Media release FROM THE OFFICE OF THE SECRETARY 13 November 2014 RELEASE OF COSTING OF ELECTION COMMITMENT Pursuant to section 6.45 of the 2014 Guidelines on the Caretaker Conventions the Department of Treasury and Finance (DTF) today released the costing of the following election commitment of the Liberal National Coalition Party of Victoria: Coalition 018 – Country Roads and Bridges program The election policy costing was completed in accordance with DTF’s Guidelines for managing requests from a political party for costing of its own policies (the policy costing guidelines) available at: www.dtf.vic.gov.au/election2014. The completed costing is attached to this media release. David Martine Secretary Department of Treasury and Finance Consistent with the DTF policy costing guidelines, the contact for Parties requesting DTF costings is: Mr Ismo Rama Telephone: 9651 5368 Email: ismo.rama@dtf.vic.gov.au For media inquiries please contact: Mr Bruce Atherton Telephone: 0404 097 654 Email: bruce.atherton@dtf.vic.gov.au Department of Treasury and Finance 1 Treasury Place Melbourne Victoria 3002 Ph: +61 3 9651 5111 Fax: +61 3 9651 2062 Website: dtf.vic.gov.au Election 2014 – Policy costing Title: Country Roads and Bridges Program Party making the request Name of policy Description of policy Date of public release of policy Date of receipt of request Additional information requested (including date) Additional information received (including date) Costing methodology used: scope of initiative; costing techniques; Coalition Country Roads and Bridges Program Continue support for local country road improvements with grants for Victoria’s 40 rural shires ($4 million each) to rehabilitate or replace bridges and repair or upgrade local roads. Funding will assist rural shires to ‘catch up’ with their infrastructure backlog. 23 October 2014 10 November 2014 NA NA The media release for this proposal states that $4 million will be provided over four years to each of Victoria’s 40 rural shires, totalling $160 million. policy parameters; statistical data used; and behavioural assumptions used (as appropriate). The cost of the proposed output initiative for the forward estimates period is set out below: 2014-15 ($ million) DTF costing of output initiative 2015-16 ($ million) 2016-17 ($ million) 40.0 40.0 Four year total (2014-15 to 2017-18 2017-18) ($ million) ($ million) 40.0 120.0 The Coalition has included an estimate for 2018-19 of $40.0 million. DTF has undertaken a costing of this figure and considers $40.0 million to be a reasonable estimate for 2018-19 and notes that this would bring the total estimated cost of the proposal to $160.0 million over five years. DTF comments section Where relevant, includes separate identification of revenue, expense, asset and liability components. Where appropriate, includes range for the costing or sensitivity analysis. Caveats or qualifications to the costing. Associated material: Copy of request as received by DTF and any additional information requested by DTF from party. Costs are all output costs. NA NA NA Title: Country Roads and Bridges Program 1