Objective Since becoming a Verizon employee in 1996 and becoming a Verizon Outside plant engineer. I have had experience in underground conduit construction, maintenance and design. I have worked with many underground specialists in the past 16 yrs. John Walsh is one of the Underground specialists I count on to get Verizon’s underground structure planned, designed and constructed on time and on budget.. We worked together for many years from Forked River to Cape May. Experience Buried residential plant experience New buried development construction provisioning including small conduit and small utility access holes. Precise has experience working in cramped right of way and small easement installation were placement of underground facilities is critical to avoid conflicts with other utilities working in the area. Precise was responsible for maintaining and repairing underground conduit and direct buried cable in preexisting developments. Precise has great knowledge of buried developments and the plant equipment installed in them over the yearsPrecise can have a solution back to a conflict or damage by close of business the same day. This is a great asset to management were communication between the office and field staff is critical to maintain customer loyalty and keep all involved parties with accurate information. Page 2 Barnegat buried working in close proximity to other utilities Under ground vaults and conduit installations Error! Reference source not found. Precise has experience working all types of roads. Including private, township, county and state roadways. Construction of feeder conduit on state highways these are large-scale conduit structures. They often have more then 20-conduit terminating into large underground vaults. These underground conduits contain many different materials over the past 60 years of construction. Precise had great success working with state officials providing service conduit and installing large-scale conduit construction on us highway nine, and the Garden State Parkway, AC express way, Ac Airport entrance road to name a few. Exit 67 overpass construction Page 3 Ocean County in the past few years has reconstructed Lacey Road, Forked River and West Bay Ave, Barnegat. On Lacey road, John was able to save or existing conduits by lowering an existing vault and making field modifications to the existing utility access holes, and conduit systems in the county right of way. This eliminated to need to place additional copper underground cables and saved Verizon over a million dollars of plant augmentations. On Bay Ave John was instrumental in the relocation of lighthouse drive and the new overpass installed at exit 67. John was covering many county jobs under construction with sensitive construction schedules. John is budget sensitive. He knows how to juggle both the county concerns and Verizon tight budget constraints. Page 4 West bay Ave reconstruction Sea breeze at Lacey Verizon vault installation Page 5 Directional Drilling and Boring. FAA Airport Circle reconstruction Error! Reference source not found. It was necessary to bore deep to avoid conflict with gas in the area of Delilah Road and Tilton Road. Two under ground vaults were maintained with out relocation. Two small utility access holes were installed. FAA old NAFAC Circle West Bay Ave at Mirage Blvd. This county road way was drilled to avoid conflicts with a 230v Ac power line. John scheduled with Atlantic City Electric, JCP&L, Mignati Inc. , Barnegat, and Ocean county on this project. This intersection is the entrance to over Page 6 1000 homes in Barnegat. Coordination with multiple organizations was critical to avoid conflicts with existing utilities.. West bay Ave at Cloverdale road reconstruction