintenance/Line Rebuild

Forbes SVS Bus: MP - Conditional Assessment on Forbes Bus 1 Control & Protection

F3M: MISO – Posture Option 2 (907 Line Outage)

Running Shunt Caps: MISO – Posture Option 2 (907 Line Outage)

Roseau Shunt Caps: MISO – Posture Option 2 (907 Line Outage)

TRANSFER LIMITS:

MH-USA South (MH Export)

Location

USA

TTC

2000

RM

300

SOL: 1700

Transfer

(SOL)

1700

CRSG

150

OM

75

Schedule

Limit

Firm

Non-

Firm

1475 0

1475

Schedule

Limit

1475

MH-USA North (MH Import)

IROL

Location

USA

726836671

444

TTC

800

RM

400

SOL:

Transfer

(SOL)

400

400

CRSG

0

OM

400

Schedule

Limit

Firm

Non-

Firm

0 230

230

Schedule

Limit

230

Page 1 of 3

TEMPORARY OPERATING INSTRUCTION No. 13-221 R3

TLR

Triggers

South

TLR 1

South

TLR 3

1535 1550

North

TLR 1

372

North

TLR 3

380

MISO Webtool

Postings

MISO

Webtool

Postings TTC

MHEX_S

(Export) 2000

MHEX_N

(Import) 800

TRM

525

800

Coeff

1.000

0.713

Special Notes to MISO West

RC

726836671

A) During this prior outage condition generation curtailment of the St. Joseph and St.

Leon wind farms concurrent with TLR on MHEX_N may be required when

Manitoba to USA flows are north to prevent post contingent overloads on G37C following a trip of B10T or D602F.

B) The SOL for MHEX_S and MHEX_ N is the same if the MISO RTCA and MISO

Flowgate Monitoring Tool is unavailable prior to or during this outage.

C) If the MISO RTCA shows possible overloads on the Forbes TR7 500/230 transformer

(for the loss of the Forbes 500 kV Line 601) , MISO to review the following: i/ Pre Contingent flow on 500 kV Line 601 > 500MW. The loss of the Forbes

500 kV Line 601 will initiate a cross trip of D602F, and a HVDC reduction equivalent to 115% of the pre contingent flow on Line 602. ii/ Pre Contingent flow on 500 kV Line 601 between 350-500MW – the loss of the Forbes 500 kV Line 601 will initiate an HVDC reduction equivalent to 46% of the pre contingent flow on Line 602. iii/ Pre Contingent flow on 500 kV Line 601 <350MW – There will be No

HVDC reduction for loss of the Forbes 500 kV Line 601

If the MISO RTCA shows possible overloads on the Forbes TR7 500/230 transformer

(for the loss of the Forbes TR8 500/230 transformer ) MISO to implement congestion management to mitigate overload conditions.

Page 2 of 3

TEMPORARY OPERATING INSTRUCTION No. 13-221 R3

Special

Instructions to

MHEB

Operator:

A) TOI Extentions - This TOI may be extended until 23:59 by performing the following steps:

1.

Verify system conditions to confirm there are no additional tie line facilities

outages, or new internal MH outages.

2.

Review RTCA to confirm there are no new contingencies.

3.

Contact MISO to confirm there are no new outages, if there are no new outages

provide notice to MISO that MH is extending the TOI.

4.

Extend the outage in COLA.

5.

Update TLAP outage table.

6.

Provide notice to affected balancing authorities

B) For MHEX_N:

- The MHEX_N will at all times remain below 400 MW as measured at Dorsey,

Letellier, Richer and Glenboro stations.

- Manitoba Hydro will self-supply part of the CRSG as follows;

Manitoba Hydro Self-Supply > 270-MHEX_S

This will equates to a CRSG of 230.

C) AGC Control – Treat as system intact.

- Miso RC will monitor R50M and adjust AGC as necessary.

Prepared By: J. Cameron Date:

Revised By: J. Cameron

J. Cameron Revised By:

Revised By: D. Williams

Copies to:

SOSS, System Control Centre

NSSS, System Control Centre

GSSS, System Control Centre

Date:

Date:

Date:

MISO

2013 11 27

2013 11 27

2013 11 29

2013 12 02

GSO, System Control Centre

726836671 Page 3 of 3