MAGTAP 18 Month PP-rev08-Nov 82632 Procurement Plan I. 1. 2013 General Project information: Country: Mozambique Borrower: Government of Mozambique Project Name: Mining and Gas Technical Assistance Project (MAGTAP) Loan/Credit No.: 5199-MZ - Project ID P129847 Project Implementing Agency: Ministry of Mineral Resources (Project Management - PMU) 3. 3. 4. Bank’s approval Date of the procurement Plan: November, 2013 Date of General Procurement Notice: 30 of September, 2013 Date of Procurement Plan Updated: November, 2013 Period covered by this procurement plan: 18 months from June 2013 – December 2014 II. Goods and Works and non-consulting services. 2. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement. Procurement Method Prior Review Threshold Comments ICB and LIB (Goods) NCB (Goods and Nonconsultant Services) > USD 500,000 3 Shopping (Goods) < USD 50,000 3. ICB (Works) N/A 4. NCB (Works) < USD 500, 000 5. Shoping (Works) < USD 50,000 All First two contracts will be subject to prior review by the bank First two contracts will be subject to prior review by the bank N/A First two contracts will be subject to prior review by the bank First two contracts will be subject to prior review by the bank 1. 2. < USD 500,000 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Reference to (if any) Project Operational/Procurement Manual: A Project Implementation Manual covering both Financial Operations and Procurement and other procedures has been presented by MIREM and approved by the WB as per the requirements for project effectiveness. 4. Any Other Special Procurement Arrangements: N/A 5. Procurement Packages with Methods and Time Schedule 1 MAGTAP 18 Month PP-rev08-Nov 1 Ref. No. 4 Procuremen t Method 5 Prequalifi cation (yes/no) 6 Dome stic Prefe rence (yes/n o) 7 Review by Bank (Prior/Post) 8 Expected BidOpening Date Equipment to support mining cadastre Equipment for ASM departments Geophysical & field surveying equipment Coreshed & related equipment ICB No No Prior Jun-14 ICB No No Prior Jun-14 ICB No No Prior Ago-14 ICB No No Prior Nov-14 G5 - B2.1 Equipment for provincial INP offices NCB No No Post Nov-14 G6-B2.2 IT infrastructure for INP NCB No No Post Apr-14 G7-B3.3 IT infrastructure for ENH ICB No No Prior Feb-14 G8-C2.3 Equipment to general inspectorate & provincial offices ICB No No Prior Ago-14 G9-C4.3 IT & physical infrastructure for MIREM Equipment for environmental monitoring Vehicles & motorbikes ICB No No Prior Jun-14 ICB No No Prior Ago-14 ICB No No Prior Mar-14 IT Equipment for PMU Shopping No No Post Apr-14 G13 – E IT Network for PMU Shopping No No Post Apr-14 G13 – E Office and furniture & Equipment ENH Seismic data Interpretation Software License renewal Shopping No No Post Nov-13 DC No No Prior Nov-13 Non-Consultant Services NC1- A5.1 Geological mapping & geochemical surveying ICB No No Prior Jun-14 NC2-A5.1 ICB No No Prior Dec-13 Shopping No No Post Oct-13 Goods G1 - A1.5 G2 – A3.4 G3 – A5.2 G4 – A5.6 G10-C6.5 G11 – A3.4/C2.3 /B2.1/E G12 – E G14B3.3(iv) NC3-E 2 Contract (Description) Airborne geophysical survey Project Website Design and Implementation 3 Estimated Cost (USD) 2013 9 Comments Office construction not started yet Office construction started/2013 Office construction comp Nov/2013 Subject to moving office Under Evaluation 2 MAGTAP 18 Month PP-rev08-Nov 2013 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Procurement Method 1. 2. 3 Competitive Method (Firms) Single Source (Firms & Individual Consultant) Individual Consultant Prior Review Threshold (US$) Comments 200,000 ALL 100,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $200,000equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Consultancy Assignments with Selection Methods and Time Schedule 1 Ref. No. 2 Description of Assignment C1 -A1.1 Update Cadastral Procedures Technical Assistance to provincial cadastre offices ASM advisory services and preparation of handbooks for ASMs' good practice Supervision of Geoscientific Infrastructure Development Programme Review of EMEM Mandate on Mining Concession Transaction advisory services for mining & related infrastructure Geological and Geophysical/ GIS data management and interpretation Financial/technical evaluation of LNG Area 1 and legal support Development of Business Plan for ENH Logistics Transaction advisory services for gas & related infrastructure Legal support to MIREM Technical assistance/capacity building of the planning & economics directorate (resident advisor) Communications strategy Strategic Environmental and Social Assessment Regulations for involuntary resettlement & community support Resettlement guidelines for mining and gas (by MIREM Environment Unit) C2 - A1.3 C3 – A3.2 C4 –A5.1 C5 – A6 C6 – A7 C7 – B2.4 C8-B3.1& B3.2 C9-B3.4 C10-B4 C11 -C1.2 C12-C3.1 C13-C3.2 C14 - C6.1 C15-C6.2 C16 – C6.3 3 Estimate d Cost (USD) 4 Selecti on Method 5 Review by Bank (Prior/Post) 6 Expected Proposals Submissio n Date IC QCBS Prior Prior Mar-14 April-14 QCBS Prior Feb-14 QCBS Prior Dec-13 IC Post Feb-14 QCBS Prior Jul-14 QCBS Prior Jul-14 QCBS Prior Feb-14 QCBS Prior Mar-14 QCBS Prior - QCBS QCBS Prior Prior Mar-14 Mar-14 IC QCBS Prior Prior Nov-13 Dec-13 QCBS Prior Apr-14 IC Prior Jun-14 7 Comments Completed 3 MAGTAP 18 Month PP-rev08-Nov C17-D3.1 C18-E C19-E C20-E C21-E C22-E C23-E C24-E C25-E C26-E C27-B1 C28B2.4(i) C29B3.1/B3.2 C30B3.3(iii) C31-B3.4 C32-C4.3 C33-A7 C34-E C35-E Identification of gaps and recommendation of actions for oil spill preparedness and response Project coordinator Procurement Consultant Financial Management Consultant Procurement Consultant-II Procurement Assistant Accounting Assistant Environmental consultant Social Consultant Extractive Industries taxation specialist Mozambique Gas Master Plan – 3rd Contract Review & Evaluation of LNG Project Development Plan (INP) Financial Advisory Services for ENH LNG Project-Initial phase ENH-LNG Marketing Advisory Preparation of Scope for Assistance to ENH Logistics Design IT Infrastructure for MIREM Review of Tantalum Project Deputy Mining Coordinator Deputy Gas Coordinator IC Prior Jun-14 IC IC IC SSS IC IC IC IC IC SS Prior Prior Prior Prior Prior Prior Post Post Post Prior Mar-14 Mar-14 Mar-14 Aug-13 CQS Prior Dec-13 IC Prior Dec-13 IC Prior Dec-13 IC Prior Dec-13 IC IC IC IC Prior Prior Prior Prior Dec-13 Dec-13 Jan-14 Jan-14 2013 Completed Completed Completed Completed Completed Completed Completed 4