MECHANICAL (POWER)

advertisement
MECHANICAL (POWER)
1.
ORGANITION
Mechanical Loco Department is headed by Sr. DME (POWER). Assisted by ADME/P.
 There are 3 integrated crew lobbies at JP,BKI and FL
 .All crew lobbies are provided with CMS facility.
 There are 3 RDI’s at JP, FL and RE..
 There are 4 Running rooms ‘A’ category running rooms at JP, FL, RE and ‘C’
category at LHU.
2.
STAFF STRENGTH
SN
1
Category
Running staff
Maintenance
staff
Total
2
3.
Sanctioned
strength
899
Staff on roll
Vacancy
809
90
240
209
31
1139
1018
121
CATEGORY WISE POSITION OF RUNNING STAFF
Category
SS
On roll
Vac.
LPM
LPP
CCR/PCR
72
80
26
72
80
27
0
0
+1
LPG
Shunter
ALP
Total
272
25
424
899
250
22
358
809
22
03
66
90
4
CREW LOBBY
Crew lobbies are located at JP, FL & BKI. Also 9 staff are based at SIKR, which are
booked by SS/SIKR.
Base Wise Staff Strength Of Running Staff is as follows:
SN
Lobby
1
2
3
4
5
JP
FL
BKI
SIKR
RE
Total
Sanctioned
strength
224
415
207
09
44
899
Strength on
roll
210
363
194
08
34
809
Vacancy
14
52
13
01
10
90
The crew beat of staff of various lobbies are as follows:
SN
Base
1
JP
2
FL
3
Coaching Beats
JP-DLI-NDLS,
JP-AII-ABR
JP-SWM-KTT
JP-AF
JP-BKN
JP-CUR,JP-LHUFL-RE-DLI-DEE
FL-AII
FL-SWM,
BKI
BKI-RE,
BKI-TDL-AF
BKI-JP-AII,
SIKR
-
RE
-
4
5
5.
Goods Beats
JP-BKI-RE-JP
JP-SWM-JP
JP-FL-JP
JP-SIKR-CUR-JP
JP-SIKR –LHU-JP
FL-MJ-FL
FL-SWM-FL
FL-BKI-FL
FL-RGS-RE-FL
BKI-FL-BKI
BKI-TDL-BKI
BKI-RE-BKI
BK-AWRI-MTJ-BKI
RE-MTJ-RE
BKI-AH-MTJ-BKI
RE-FL (RPC)
JP-SIKR-JP
SIKR- LHU-SIKR
SIKR-CUR-SIKR
RE-AWER-MTJ-RE
RE-BKI-RE
RE-SSB-RE
Controlled by
SSE/L/JP
(Vacant since
15.04.10)
SSE/L/FL
SSE/L/BKI
SS/SIKR
SS/RE
RUNNING ROOM
There are Four running rooms for Running staff which are controlled by Mechanical
(Power) branch. These are located at JP,FL RE & LHU.
Location
No of beds
Category
JP
FL
RE
LHU
66
58
78
20
A
A
A
C
Average occupancy
per day
83
53
72
14
Controlled by
SSE/L/JP
CCCR/FL
CCR/RE
CCR/LHU
6.
RAILWAY DIESEL INSTALATION
Railway Diesel installation are situated at JP ,FL and RE. All RDI’s are provided with
the road decanting facility. Also , one RDI has been started at BKI temporarily.
Location
of RDI
JP
FL
RE
7.
No of
tank
04
11
04
Position of tank &
capacity in KL
Horizontals-03x70=210
Vertical-01x400=400
Total
Decanting
Capacity Place
Points
610 KL
03
Platform
Vertical-05x250 =1250
Under Ground6x70=420
Vertical-01x240=240
Under Ground3x70=210
No of
fueling
point
18
Average
issue
(daily)
85 KL
1670 KL
Road-04
Rail-48
29
135KL
450 KL
4 Rd.Pt.
36
58 KL
CREW MANAGEMENT SYSTEM (CMS)
Crew management system is functioning properly at JP,FL & BKI.
SN
1
2
3
4
5
Lobby
JP
FL
BKI
Rewari
Lohuru
Category
A
A
A
Date of commissioning
30.01.08
14.02.08
26.02.08
% of booking
100
100
100
100
100
Download