APJ Global Flow Solutions PROFESSIONAL RESUME OF KEY PERSONNEL Name: Disciplines: James O. Iwoh Process Engineering & Production Operations Qualifications: B.Eng. (Chem. Eng.) Professional Associations: Member, Nigerian Society Engineers Member, Society of Petroleum Engineers APEGGA Registration, NP Exam July 09 (final stage) Contact Details: 38 Sherwood Cove NW Calgary AB T3R 1R1 Canada Phone: +1 403 991 4233 E-mail: jamesiwoh@apjflow.com CAREER SUMMARY Over 18 years oil and gas industry experience in process conceptual and engineering design, deepwater flow assurance, production operations and engineering planning (all Shell E&P; Nigeria, Oman and USA). Able to leverage process engineering expertise and production operations skills to develop feasible engineering concepts and projects. Specific skills and experience include: Development engineering of oil and gas fields including CAPEX estimation and life cycle costs analysis; Conceptual designs and optimisation studies to define engineering projects in terms of technical scope, costs and execution; Thermal-hydraulic modelling for assessment of flow assurance risks (hydrates, wax, asphaltenes, scales, erosion, corrosion) and formulating control and mitigation measures in subsea deepwater designs; Proficiency in process engineering/pipeline hydraulics modelling tools; Olga, Hysys, Unisim, Pipesim, Multiflash, Pipephase, Two-phase for both steady and transient simulations; Hands-on skills in production operations including trouble shooting of plant problems, root cause analysis. Supervision and management of several production facilities; Prepare, review and approve process engineering deliverables from project teams; Cross discipline (subsurface-surface) liaison to define engineering projects required to meet Field Development Plans; Preparation of budget proposals and Asset Development Plans; and Value Engineering exercise for concept optimisation. Participation in HAZID, HAZOP and IPF Reviews. Chairing Design Reviews DETAILED PROFESSIONAL EXPERIENCE April 2009 - to date: Chief Technical Officer, APJ Global Flow Solutions (Canada/Nigeria) Flow Assurance and Process Engineering Consulting July 2008 - March 2009: Operations Manager, Shell Port Harcourt, Nigeria Effectively managed production operations and maintenance activities in 15 producing facilities APJ Key Personnel – April 2009 Page 1 of 12 APJ Global Flow Solutions PROFESSIONAL RESUME OF KEY PERSONNEL in mangrove swamp terrain comprising; pipeline systems/manifolds, pumps, production separators, compressors, metering, etc. Troubleshooting of plant problems, root cause analysis, technical audits, Operational excellence and HSE. Total oil production approximately 100,000 bopd and 90 mmscf/d gas. Workforce 95 Feb 2005 - June 2008: Lead Flow Assurance engineer, Shell EP Projects, Houston, USA (Shell International Assignment) Crosby Pastel Pink Project (Gulf of Mexico): Studied and developed Crosby Pastel Pink (CPP) flow assurance strategies incorporating thermal-hydraulics modelling of subsea systems, hydrate curves, prediction of wax and asphaltenes conditions, flowline sizing, insulation calculations, cooldown time analysis, slugging, blowdown, pigging, hotoiling, deadoiling, chilly choke analysis. Operability study included chemical injection requirements, fluid /chemical compatibility matrix, operating logic charts, well unloading etc. Princess II (Gulf of Mexico): New offshore well hook up to existing facilities. Similar activities performed as highlighted above under CPP. In addition, carried out extensive capacity calculations, impact of future waterflooding, concept evaluation of DVA well vs. Subsea well, monitoring of existing well tests to calibrate models, Opex implications of LDHI vs. Methanol applications. Ursa Princess Waterflood (Gulf of Mexico): Carried out extensive waterflood studies; flow assurance impact of waterflooding existing field, determined pressure requirements, lines /pumps sizing, case for methanol use, sea water filtration/treatment. Bonga NW, OPL 245 projects (Offshore Nigeria): Developed flow assurance and operability strategies; In addition to CPP activities above; validated PVT reports, assessed reservoir P,T uncertainties, wellbore geometry, uncertainties and location of SCSSV vs. Hydrates issues. Evaluated various opex scenarios wrt. chemicals for mitigation of flow assurance risks, blowdown or depressurization of hydrates plug from both ends of flowline to balance pressure drop, Chilly choke analysis due to extremely JT cooling. Training and development of young Nigeria (NETCO) flow assurance engineers. Bonga SW/A project (Offshore Nigeria): Hydraulic modelling of water injection systems using PIPESIM tool. Comprises ~ 40 injector wells (phase 1 and phase 2 pre-investment), two single 12” internally coated water injection flowlines, connecting two four hub manifolds. Incorporating learnings from Bonga main project, transient (surge analysis). Feb 2004 – Jan 2005: Head Planning and Economics, South Oman, Petroleum Development, Oman (Shell International Assignment) Responsible for South Oman business programme through identification, screening and economic evaluation of investment opportunities for hydrocarbon developments using PEEP (Petroleum Economics and Evaluation Program) tool. Asset team planning and coordination of business plans. May 2001 – Jan 2004: Lead Process/Concept Engineer, Petroleum Development Oman, PDO (Shell International Assignment) Responsible for new fields and existing fields Production System Optimisation, preparing Asset Development Plans, project economics and budget proposals. Liaison with subsurface engineers to define field development plans. Al Burj / Karim West Water Injection Surface Facilities Study: Supervised contractor staff; defining specifications with Reservoir Engineers, facilities definition, screening of water supply sources, identification, evaluation and selection of optimum facilities location. Harwell Early Development Facility: Project assessment, concept identification, selection and development of Harwell EDF facility. Tie-in to Birba high H2S facility and data gathering strategy for miscible gas flooding (phase2) most challenging part. APJ Key Personnel – April 2009 Page 2 of 12 APJ Global Flow Solutions PROFESSIONAL RESUME OF KEY PERSONNEL Nimr 3rd Large FWKO Tank Study: Supervised contractor staff in preparation of project brief and justification. Identification, evaluation and selection of optimum location for the Free Water Knock out tank. Identification of the piping tie-in points to minimise cost and shutdown deferment. Installation of Temporary Pipelines for Replacement of Nimr-C Pipeline: Emergency temporary replacement of 10km section of a 28” multiphase pipeline. Identification of tie-in points and manifold configurations to minimise oil deferment. The replacement pipelines were designed and installed within four months to prevent significant oil deferment. Deep Water Disposal Systems (Phases 6 and 7): Supervised contractor staff; Developed hydraulic model for the water disposals systems. Prepared and issued concept selection reports and asset development plans. Preparation of process engineering deliverables. Jan 1998 - May 2001: Operations Supervisor/Coordinator, Shell Warri, Nigeria Operations supervision. 8 facilities with large number of wells and pipeline networks. Start up, shutdown and routine operations of wells and facilities (pumps, compressors, metering, well testing, manifolds / flowlines etc.). Site HSE leadership and compliance, emergency drills. Coordinated company gas supply chain. Troubleshooting of plant problems, root cause analysis, technical audits. Driving operational excellence at sites. Nov 1992 - Dec 1997: Process Engineer, Shell Warri, Nigeria 1 of 2 engineers responsible for general process engineering supports to existing facilities operations and upgrades in Shell Warri operating unit; covering 34 oil gathering facilities, 4 gas processing plants, 1 crude export terminal (Forcados) and 1 inland crude dehydration terminal (UQCC). Built process models (using PRO/II, Pipephase, TwoPhase, Vessel sizing program etc.) to support various studies and design work. Did extensive work on integrated production systems modeling and capacity checks /operating envelop. Jan 1991 - Nov 1992: Flowlines design engineer, Shell Warri, Nigeria Sized and designed new flowlines to connect wellheads to production facilities. Planned and ordered flowline materials for construction in 3 year planning cycle. Custodian of design basis, pressure ratings, control and safeguarding systems. Prepared and issued AFC and as-built drawings for construction purposes. APJ Key Personnel – April 2009 Page 3 of 12 APJ Global Flow Solutions PROFESSIONAL RESUME OF KEY PERSONNEL Name: Discipline: Madhav Desai Process Engineering Qualifications: B.Eng. (Chem. Eng.), CEng, MIChemE. Professional Associations: Member, Institution of Chemical Engineers Member, Society of Petroleum Engineers Contact Details: 36 Abinger Avenue Cheam SUTTON SM2 7LJ Phone: 07799 584 519 E-mail: madhav.desai@apjflow.com CAREER SUMMARY Over 16 years experience in process conceptual and engineering design, trouble-shooting and energy conservation studies in upstream oil and gas and petrochemical industries. Specific skills and experience include: Development engineering and conceptual design of oil and gas field developments; Pre FID development engineering and studies for oil and gas field developments; Conceptual design of acid gas field development and EOR/IOR projects including CO 2, water and steam injection; Familiar with Que$tor and Berwanger OGM (Oil and Gas Manager) software for preliminary costing of upstream oil and gas facilities; Conceptual design and optimisation studies to define engineering projects in terms of technical scope, costs (CAPEX Estimation and life cycle costs analysis) and execution; Prepare, review and approve process engineering deliverables from project teams; Cross discipline (subsurface-surface) liaison to define engineering projects required to meet the corporate Field Development Plans; Preparation of budget proposals and Asset Development Plans; Value Engineering exercise for concept optimisation; Participation in HAZOP and IPF Reviews. Chairing of Design Reviews; Steady state process and hydraulic simulations, flare radiation and gas dispersion analysis; Well versed with relevant International Standards and Recommended Practices; and Process Discipline resource estimates (CTR) for Conceptual and FEED projects. Energy conservation studies, process heat integration and waste heat recovery in oil and gas, LNG and petrochemical production facilities. APJ Key Personnel – April 2009 Page 4 of 12 APJ Global Flow Solutions PROFESSIONAL RESUME OF KEY PERSONNEL DETAILED PROFESSIONAL EXPERIENCE June 2007 to date: OAG Energy Consulting Limited Seconded to BG Group Ltd. June 2007 – To date BG Group Ltd. Lead Development Engineer Hassi Ba Hamou (Algeria) Development Engineer for HBH gas field development in Algeria, managing field development planning, conceptual study and other engineering activities during the pre-FID phase. Working in BG’s multidisciplinary team, I have developed facilities definition to assist CAPEX and OPEX estimation feeding into economics, prepared the scope of work for the conceptual study. I carried out Lifecycle Cost analysis to determine optimum development configuration and facilities capacity. Currently, I’m monitoring the progress of the conceptual study and other preparing the surface facilities section of the Final Discovery Report to be submitted to the Algerian authorities. Southwest Synergie Group Working with Sonatrach and other IOC’s on the preliminary design of an evacuation pipeline to provide export route for the Southwest region gas fields in Algeria. Development Engineering work for BG Advance (International) Ultra deepwater Offshore Development Ultra deepwater development (2,000m+) of an oil prospect off East African coast – identification, screening and evaluation of development concepts and market research for sales of associated gas. Point Thomson Development Assessment of different development concepts for Point Thomson gas-condensate field in Alaska to support the commerciality study. Project Carbon (confidential) Assessment of gas field development options for several onshore blocks for a potential Merger and Acquisition opportunity. Various Bid Rounds 2007-08 Conceptual development plans for the blocks of interest that are available on the offer in the bid rounds in various countries in Asia, Africa and North Africa. August 2004 – June 2007 Granherne Ltd., UK Senior Consultant Exxon Mobil / MNSL Beryl Alpha Emission and Energy Study Screening study to identify potential opportunities to minimise energy consumption and emissions from the offshore processing facilities in the depleted North Sea field. SAGE Gas Plant Integrity Study Integrity assessment of the SAGE terminal gas plant for planned field trials at higher throughput to cover pressure relief review and analysis of acoustically induced vibrations in piping and thermowells (Atlantic and Cromarty tie-back). BP ACG Future Developments Identification and evaluation of compact alternative technologies for oil and gas dehydration on an offshore platform, with the objective of minimising the topsides weight. APJ Key Personnel – April 2009 Page 5 of 12 APJ Global Flow Solutions PROFESSIONAL RESUME OF KEY PERSONNEL ACG Wax Mitigation Assessed severity of wax deposition in crude oil and its impact on installed facilities. Developed alternatives to process waxy crude and minimise the impact on operation. Equipment requirement, input for preliminary cost estimates and tie-in and shutdown requirement for implementation of the modifications. Taurt Field Development Offshore gas field development in Egypt - evaluation of development concepts, steady state process simulations, heat and mass balance, pipeline and compression requirements, equipment lists and preliminary equipment sizing for each option, evaluation of new technologies for multiphase metering and low dosage hydrate inhibitors. Valhall Gas Plant Capacity Study Benchmarking the performance with operating data through process simulation, identification of bottlenecks and evaluation of simple de-bottlenecking measures to maximise throughput of the gas compression train. TNK-BP (West Siberian Oilfields) Russkoye Field Sand Management Study Study of alternative sand handling, cleanup and disposal processes for sand produced from the heavy oil field. Kammenoi Field Development Lead Process Engineer. Developed Design Basis. Determined facilities and infrastructure requirements for different field development and depletion options and rig cases, including preliminary “Select” stage cost estimates and economic feasibility of segregating extra light crude to achieve higher net backs. Van Yogan Heavy Oil Field Development Determined facilities and infrastructure requirements for a number of field development and depletion options (cold production, cold water injection, hot water injection and steam flood) and rig cases. Developed preliminary cost estimates for the “Assess” stage of the project. INPEX Browse Ltd Kimberley LNG Plant Carbon Emission Optimisation Study Screening study to identify potential opportunities to minimise energy consumption and emissions for the proposed LNG plant in Northwest Australia. Potential identified for up to 12% reduction in energy and emissions from 2 x 3.8MMTPY trains installation. BG Group Confidential project: Sour Gas Field Development Conceptual design of CO2 injection facilities as part of due diligence process for field development plans for two sour gas fields. Dimlington Due Diligence Conceptual design of gas processing facilities and re-routing of inlet pipeline as part of due diligence process. August 1998 - July 2004 Granherne LLC, Oman Concept Engineer Qatar Petroleum Halul Island Integrated Oily Water Drain and Sludge Handling Identification and evaluation of options and process selection for handling and disposal of oily water and oily sludge produced at Halul island terminal facilities. Halul Island Tank Management / Crude Loading System Hydraulics Development of hydraulic simulation model and study capacity limitations of loading pumps, pipelines and the SBM system. APJ Key Personnel – April 2009 Page 6 of 12 APJ Global Flow Solutions PROFESSIONAL RESUME OF KEY PERSONNEL The Gulf Co-operation Council (The GCC) Arabian Peninsula Crude Oil Pipeline Study investigating the feasibility of installing a pipeline network through the region, as means of rerouting substantial crude exports and rationalising current tanker movement in the Arabian Gulf. Petroleum Development Oman (PDO) Secondment To PDO Engineering Group (2002-2004) Senior Concept Engineer for South Oman fields. Responsible for Field Production System Optimisation, preparing Asset Development Plans, project economics and budget proposals. Liaison with subsurface engineers to define field development plans. Assisting development of young Omani process engineers. Nimr 3rd Large FWKO Tank Study Preparation of project brief and justification. Identification, evaluation and selection of the optimum location for the Free Water Knock out tank. Identification of the piping tie-in points to minimise cost and shutdown deferment. Al Burj / Karim West Water Injection Surface Facilities Study Defining the specifications with the Reservoir Engineers, facilities definition, screening of water supply sources, identification, evaluation and selection of optimum facilities location. Installation of Temporary Pipelines for Replacement of Nimr-C Pipeline Emergency temporary replacement of 10km section of a 28” multiphase pipeline. Identification of tie-in points and manifold configurations to minimise oil deferment. The replacement pipelines were designed and installed within four months to prevent significant oil deferment. Flare and Blowdown Study Marmul Gathering Stations Establishing relief scenarios, governing relief loads and relief valves adequacy checks. Developing hydraulic model for the flare network to check the flare system and relief valve adequacy at peak flare loads. Checking the flare stack sterile area adequacy. June 1992 - July 1998 Herdillia Chemicals, India. Process Engineer Concept development, design and commissioning of GT based co-generation plant (5 MW, 38 T/hr steam). Concept identification, development, design and commissioning of distillation column heat recovery scheme. Concept identification, development, design and commissioning of ammonia vapour absorption refrigeration plant using process waste heat recovery. The new plant replaced Freon refrigeration units. Identified, designed and commissioned several minor energy conservation schemes in petrochemical plant (improved steam condensate recovery, replacement of steam jet vacuum ejectors with electric vacuum pumps, improved high temperature insulation, improved monitoring and instrumentation of heat integration schemes, etc). Preparation of process engineering deliverables. APJ Key Personnel – April 2009 Page 7 of 12 APJ Global Flow Solutions PROFESSIONAL RESUME OF KEY PERSONNEL Name: Discipline: Christopher Hayes Project Controls Consultant (Cost Estimating, Planning, Project Services, Project Controls) Qualifications: OND Technology. Contact Details: 36 Abinger Avenue Cheam SUTTON SM2 7LJ Phone: 07799 584 519 E-mail: to be defined CAREER SUMMARY Over 30 years experience in the Oil and Gas industry. A versatile project controls engineer experienced with project management, planning, estimating and cost control. Experience in both onshore and offshore environments. Experience in design, engineering, fabrication, construction, installation and commissioning environments. Specific expertise covers the following project areas: Gas gathering, processing, compression and re-injection facilities LNG Liquefaction and Re-gas. Oil Gathering, Processing and Transportation. Sulphur extraction and transporting. Pipeline systems. Subsea installations. Brown field modifications offshore and onshore. Field development multiple offshore fields with platforms and FPSO’s. Development of multiple platform fields Power stations Development of Estimating Systems Conceptual studies Offshore construction Installation and hook-up Heavy Lift Vessels Transport and Installation, Deep water system installation techniques Computer literacy (software packages including Open Plan, MS Projects, Primavera P3, Primavera P3e/c, Primavera 6, Pertmaster 8 and most versions of Artemis in addition to complete PC literacy). IHS Questor expert user. Member of the Performance Forum, CERA, and Gucenet. Worked in the UK and overseas serving a wide range of projects for various operators including ADNOC, Amerada Hess, Amoco, BG, BHP Billiton, BP, Britoil, Burlington, Burullus, Calenergy, Chevron, Conoco- APJ Key Personnel – April 2009 Page 8 of 12 APJ Global Flow Solutions PROFESSIONAL RESUME OF KEY PERSONNEL Philips, Dominion, Elf, Encana, Esso, HRL, KKM, Lasmo, Marathon, NAM, Norsk Hydro, Paladin, PetroCanada, PPCo, PPCoN, RAMCO, Saga, SGC, Shell, Statoil, Sonatrach, Technip, Texaco, Unocal, Vanco, Wintershall: DETAILED PROFESSIONAL EXPERIENCE Aug 2005 – To date Sr. Project Controls Consultant Member of the Engineering and Facilities group specialising in Cost Estimating and Project Controls techniques. Providing estimates for potential development and ongoing projects. Providing engineering audits for ongoing projects. Providing scheduling for future prospects and performing analysis on third party schedules. Providing specialist input to the corporate community of practice with respect to project controls techniques. Supporting Projects as required. May 2005 – Aug 2005 Petro-Canada Ltd. HMC Heerema Marine Integrated Planning Set up of new integrated planning system for the Company based around P3e/c. This is to develop the whole efforts of the Company into one type of integrated plan that incorporates transport and installation with the required engineering and procurement effort for individual projects and further to enable multi project role up to establish cross Company resource requirements. May 1998 – Apr 2005 Genesis Oil and Gas Project Services Manager GUPCO – Offshore North Sinai FEED Production of Field development Schedule and FEED Estimates for an Offshore, Onshore and Pipeline Project in Egypt. AGIP KCO – Kashagan – Pre Concept Selection Production of a study to determine the fastest installation Schedule for the Kashagan Full Field Development. This Technical Note was Used to Determine the factors that should be considered in detail within the Concept Selection for the Full Field Development. Shell – Update of FEED for Southern Swamp) Estimate updates for the Project. Burullus - Simian/ Sienna and Sapphire Development Project Project Services Manager and Package engineer for the Local Equipment Room. Involved with setting up initial project master schedules and developing schedules for Enppi to perform engineering works to fit the overall project schedule. Other duties include the package engineering for the LER involving close liaison with Consafe to ensure the design and delivery of the LER meets with overall project requirements. RAMCO - Seven Heads Development Project Project Manager for the development of the brown field modifications required to Kinsale ‘A’ (Marathon) to accept and process the Seven Heads gas. Liaison with Marathon on design of the modifications required to the existing topsides and liaison with the subsea engineering team. BG - Juno Development Define Phase (FEED) Development of cost estimates, implementation plan, and interfacing co-ordination for the Juno development project define phase (FEED). APJ Key Personnel – April 2009 Production of Development Schedule and Page 9 of 12 APJ Global Flow Solutions PROFESSIONAL RESUME OF KEY PERSONNEL BRIS - Calder field development project (FEED) Development of cost estimates and implementation plan for the Calder field development FEED project. BG - Juno Development Define Phase (Conceptual) Development of cost estimates and implementation plan for Juno Development options select phase. SPDC - Bonny Oil & Associated Gas Development Cost estimate for development of flow station upgrade and new associated gas gathering facilities (+25%) and preparation of overall project implementation plan. Texaco North Buzachi Upgrade Project Services Manager giving support to the project producing project execution schedule and project budget estimate. KKM Field Development – Kazakhstan Project Services Manager on the FEED development for this Oil gathering, processing and transportation project located in Kazakhstan. This project required the development of option and selection estimates and proposed project development schedules. Burlington Millom West Development wellhead platform project. Burlington Dalton and Millom Field Development responsible for project services within the PMT. Apr 1997 – Apr 1998 Project Services Manager on a minimum facilities ABB Lummus Global Ltd. Project Services Manager for Burlington Manager, Project Services Manager of Project Services responsible for the London Oil and Gas operations. Dec 1993 – Nov 1997 ABB Lummus Global BV. Manager, Project Services Manager of Project Services responsible for the Leiden Oil and Gas operation. Specific responsibilities included as study manager the preparation of multiple process studies and cost estimates for various Clients. Amoco - P15/P18 Compression All matters concerning project cost and planning, Preparation of and planning for, tie-in and hook-up detailed work packs, Offshore hook-up contract formulation, award and administration, Representative for AMOCO during fabrication of hook up requirements phase, Offshore Construction Manager during tie-in and hook-up. (SODM Supervisor A). APJ Key Personnel – April 2009 Page 10 of 12 APJ Global Flow Solutions PROFESSIONAL RESUME OF KEY PERSONNEL Feb 1989 – Nov 1993 ABB Global Engg Ltd. Project Services Engineer Statoil, Sleipner Condensate (Karsto Terminal) Project Engineer during the detail engineering, fabrication and construction phases of the project. This work included co-ordination between fabrication yards and main construction site. Other responsibilities included assuming Company Representative role for Statoil for the tankage and module contracts. Various time was spent after contract completion assisting Statoil in litigation with various court appearances as an expert witness. Amerada Hess, Hudson Field Development Lead Planning Engineer. Including input to the conceptual design of floating production facility with various export options. Shell Nigeria EA Field Development Project Lead Planning Engineer. During the conceptual design phase of multiple wellhead platforms, processing platform and infield pipelines. British Petroleum Safety Project Lead Planning Engineer. Assigned to a project involved with producing the conceptual and detailed engineering for the installation of subsea isolation valves prior to the Cullen Report issue. Work involved producing the required engineering, the fabrication tender packages and the planning of the offshore installation and hook-up. Phillips Petroleum, Stavanger, Norway – 2/4N Lead Cost Engineer on a nitrogen injection project for Ekofisk. Responsible for all aspects of cost control and for preparation of the “approval for expenditure” estimate. Nov 1986 – Feb 1989 Fluor Daniel Various positions. Fluor Daniel (GB) P.S.A. / A.W.E. Control Team Manager responsible for cost and scheduling control. D.S.M. / Du Pont / Esso / Shell / G.E., Haarlem, Netherlands Proposals Engineer responsible for the preparation of various proposals for Fluor Daniel mainly within the European market. Ministry of Defence - Property Services Agency and cost control. ADNOC - Bab and Asab NGL Extraction Plants Senior Cost Engineer responsible for the compilation of the major equipment capital cost estimate and the definitive estimate for a gas gathering and gas processing plant in Abu Dhabi. Also responsible for project cost control and internal financial forecasting. Site Planning Engineer. Site planning Fluor Daniel Middle East Ltd. ADNOC, Abu Dhabi, - Thammama ‘C’ Gas Re-injection Control Team Manager responsible for the project service team on this contract comprising of a gas re-injection facility and onshore pipeline system and six gas injection wells and well pads. Systems used were ARTEMIS in the Home Office and Primavera in the field. APJ Key Personnel – April 2009 Page 11 of 12 APJ Global Flow Solutions PROFESSIONAL RESUME OF KEY PERSONNEL June 1986 – Nov 1986 IBI Services AG Lead Planning Engineer. Homs Power Station, Libya Lead Planning Engineer responsible for the planning effort of the company. The major contract was a 500MW power station at Homs in Libya. Sept 1977 – May 1986 Fluor Daniel Various positions. Fluor Nederlands BV Esso Nederlands BV - Esso Flexicoker Senior Planning Engineer responsible for the planning and progress tracking of all offsites, utilities and revamp areas, liaising with Esso maintenance staff and field supervision, also liaising with the subcontractors required for the works. Fluor Middle East Ltd ADNOC, Habshan, Abu Dhabi - Thammama ‘C’ Senior Cost Engineer responsible for the maintenance of the field costs for a gas gathering system and gas processing plant. Fluor Daniel (GB) ADNOC - Bab and Asab NGL Extraction Plants Senior Cost Engineer responsible for the compilation of the major equipment capital cost estimate and the definitive estimate for a gas gathering and gas processing plant in Abu Dhabi. Also responsible for project cost control and internal financial forecasting. Cost Engineer. June 1975 - Sept 1977 Pritchard Rhodes Ltd. Cost Engineer Skikda 40/50/60 LNG Base Load Liquefaction units Cost Engineer. June 1974 - June 1975 APJ Key Personnel – April 2009 Ilford Films Ltd. Research Physics Engr. Page 12 of 12