4071 - Civil Engineering

advertisement
Atul Gaur
E-Mail: atul_gaurs@yahoo.com; Contact: 08290438469 / 09352746816
Address: L-275A, Lajpat Nagar, Sahibabad – 201005, Uttar Pradesh
TOP LEVEL MANAGERIAL ASSIGNMENTS IN:Civil Engineering (Site & Construction Management and Project Management)
Preferred Location: North India
Professional Preface

An astute professional with B.Tech. (Civil Engineering), offering nearly 19 years of extensive experience in:- Project Management
- Site / Construction Management
- Quality Assurance
- Resource Management
- Engineering Coordination
- Vendor Development
- Construction Management
- Contract Management
- Man Management
 A project planner; adept in handling multi-discipline contracts involving Civil & Construction Works.
 Comprehensive experience of 18 years in managing Oil & Gas Plant, Thermal Power Plant, Industrial Work,
Residential and Township Projects.
 Associated with ANCL & Co. (India) Pvt. Ltd. as DGM (Execution), current location - RSWM Spinning Mill
Project– Banswara (Rajasthan).
 A project planner with expertise in planning, executing and spearheading various projects in compliance to quality
standards. Rich experience in swift ramping up projects through monitoring and analysis of project status.
 Acquires a clear understanding of the industry, technology trends with the distinction of instituting new practices
to achieve business excellence at the lowest overall cost.
 Proven skills in managing teams to work in sync with the corporate set parameters & motivating them for
achieving business and individual goals.
 Excellent relationship management, analytical and negotiation skills with deftness in swiftly ramping up projects in
co-ordination with clients, architects & consultants.
Employment Scan
Nov’10- At present with ANCL & Co. (India) Pvt. Ltd. as DGM (Execution)
Client
EPC Contractor
Major Work
Project Cost
:
:
:
:
GVK Thermal Power Plant (2X270MW) – Punjab.
Punj Lloyd Ltd.
2X270 MW TG DECK, Power house foundations, Electrical bay, Mill Bunkers, ESP.
Rs. 10 Crore.
Client
Major Work
Project Cost
:
:
:
RSWM.
Expansion of Spinning Mill.
Rs. 8 Crore.
Accountabilities
 Organised skilled & unskilled manpower; planned & managed resources and team of staff at site.
 Monitored work progress; removed bottlenecks to keep the project on track.
 Ensured quality of work and site safety; ensuring project profitability.
Mar’10-Nov’10 with EPC Contractor - LANCO Infratech Ltd. – Project Coordinator (AGM) – Head Office
Client
Major Work
Project Cost
Accountabilities
:
:
:
IL & FS Ltd.
Intake, W.T.P. Structure, Raw Water Reservoir, Pipe Line.
Rs. 465 Crore.



Finalised vendors and contractors; controlled cost.
Coordinated with design, site and client.
Tracked physical & financial progress of the project with respect to target.
Oct’08-Feb’10 with EPC Contractor - BGR Energy System Ltd. as Sr. Manager – Site Execution for 600 MW
Thermal Power Plant
Client
Major Work
:
:
Project Cost
:
APGENCO (Kothagundam) A.P.
Mill Bunker, FD FAN, ID FAN, Ash Water Pump House, DM Water Storage Tank & Pump House,
Fuel Oil Pump House and Switch Yard.
Rs. 800 Crore.
Accountabilities
 Coordinated with design, client, consultant and sub - contractors to get work done as per contract.
 Ensured quality of work, safety at site and certification of sub – contractor’s bills.
 Monitored physical & financial progress of project with respect to target.
Nov’06-Oct’08 with EPC Contractor – Kirloskar Construction & Engineers Ltd. as Project Coordinator
(Manager) – Head Office
Major Work - Coal Jetty, Diaphragm wall in Mangalore (Lanco Power)
BHEL Expansion Plant (Tirichy).
Oil & Gas Plant (Thirkaidur).
Chemplast Plant (Cuddalore).
Project Cost - Rs. 60 Crores.
Accountabilities
 Finalised vendors and contractors; controlled cost.
 Coordinated with design, site and client.
 Monitored physical & financial progress of the project with respect to target.
Jan’97-Oct’06 with Client – Hi-Tech Carbon, Chennai (Aditya Birla Group) as Sr. Engineer
Major Work – Captive Power Plant (2.5 MW, 6.0 MW & 8.5 MW).
Carbon Black Plant from Green field to Commissioning.
Township, Master Batch Plant.
Project Cost – Rs. 430 Crore.
Accountabilities
 Executed work as per drawing & contract schedule; ensured quality control & safety and certificate of contractors
bill; coordinated with internal and external agencies.
 Handled project for commissioning and final production.
Aug’93-Dec’96 with B.N. Goel Construction Co. Mathura as Site Engineer
Major Work – Industrial Work.
Project Cost – Rs. 20 Crore.
Accountabilities
 Executed work as per drawing & contract schedule; ensured quality control & safety and certificate of contractors
bill; coordinated with internal and external agencies.
 Handled project for commissioning and final production.
IT Proficiency: Conversant with MS Project, STAAD and MS Office Applications.
Scholastics: B.Tech. (Civil Engineering) from H.B.T.I., Kanpur in 1993. Secured 71% marks.
Personal Dossier
Date of Birth
Linguistic Abilities
:
:
21st November, 1971
English, Hindi and Tamil
Download