1994 Alusaf Hillside Smelter Construction of the Alusaf Hillside smelter begins. Although aimed at the export market with estimated net foreign exchange earnings of R2.3 billion per annum, important downstream opportunities will be created by the increased availability of low cost ingots locally. Tongaat-Hulett is to investigate the feasibility of expanding the aluminium rolling facility at an estimated cost of R1.4 billion, representing a major downstream beneficiation step. www.idc.co.za