BIO-DATA - insight alpha

advertisement
491014c55d28159948
RESUME
HARIKUMAR P.C
ADDL. GENERAL MANAGER(OPERATIONS)
(AN AS9100B COMPANY)
BRAHMOS AEROSPACE THIRUVANANTHAPURAM LTD.
CHACKAI.BEACH POST
THIRUVANANTHAPURAM
KERALA- 695007.
Date of Birth: 01-06-1957
Home address:
Varada, TC 7/1345(1)
Koottanvila road
Vattiyoorkavu P.O
Thiruvananthapuram, Kerala
PIN: 695013
Tel: 0471 2363021/Mob: 09745200328.
EDUCATIONAL QUALIFICATION
DEGREE
: MECHANICAL ENGINEERING,
UNIVERSITY OF MYSORE
: OCTOBER, 1983
MONTH,YEAR
OF PASSING
CLASS
: FIRST CLASS WITH DISTINCTION
PERCENTAGE OF : 71.85
MARK
AWARD
SAME WIL PRODYOGIKI AWARD 2010, FROM SOCIETY OF AEROSPACE
MANUFACTURING ENGINEERS.
TECHNICAL PROFICIENCY
v PROJECT AND PRODUCTION MANAGEMENT: Controlling and co-coordinating
of projects which involves Cost estimation, Raw material purchase, Machining,
Fabrication, Quality control, Inventory control and realization as per schedule.
Generation of manufacturing process plan for components, assemblies and sub-systems
and preparation of operation wise sequence of assemblies and systems.
Yearly and monthly sales & production plan preparation considering the factors like
capacity and resource utilizations, customer satisfaction, inventory control, continuous
cash flow etc.
v QUALITY SYSTEM MANAGEMENT: Development and implementation of
quality system procedures in line with ISO 9001:2000. Conducting internal audits and
periodic reviews of quality system procedures. Administration of development and
implementation of computerized production control system linking ISO & AS9100B
procedures. Exposure to lean concepts.
Controlling and co-coordinating of pre-engineering activities of projects in the areas of
process, material procurement, quality control etc to formulate cost effective
manufacturing cycle. Study of failures, rejections and respective quality costs for
continuous improvement..
Man Management
Presently 4 DM”s and subordinates. Identifying training and development needs of
subordinates.
Coordination
Coordinate with various agencies to realize production schedules and achieving project
milestones meeting quality requirements.
Present Experience
As AGM with Brahmos Aerospace Thiruvananthapuram Ltd.
(formerly, Kerala Hitech Industries LTD.)
(I)Asst. Manager (Machine shop) - 17/10/1992 to 14/05/1995.
Nature of Duties:Over all management of the Machine shop including procurement of tools, manufacturing
of LCA Engine components, various components and systems for DRDL and various
components for Rocket Engine and Control system components and assemblies for ISRO
programs.
(II) Asst. Manager/Dy. Manager (PPC) - 15/05/1995 to 15/10/1997.
During the period I was promoted as Dy. Manager on 17/10/1996.
With effect from 15/05/1995, I was in full charge and was exercising the power of
Manager(PPC).
Nature of Duties:(i) Estimation of drawings received from various divisions of ISRO, DRDL,GTRE,
HAL etc.
(ii) Preparation of process plans for various engines, Motors cases and components for
missiles, LCA Engine and Rocket Engine and other various components for ISRO.
(iii) Procurement of raw materials required for toolings and other parts.
(iv) Scheduling of manufacturing activities for various departments.
(v) Coordinating with various customers for technical activities.
(vi) Overall management of PPC including coordinating activities of various
departments.
(III) Dy. Manager (Fabrication) – 16/10/1997 to 12/12/2000.
During this period, I was promoted as manager Grade I on 17-10-2000.
I was exercising the powers of Manager from 16/10/1997 onwards.
Nature of Duties:(i) Overall management of fabrication, welding and heat treatment shops.
(ii) Fabrication of various motor cases for DRDL, L-40 tankage, fabrication and
welding of Titanium gas bottles, fabrication of Aluminium structures like thermal shroud
and protection plate GSLV program.
(iii) Fabrication and welding of LCA Engine components for GTRE.
(IV)Manager (Corporate Planning & MIS) – 13/12/2000 to 30/03/2001.
Nature of Duties:This included interaction with concerned departments to identify the problems regarding
production and to take necessary remedial measures what ever possible to increase
production and sales target.
(V). Manager(Machine Shop) - 31/03/2001 to 16/10/2004.
Nature of Duties:(i) Over all management of machine shop to achieve production targets.
(ii)
Manufacturing of Vikas Engine for GSLV/ PSLV programs.
(iii) Manufacturing of various precision and high precision Rocket Engine components
for VSSC,LPSC and IISU.
(iv) Machining of various types of Titanium Gas bottles for ISRO and DRDL.
(v) Manufacturing of various motor cases for DRDL.
(vi) Manufacturing of L-40 tankage for GSLV program.
(vii) Manufacturing of various precision components / assemblies for HAL and BARC.
(viii) Over all management of tool crib.
(ix) Estimation of drawing received from various divisions of ISRO & DRDO.
(VI). Dy.General Manager(Production) - 17-10-2004 to 14-06-2006.
I was head of the following departments.
1. General and Precision Machine Shop
2. Fabrication Shop & Welding Shop.
3. Special Process (Heat Treatment & Surface Treatment)
(VII). Dy. General Manager(Planning) – 15-06-2006 to 31/12/2207
Head of the following departments:
1. PPC
2. QC
3. QA
As a Dy. General Manager, I have been able to continuously improve the productivity
and also generate a profit for KELTEC which was earlier running at a loss. I am also
associated with various committees as detailed below:(i) Chairman of Task Team Constituted to interact with various sections and customers
to achieve production and sales targets.
(ii)
Member of the coordination Committee which formulates all policies regarding
the functioning of KELTEC.
(iii) Member of Senior and Junior Purchase Committee.
(iv) Member of Technical Committee.
(v) Member of standing Review Committee.
(VIII).ADDL.General Manager(Operations) - 01-01-2008 Onwards
Heading the following departments.
1.
2.
3.
General and Precision Machine Shop
Fabrication Shop & Welding Shop.
Special Process (Heat Treatment & Surface Treatment)
4.
5
PPC
Sub-Contract
Previous Experience.
I have worked in M/s Kerala Automobiles Limited, Aralumoodu (P.O) Neyyattinkara
from 27/07/1984 to 16/10/1992 and detailed below:
I have worked as Asst.Engineer (Tool Room) from 27/07/1984 to 14/12/1987 and as
Senior Engineer (Machine Shop) from15/12/1987 to 30/04/1991. I also worked as
Asst.Manager (Assembly) from 01-05-1991 to 16-10-1992.
The natures of duties during this periods are given below.
1. Achievement of Production Target.
2. Over all management of Machine Shop and Heat Treatment Shop.
3. Fabrication of Tools, Jigs and Fixtures.
In addition to the above assignment, I was in full charge of execution of sub contract
undertaken from various division of VSSC/ LPSC, Thiruvananthapuram for fabrication
of various precision components of rocket Engine and Control systems.
Other relevant information.
(i) Attended a training program in production Management conducted by NITTE,
Bombay.
(ii) Life member of NIQR
(iii) Life member of Society of Aerospace manufacturing Engineers.
1V Attend training program in AS9100B and ISO 9001-2008
V Active member of lions clubs international
Signature
Download