On motion of Mr. Spears, seconded by Mr. Roberts, the following resolution was offered as amended: RESOLUTION NO. 126163 A resolution authorizing and approving the execution of Change Order No. 2 (Final) to the contract with A NEW Rock Co., Inc. for the Jefferson Parish Sanitary Landfill Phase 3B Final Cover, Drainage and Service Road, Project No. 2014-028-ENV Contract No. 55-00014829, M.O.B. 4642, Page 441, Instrument Number 11507526 for additional work performed by the Contractor for an increase of $249,225.88 to the contract price, thereby increasing the amended contract price from $911,588.63 to $1,160,814.51, representing a 27.3% increase in the amended contract amount. The cumulative total of Change Orders No. 1 and 2 represent a 48.3% increase in the original contract amount, from $782,970.88 to $1,160,814.51, under Proposal No. 50-111456. Change Order No. 2 (Final) also provides an extension of twenty-one (21) calendar days to the contract term, with a new end date of December 12, 2015. (Council District 3) WHEREAS, the Council has engaged the services of A NEW Rock Co., Inc. for the Jefferson Parish Sanitary Landfill Phase 3B Final Cover, Drainage and Service Road, Project No. 2014-028-ENV, Contract No. 55-00014829; and WHEREAS, the original contract was recorded with the Clerk of Court in and for the Parish of Jefferson M.O.B. 4642, Page 441, Instrument Number 11507526; and WHEREAS, Change Order No. 1 which increased the contract amount from $782,970.75 to $911,588.63 was authorized by Resolution No. 125502 adopted on August 26, 2015; and WHEREAS, Resolution No. 125975 adopted on November 4, 2015 granted substantial completion to A N.E.W. Rock Co., Inc.; and WHEREAS, all items cited on the punch list provided by GreenPoint Engineering, LLC have been completed; and WHEREAS, work on this project has been completed and a final balancing change order is required to adjust plan quantities to final field measured quantities and to provide for several unforeseen items; and WHEREAS, a change to the cost of the contract for additional work necessary to complete the original scope including (1) placement of additional soil required to compensate for unexpected settlement of the landfill, and to cover 48 newly installed gas well heads and a gas header pipe all of which was under construction during the design of this project; (2) removal of unexpected debris found in the final cover installed by previous landfill operator; (3) installation of an additional drainage outfall and culverts in ditches necessitated by the final as-builts for the gas collection system installed by another contractor during the design of this project; (4) excavation and backfilling soil and additional work to accommodate the geomembrane repairs and installation of an unplanned horizontal gas collection pipe being performed by another contractor; (5) modifications to the drainage improvements as a result of the current landfill operator removing and replacing a leachate force main; and (5) installation of a waterline and fire hydrant concurrent with drainage ditch improvements and road repair work. WHEREAS, Change Order 2 increases the contract amount by $249,225.88, thereby increasing the contract price from $911,588.63 to $1,160,814.51, representing a 27.3% increase in the amended contract amount, and extends the contract time by twenty-one (21) calendar days with a new contract end date of December 12, 2015; and WHEREAS, the Council has engaged the services of GreenPoint Engineering to perform the engineering services; and WHEREAS, the Engineer’s letter recommending Change Order No. 2 is attached. NOW, THEREFORE, BE IT RESOLVED by the Jefferson Parish Council of Jefferson Parish, Louisiana acting as governing authority of said Parish: SECTION 1. That the Council does hereby authorize and approve the execution of Change Order No. 2 (Final) to the contract with of A NEW Rock Co., Inc. for the Jefferson Parish Sanitary Landfill Phase 3B Final Cover, Drainage and Service Road, Project No. 2014-028-ENV, Contract No. 55-00014829, M.O.B. 4642, Page 441, Instrument Number 11507526 for work performed by the Contractor for an increase of $249,225.88 to the contract price, thereby increasing the amended contract price from $911,588.63 to $1,160,814.51, representing a 27.3% increase in the amended contract amount. The cumulative total of Change Orders No. 1 and 2 represent a 48.3% increase in the original contract amount, from $782,970.88 to $1,160,814.51, under Proposal No. 50-111456. Change Order No. 2 (Final) also provides an extension of twenty-one (21) calendar days to the contract term, with a new end date of December 12, 2015. SECTION 2. That the $249,225.88 increase in cost of the services is to be charged to Account No. 45900-4051-7454 (59010.040), Contract No. 55-00014829, for an increase in the contract amount from $911,588.63 to $1,160,814.51. SECTION 3. That new date for final completion would be December 12, 2015. SECTION 4. That the Council Chair or, in his absence, the Vice-Chair, be and is hereby authorized to sign and approve any and all documents required to carry out the provisions of this resolution. The foregoing resolution having been submitted to a vote, the vote thereon was as follows: YEAS: 7 NAYS: None ABSENT: None The resolution was declared to be adopted on this the 9th day of December, 2015. 2