MECHANICAL (POWER) 1. ORGANITION Mechanical Loco Department is headed by Sr. DME (POWER). Assisted by ADME/P. There are 3 integrated crew lobbies at JP,BKI and FL .All crew lobbies are provided with CMS facility. There are 3 RDI’s at JP, FL and RE.. There are 4 Running rooms ‘A’ category running rooms at JP, FL, RE and ‘C’ category at LHU. 2. STAFF STRENGTH SN 1 Category Running staff Maintenance staff Total 2 3. Sanctioned strength 899 Staff on roll Vacancy 809 90 240 209 31 1139 1018 121 CATEGORY WISE POSITION OF RUNNING STAFF Category SS On roll Vac. LPM LPP CCR/PCR 72 80 26 72 80 27 0 0 +1 LPG Shunter ALP Total 272 25 424 899 250 22 358 809 22 03 66 90 4 CREW LOBBY Crew lobbies are located at JP, FL & BKI. Also 9 staff are based at SIKR, which are booked by SS/SIKR. Base Wise Staff Strength Of Running Staff is as follows: SN Lobby 1 2 3 4 5 JP FL BKI SIKR RE Total Sanctioned strength 224 415 207 09 44 899 Strength on roll 210 363 194 08 34 809 Vacancy 14 52 13 01 10 90 The crew beat of staff of various lobbies are as follows: SN Base 1 JP 2 FL 3 Coaching Beats JP-DLI-NDLS, JP-AII-ABR JP-SWM-KTT JP-AF JP-BKN JP-CUR,JP-LHUFL-RE-DLI-DEE FL-AII FL-SWM, BKI BKI-RE, BKI-TDL-AF BKI-JP-AII, SIKR - RE - 4 5 5. Goods Beats JP-BKI-RE-JP JP-SWM-JP JP-FL-JP JP-SIKR-CUR-JP JP-SIKR –LHU-JP FL-MJ-FL FL-SWM-FL FL-BKI-FL FL-RGS-RE-FL BKI-FL-BKI BKI-TDL-BKI BKI-RE-BKI BK-AWRI-MTJ-BKI RE-MTJ-RE BKI-AH-MTJ-BKI RE-FL (RPC) JP-SIKR-JP SIKR- LHU-SIKR SIKR-CUR-SIKR RE-AWER-MTJ-RE RE-BKI-RE RE-SSB-RE Controlled by SSE/L/JP (Vacant since 15.04.10) SSE/L/FL SSE/L/BKI SS/SIKR SS/RE RUNNING ROOM There are Four running rooms for Running staff which are controlled by Mechanical (Power) branch. These are located at JP,FL RE & LHU. Location No of beds Category JP FL RE LHU 66 58 78 20 A A A C Average occupancy per day 83 53 72 14 Controlled by SSE/L/JP CCCR/FL CCR/RE CCR/LHU 6. RAILWAY DIESEL INSTALATION Railway Diesel installation are situated at JP ,FL and RE. All RDI’s are provided with the road decanting facility. Also , one RDI has been started at BKI temporarily. Location of RDI JP FL RE 7. No of tank 04 11 04 Position of tank & capacity in KL Horizontals-03x70=210 Vertical-01x400=400 Total Decanting Capacity Place Points 610 KL 03 Platform Vertical-05x250 =1250 Under Ground6x70=420 Vertical-01x240=240 Under Ground3x70=210 No of fueling point 18 Average issue (daily) 85 KL 1670 KL Road-04 Rail-48 29 135KL 450 KL 4 Rd.Pt. 36 58 KL CREW MANAGEMENT SYSTEM (CMS) Crew management system is functioning properly at JP,FL & BKI. SN 1 2 3 4 5 Lobby JP FL BKI Rewari Lohuru Category A A A Date of commissioning 30.01.08 14.02.08 26.02.08 % of booking 100 100 100 100 100