1bZk9eDj01Jul2011192828

advertisement
Saeed Ullah
Engineering/Technical services
Personal
Info:
Saeed Ullah
DOB: Feb. 12, 1982
Gender: Male
KTM road Jinnah colony Khairpur Mir’s
Sindh
Pakistan
(+923337114351)
saeedullah8@gmail.com
Looking for engineering Position in dynamic engineering organization, which provides exposure,
training
and growth opportunities. I am eager to work in fast moving professional environment, where I can
Effectively utilize, implement and increase my skill and knowledge.
Objective:
Experience:
Organization
Designation
Location
Type of
Experience
Tenure
Description
DESCON Engineering Limited
Mechanical Engineer
Bhikki (Lahore).
Full Time
1st September 2009 to Date.
Descon Engineering is the Construction Contractor of 225 MW
Bhikki Power Project with Halmore Power Generation Company
(Pvt) Ltd. The Project is based on 2x6FA Gas Turbines from GE in
Combined Cycle Mode with Steam Turbine from GE. GE has also
signed 18 Years O&M Agreement with Halmore Power Generation
.
Worked with GE OIL & Gas Nuovo Pignone and also
with the GE Energy.
Mechanical Engineer is responsible for the erection of 2x6FA Gas
Turbines ,HRSG and also the Steam Turbine of GE at 225 MW
and its auxillaries related to the Gas turbine such as Lube oil
module , fuel gas module and Automizing module and also
Assembling of Transformers 25 MVA , 95 MVA and 100 MVA at
Bhikki Power Project .
The main responsibilities of Mechanical engineer are





To ensure the erection of GT,GTG, load gear, their
Structures Steam turbine and its auxillaries and
accessories, Modules, Interconnection and off-base
piping’s according to GE Standard Erection Procedures,
Drawings, Piping Isometrics, PID’s etc.
To manage the project and its resources in order to attain
targeted activities.
To prepare Daily, Weekly and Monthly Progress Reports.
To highlight and solve areas of concern and bottlenecks,
if any, in order to control the overall project schedule.
I have also experience of Gas Turbine interconnection &
off base piping work.I have done activity of pre
commissioning activity lube oil flushing & pressure tests
of Piping .
Organization
Designation
Location
Type of
Experience
Tenure
Description
Albario Engineering Private Limited
Project Engineer
Muridke (Lahore).
Full Time
1st Fabruary 2009 to 31 August 2009.
AEPL is the Construction Contractor of 234 MW Muridke Power
Project with Sapphire Electric Company Limited. The Project is
based on 2x6FA Gas Turbines from GE in Combined Cycle Mode
with Steam Turbine from Skodaexport and HRSGs from Alstom,
Czech Republic. GE has also signed 18 Years O&M Agreement
with Sapphire.
GT Engineer is responsible for the erection of 2x6FA Gas Turbines
at 234 MW Muridke Power Project.
The main responsibilities of Project engineer are





To ensure the erection of GT,GTG, load gear, their
Structures and accessories, Modules, Interconnection
and off-base piping’s according to GE Standard Erection
Procedures, Drawings, Piping Isometrics, PID’s etc.
To manage the project and its resources in order to attain
targeted activities.
To prepare Daily, Weekly and Monthly Progress Reports.
To highlight and solve areas of concern and bottlenecks,
if any, in order to control the overall project schedule.
I have also experience of Gas Turbine interconnection &
off base piping work.I have done activity of pre
commissioning lube oil flushing & pressure tests of Gas
Turbine piping .
Organization
Albario Engineering Private Limited
Designation
Mechanical Engineer
Location
Balloki (Lahore).
Type of Experience Full Time
Tenure
Description
5th May 2008 to 31st January 2009
AEPL is the Construction Contractor of 225 MW Balloki Power
Project with Orient power Company Limited. The Project is based
on 2x6FA Gas Turbines from GE in Combined Cycle Mode with
Steam Turbine from Skodaexport and HRSGs from Alstom, Czech
Republic. GE has also signed 18 Years O&M Agreement with orient
I was worked as Mechanical Engineer at 225 MW Combined
cycle Power plant Balloki Near Lahore. I have done the
erection of gas turbine structure with all auxiliaries
interconnecting and off base piping, alignment of rotary
equipments, erection of pumps, and erection of gas turbine
air inlet systems.
Organization
City District Government Karachi.
Organization Type
Automotive
Designation
Trainee Engineer in President National Internship
Programme
Location
Karachi.
Type of Experience Full Time
Tenure
May 2007 to May 2008
Description
Major over hauling of Automobiles.
Repairing the gearing system of automobiles.
Assembling of Diesel engines.
Replacement of crank shafts, connecting rods and valves
Inspections of Diesel & Petrol engines
Reason for Leaving Better Career
Organization
Allied rental & Services Limited.
Organization
Type
Power Generation
Designation
Trainee
Location
x-pertex Denim Power House, Karachi
Type of
Experience
Full Time
Tenure
October 2006 to April 2007
Engineer
Description
Allied rental & Services Limited
X-Pertex Denim Power House, Karachi
1. Working as operation and maintenance engineer on
Generator set 3508-A, 3512A, 3516B.
2. Routine operational checkups and maintenance.
3. Responsible for corrective maintenance.
Skill:
3 Entry(s)
Education:
2 Entry(s)
Affiliation:
2 Entry(s)
Skill Name
Level
Last Used
MS Office
Excellent
Currently Working
Primavera
Normal
Currently Working
Degree Name
BSc. Mechanical Engineering
Level Attained
Bachelors Degree (4 Years)
Percentage %
72 %
Institute
Quaid-e-Awam University of Engineering, Science and
Technology, Nawabshah
Address
Nawab Shah, Pakistan
Session
2002-2006
Majors
Mechanical Engineering
Organization
Pakistan Engineering Council (PEC) .
Role
Registered Engineer
Session
(19993/Mech:)
June 2006 To 2011
Experience : 6 GE Gas Turbine Executions
1 GE Steam Turbine Execution.
Trainings &
Seminars:
References:
2 Days Training on Accident Prevention and Safe Work Practices at DESCON Head
quarter
Lahore.
2)
2 Days Training on HSE for Line Managers at DESCON Head Quarter Lahore.
1)
Will be furnished on demand.
Download