The Construction of multifunctional entertaining center (complex)

advertisement
PROJECT OUTLINE PROFILE
A. Project Opportunity Description
A1. Project name: The Construction of multifunctional entertaining center
(complex) in Logoisk district of Disneyland type
Short name:
The Construction of multifunctional entertaining center (complex) in Logoisk
district of Disneyland type
(a) Full name:
(b) Belarusian Disneyland (amusement) park
The Construction of multifunctional entertaining center (complex) in Logoisk
district of Disneyland type.
Summary description:
Amusement park of Disneyland type is a new kind of recreation, which provides not
only the communication with nature, active rest, but gives an opportunity of cultural
and educational development. The Park is planned to be the infrastructure which
includes attractions, scenes with Belarusian folk fairytales.
A2. Project Status:
Minsk Region Executive Committee has concluded Agreements with Belarusian
State Institute of city planning concerning the project documentation engineering.
The following objects are under engineering: 14.09 “General plan of Logoisk
tourism development”; 15.09 “General plan of aqua park and speed tram line
location in Logoisk.
2 variants of the general plans engineering were under consideration in competent
ministries. The first construction area is located on Dubrovskoe storage pond near
sport complex “Raubichi”, the second one is to the south of ski resort “Silichi”. The
first variant was adopted. The works on plan’s development has completed.
A3. Organizations involved and their roles (contact persons, telephone Nos., fax,
e-mail, Internet sites):
Ministry of sports and tourism of the Republic of Belarus, Ministry of Architecture
and Construction of the Republic of Belarus, Ministry of Culture of the Republic of
Belarus
A4. Project description:
Providing of infrastructure with park amusements, scenes with the participation of
Belarusian fairy-tails heroes, picturesque woodland and water storage. An
approximate area is 175 hectares. The park will comprise the following areas: active
rest (American mounts, aqua park, water entertainments, ghosts house, horror tower,
race circuit), central area and family recreation area (Entrance square, pavilion
“Future World”, pavilion “Our world - Galaxy”, the Main Square, Dinosaurs Park,
complex “Lake land”, the river of adventures, complex “Europe – our home”),
Children area (Flower city, Kashcey’s castle, Buyan Island, Saltan’s kingdom, elf
2
country), Adult recreation area (hotel complex, restaurants, cafés, casino, shops),
Administration area (Offices, personnel’s rooms, tourist companies), parking and
thoroughfare, engineer equipment.
A4a: The total cost of the project: 740 million dollars
A5. Background/history/general program, interrelated or similar projects
(c) Analogs of amusement parks abroad. The first Disneyland in the world in
California of 35 hectares (1955); Euro Disneyland, Asterisks in France,
Europe Park in Germany, Legoland in Denmark. 600 such parks in the
USA and above 200 in Europe.
A6. Environmental impact summary
None
A7. Possible obstacles / problems/ risk assessment
None
A8. Time period for project implementation and pay-back period (years)
Not defined
A9. Project’s branch
Culture, sports, tourism
B. Capital Cost Items (investment requirements for project)
B1. Project physical components
B2. Capital cost
740 million US dollars
TOTAL:
B3. Sub-projects by location
B4. Project cost
C. Capital Resources By Origin Available for Project Initiators (Owners, CoPartners, Sponsors etc.)
C1. Resources
ownership, etc)
(grants,
investments,
equity, C2. Amount
D. Required Financial Assistance, Financial Gaps
D1. Financial gaps, financial assistance required (loan, equity, etc.)
Building financing of a multiple uses area, hotel with a restaurant, health centre.
3
D2. Sources of finance
Capital investment
D3. Type of financial
D4. Amount
instrument
Direct
foreign
740 million US dollars
investment
D5. Names of financial institutions involved in project
E. Demand (users) and revenues
E1. Type of users (markets, volumes, prices, revenues, assessed profit/saving)
E2. Revenues
E3. Amount
F. Operating and Maintenance Costs
G. Net Income Value
G1. Net income and value (Revenues E2 less
operating costs F2)
G2. Amount
H. Project Information Source
H1. The form is completed by (surname, position):
Volovich Alexander – Main architecture of Minsk Region
H2. Organization (name and address):
Minsk Region Executive Committee
Minsk, Angelsa str. 4, 220030
H3. Tel./Fax/E-mail:
+375 (17) 200 62 32
H4. Date:
June 2010
H5. Project branch affiliation:
Minsk Region Executive Committee
Download