International Aviation and Space Salon MAKS K FORM Procedure for fulfillment of order of air-conditioning system for stand/chalet at International Aviation and Space Salon MAKS 2015 Customer (participant or contractor) submits for approval by Technical Services Sales Department: - 3D design for chalet/stand construction; - schematics of chalet/stand with indication of zones and rooms in need of air conditioning and a desired point/location for installation of internal air conditioning units (for chalet No. 1D, 2D, 1F, 2F, 2G, 3G, 4G, 5G) with specified connections to elements of construction or axes of the building; - dimensions (height and thickness) of partition walls, information about their material (sandwich panel, particleboard, fiberboard, etc.), ceiling in the premises; - chalet construction plan with indication of a point/location for installation of diffusers of air conditioning systems and input ventilation systems (for chalet No. 1G, 6G) with specific connections to elements of construction or axes of the building; Recommended refrigerating power for 1 m3 of air is 70 Watt. It is prohibited to carry out independent installation of split systems in chalet and exhibition halls. It is prohibited to carry out independent dismantling of installed equipment. It is prohibited to place electrical appliances and audio/video equipment under internal air conditioning units. For damage or loss of equipment or materials, the Customer shall pay a fine to the Contractor in the amount of 75% of the cost of works. Information on air conditioning system Company name (Customer) _______________________________________________________ Chalet No.___________ Specify your desired type of air conditioning (for chalet No. 1D, 2D, 1F, 2F, 2G, 3G, 4G, 5G) - Portable air conditioner 3.5 kW* __________________ - Split system 2.5 kW ___________________________ - Split system 3.5 kW ___________________________ - Column air conditioner 12 kW _____________________ * A portable air conditioner is installed without bringing wires outside. Specify the type of heat-generating equipment you plan to use (kitchen equipment, spotlight, powerful lamps, monitors, other equipment_________________________________________________________); Will there be an opening between the wall and constructed structure for laying of communication lines, including piping for condensate drain? _________________________________________________________________ Is there a possibility for condensate drain outside (what side of the street) or is it necessary to lead the drainage pipe into the sewage system?___________________________________________________________________________ Is there a schedule for mounting of the inner structure? If not, when will it be available? _________________________________________________________________________________________ Anticipated time of mounting works in the premises. Is it possible to work early in the morning or in the evening? _________________________________________________________________________________________ Air-delivery conditioning system and input ventilation system are used in chalet 1G and 6G. Please specify the number of air conditioning outlets____________. Please specify preferable dates for installation of air conditioning system: ___________________________________. Person in charge of installation and safety (name, position, telephone) _______________________________________________________________________________________ Cost of approval of air conditioning system, per 1 stand/chalet - 5,000 rubles (exclusive of VAT 18%) I have read the procedure for fulfillment of the order of air conditioning system and agree with it. APPROVED Signature of CEO __________________________ ______________________ /_____________/ of the company (customer) seal