Personal Resume PRINCIPAL INSTRUMENT ENGINEER NAME: George M Crerar ADDRESS: 15 Kirktonside, Brae View Estate Barrhead Glasgow G78 2LH Telephone No: Mobile: E-Mail: Web Site: 44 (0)141-881-7800 44 (0)771-362-5182 george@gcrerar.com http://www.gcrerar.com/ DATE OF BIRTH: 05-05-48 NATIONALITY: British MEMBERSHIP OF PROFESSIONAL BODIES: QUALIFICATIONS: M.InstMC., MEI. Sen. M.I.S.A., B.Sc. (EET). COURSES: R.G.I.T. Offshore Survival, Fire-fighting & First-Aid Course. Danish Offshore Survival Course FIELDS OF EXPERIENCE: Feed and detail design of Instrument and Control systems for onshore and offshore petrochemical installations; Construction Supervision; Commissioning; Platform Topsides, Semi Submersible, Floating Production and Storage Facilities, Refineries; ESD, PSD, Fire & Gas, Safety Relief and Control Valves, VMS (Vessel Management System) including , Sub-sea systems ACDP, HIPAP, bilge / ballast system, utility systems etc., WORK HISTORY: Oct. 10 – Present Aker Solutions Ltd., Principal Instrument Engineer Fairfield Energy Project Responsible for all field instrumentation and package units associated with a new Fuel Gas Import project on the “Dunlin A” platform. Preparation of Technical Specifications, Requisitions and Datasheets. Review and approval of the Vendors overall detailed engineering design with respect to the instrumentation and control system activities, to ensure compliance with the scope of work and current specifications, standards and regulations. Nexen (UK) Ltd., Part of a team of engineers working on modifications and upgrades to Nexen’s Buzzard and Scott platforms. Nexen wish to increase the design capacity of the new PS platform from 205mbpd to 230mbpd , review design limitations and potential integrity / loss of containment hazards for the revised service. Duties included the generation and checking of instrument data sheets, reviewing and commenting on vendor documentation, providing the vendors with the necessary application data and support. The use of INTOOLS to generate an instrument database based index, specifications, datasheets and reports. Preparation of Workpacks, detailed estimates and CTR’s for the Instrument discipline. Oct. 05 – Feb. 10 Fabricom - Norway. Lead Instrument Engineer BP Valhall Decommissioning Participation in conceptual studies in preparation for the Decommissioning of the Valhall PCP & QP installations. Input into HAZID’s and HAZOP’s. Supervising Engineers and designers in the preparation of work packages. Preparing detailed estimates and CTR’s for the Instrument discipline. BP Valhall “Unit Conversion” Responsible for all aspects of the conversion of the BP Valhall Installations Instrumentation from using Imperial units to Metric, COPNO “FTP Bypass” Project Responsible for all field instrumentation, package units and Fire & Gas field devices on the “FTP Bypass” Project. Package engineer for the HIPPS and Pig Launcher packages on EKOFISK 2/4B. Feb. 05 – May 05 Jacobs Engineering U.K. Ltd., Senior Instrument Engineer Part of a team of engineers working in conjunction with BP engineering responsible for the specification and procurement of all instrumentation hardware requirements to extend the Sulphur Recovery process their existing refinery in Grangemouth by the addition of a new unit SRU6. June 04 – Jan. 05 Optima Integrated Energy Services Lead / Sen. Instrument Commissioning Engineer Part of a team of Commissioning Engineers responsible for the preparation of Commissioning procedures and Plans for the commissioning of the “Early Works” phase of the Kashagan Field Development for Agip KCO in Kazakstan. Aug. 02 – March 04 BP Thunderhorse Project ‘Semi-Submersible PDQ’ – South Korea Lead. Instrument Engineer– BP Site Team Engineering Supervision/Coordination VMS (Vessel Management System) including , Sub-sea systems ACDP, HIPAP, bilge / ballast system, utility systems etc., ESS, PMS, RMS and all external communication systems. Review and approval of the Fabricator’s overall detailed engineering with respect to the instrumentation and control system activities, to ensure compliance with the scope of work. Perform FAT’s and review of Fabricator’s work to ensure compliance with ABS, USCG, Fabricator’s own quality plan and Company requirements. Provide overall technical guidance to Fabricator’s engineers during the detailed engineering phase. Respond to site queries. Lead I&C Engineer -Construction Supervising a team of inspectors, perform a review of fabricator’s work to ensure compliance with fabricator’s own quality plan and Company standards pertaining to the Thunder Horse Project. Perform Goods inward inspections on all I & C related equipment to ensure compliance with the relevant regulations, completion status and condition upon receipt. Ensure that all I & C related installation work carried out during construction complies with regulatory requirements, company standards and that the fabricator applies good engineering and safe working practices. Record any non-compliance from engineering design or statutory requirements and confirm that the correct remedial work is carried out in a satisfactory and timely manner. Sept. 01 – April 02 Jacobs Engineering B.V. - The Netherlands Senior Instrument Engineer Dec. 00 – Aug. 01 Fluor Daniel B.V. - The Netherlands Senior Instrument Engineer April 00 – Sept. 00 Coastal & Ocean Eng. Ltd., Sen. Interface Engineer Dec. 97 – Dec.99 Brown & Root Energy Services - Norway Lead Instrument Engineer July 97 – Nov. 97 Aker Maritime - Norway Instrument Group Lead Engineer March 96 - June 97 Fluor Daniel B.V. - The Netherlands Senior Instrument Engineer Jan 95 – Feb. 96 COWIconsult A.S. – Denmark Lead Instrument Engineer June 92 – Jan. 95 Fluor Daniel B.V. - The Netherlands Senior Instrument Engineer (Shell Pernis & Esso Hydrocracker Rotterdam Refinery) Sept. 90 - June 92 Brown & Root Vickers (BP Bruce) Senior Instrument Engineer Sept. 89 – Sept. 90 Fluor Daniel - The Netherlands Lead Instrument Engineer Oct. 88 – Sept. 89 Metz Process Control \ Petrovest A\S Senior Instrument Engineer March. 88 – Oct. 88 Humphreys & Glasgow Ltd. Senior Instrument Engineer Nov. 87 – March 88 McDermott Engineering, Aberdeen Senior Instrument Engineer March 87 – Nov. 87 Offshore Design Ltd. Senior Instrument Engineer Nov. 86 – March 87 J.P. Kenny & Partners Instrument Section Leader Feb. 86 – Oct. 86 McDermott Engineering, Aberdeen Instrument Engineer June 85 – Jan. 86 Wood Group Engineering Design Ltd. Instrument Engineer Jan. 85 - June 85 Inspectorate E.A.E. Ltd. Instrument \ Electrical Engineer Nov. 82 – Jan. 85 Lameren Engineering Ltd. Instrument \ Project Engineer Oct. 82 – Sept. 83 Total (MCP01) Instrument Engineer (Construction) April 82 – Oct. 82 Phillips Petroleum Company Instrument Commissioning Engineer April 81 - March 82 Wood Group Engineering Design Ltd. Instrument Engineer Aug. 80 - April 81 Delta Projects (U.K.) Ltd. Instrument Section Leader 1979 - 1980 McDermott East Anglia Field Project Engineer 1974 - 1978 Mercury Marine Ltd. Engineer \ Purchasing Manager 1973 - 1974 Combined Engineering Services Ltd. Commissioning Engineer 1966 – 1973 James Howden & Co. Ltd. Apprentice Fitter \ Turner, Draughtsman \ Sen. Progress Engineer.