SITE INVESTMENT PROFILE 1. General information Region: Astrakhan Oblast Administration address: 10 Tsentralnaya Str., Narimanov, Narimanovsky District Website: anarimanow@mail.ru Contact name: Position: Tel.: Fax: E-mail: Muslim Kairgalievich Akmeshev Deputy Head on the District Property Issues, Head of the Department for Land and Property Relations of the administration of “Narimanovsky District” municipal entity 8(85171) 70228 kumi030@mail.ru 2. Land Plot Details 2.1. Location (a map of the cite surroundings is attached) Astrakhan region, Narimanovsky District, within the borders of the municipal entity “City of Narimanov”, 1.5km to the south-west from Narimanov. 2.2. Site name Medicine Production Enterprise 2.3. Area, ha 20 ha 2.4. Shape and dimensions of the plot (a plan of the land plot is attached) 517.0 х 387.0 m 2.5. Expansibility possible 2.6. Maximum level difference, m from 3 m 2.7. Drilling data and groundwater level, m (a geological report is attached) no data 2.8. Permit for the well-drilling (for the potable water supply) no permit 2.9. State of the ground and soil (reports on state of the ground and soil are attached) Foundation requirements formed by a plot (is the pile foundation necessary?) It depends on type and sort of buildings and facilities Maximum possible load capacity Soil and ground water contamination level 2.10. Plot topography (topographical survey is attached) 2.11. Land-use recommendation 2.12. Neighboring industrial enterprises and dwelling area, sanitary protection areas available Are there any land-use and development recommendations for the plot? Is there any general plan of the inhabited locality where the site is situated? Neighboring industrial enterprises, industries and dimensions of sanitary protection areas in the range of 502,000 m from the site Compliance with the Sanitary Rules and Regulations 2.2.1/2.1.1.1200-03 s.5.2 Are there any requirements for a minimum greenbelt? Industrial production planned in the range of 2,000m from the plot The nearest dwelling area and any anticipated related restrictions Possibility of objections/claims from the local citizens Any restrictions related to vicinity of public facilities Yes Yes (it is necessary to make changes in the general plan and land –use and development rules) No Yes Yes possible city of Narimanov; no restrictions no no 3. Transport infrastructure 3.1. Distance from the plot Distance to the nearest railway station (station name and code), railway approach lines Distance to an international airport (regular international passenger traffic) Distance to an airport (charter and freight traffic) Distance to a federal highway Distance to a road of region significance Distance to a public road 3.5km, railway OJSC “Lotos Ship-Building Yard” 60 km 60 km 1.5 km no 150 m Distance to the nearest major urban area, the urban area population Presence of public transport Distance to a customs station (customs station, address) 1.5 km. Narimanov (11, 321 inhabitants) Yes 50 km Distance to a customs warehouse (name, address) Distance to public warehouses (grades A, B+) Distance to a police station Distance to a fire station 1.5 km 2.5 km Distance to a fire extinction basin Distance to a medical institution (24hour emergency aid, hospitalization capacity) 3.2. Motor Transport Access Direct access to a public road from the plot Adjacent road details (width, covering, number of lanes, state) Owner of a adjacent road 2 km 1.6 km. Public Institution of the Astrakhan Oblast “Narimanovskaya Central District Hospital” Yes 7.5 m wide, two lanes, in a satisfactory state City of Narimanov Possible restrictions for access to a adjacent road, necessity to get a permit no Seasonal restrictions for traffic of heavy-duty vehicles in the region. What are these restrictions? There are restrictions during the flood period Season restrictions for traffic of heavy goods vehicles from the region to Moscow. What are these restrictions? Any other prohibitive rules for lorry traffic There are restrictions during the flood period no information 4. Communications Supplier company 4.1. Power supply Technical capacities, desired operations and periods of their performance Terminal point description, power delivered, distance to the plot border Municipal Unitary Enterprise “Electrical Networks” of the “Narimanov” municipal entity there are technical capacities, operations are performed according to the technical requirements Substation “Zavodskaya” 110/10 kW, power of 2 transformers of 50 MW, free capacity is 15 MW Cost of operations for power delivery to the plot (preliminary estimation) Cost of one power unit connection Consumption cost (tariff for juridical persons) Reserving of extra power Cost of extra power reserving 4.2. Gas Supply if the technical documentation of the site under construction is available for less than 15 kW the cost is 550 roubles; for more than 15 kW the calculation is carried out by the Tariff Service of the Astrakhan region 4.5 roubles possible The cost is defined by the Tariff Service of the Astrakhan region Supplier company Gas networks owning company Technical capacities, desired operations and periods of their performance Terminal point description, distance to the plot border Cost of operations for line connection to the plot (preliminary estimation) OJSC “Astrakhanoblgaz” OJSC “Astrakhanoblgaz” available 0.3 km information will be given later Cost of one unit line connection information will be given later Consumption cost (tariff for juridical persons) 4.3. Water supply (potable and industrial) Supplier company Technical capacities, desired operations and periods of their performance Distance from a water line to the plot border Cost of operations on junction to the actual pipeline of water supply (preliminary estimation) Cost of one unit line connection information will be given later Municipal Unitary Enterprise “Vodokanal” of the municipal entity “Narimanov” there are technical capacities; pipeline overhaul, improvement of wastewater treatment about 0.3 km 1,500 thousand roubles Consumption cost 20.43 roubles for 1m3 inc. VAT Water analysis data available Drilling of one’s own well and terms of obtaining permit 4.4. Sewage (household and industrial) Supplier company Technical capacities, desired operations and periods of their performance Municipal Unitary Enterprise “Vodokanal” of the municipal entity “Narimanov” there are technical capacities; improvement of the main sewage pumping station and sewage treatment facilities Distance from a place of wastewater discharge lime to the plot border Cost of operations on junction to the actual water disposal pipeline Usage cost What are requirements for the wastewater utilization? Utilization system for solid wastes Distance from the plot borders to the utilization system for solid wastes Utilization system for pharmaceutical and chemical wastes Distance from the plot borders to the utilization system for pharmaceutical and chemical wastes 4.5. Storm-water drainage Supplier company about 2.5km 800 thousand roubles 32.68 for 1m3 inc. VAT preliminary purification in local sewage treatment facilities up to maximum permissible concentrations for discharge to the municipal sewage available 35km no Non-available Technical capacities, desired operations and periods of their performance Cost of one unit connection Usage cost Necessity of dewatering 4.6. Telephone service and telecommunication network Distance from the plot borders 500 m Number of currently available lines Connection of an extra line Internet Mobile communications, provider possible access to the networks of Internet broadband connection and data communication: CJSC “Astrakhan GSM”, OJSC “Megafon”, LLC “Real”, CJSC “Astrakhan Digital Television”, OJSC “Rostelecom” Coverage with cellular communication networks of OJSC “Megafon”, OJSC “VimpelCom”, CJSC “Astrakhan GSM”, OJSC “MTS” Mobile communication cost (tariff for a juridical person imposed by the provider) Depending on the chosen tariff and provider 5. Site exploitation history, possible restrictions 5.1. Site exploitation history The site has not been exploited 5.2. Current exploitation of the site The site is not exploited 5.3. Necessity of remediation no 5.4. Environmental restrictions no 5.5. Is the site located in areas 5.6. Smoke content and bad smell (permanent or depending on wind) 5.7. Objects to be moved/removed from the site attachment if the objects are present (a figure with objects/constructions to be dismantled indicated): of water use conservation (water protection zone)? of landscape conservation? no requiring special planting? no with high-value types of soil or species of beings/plants to be conserved? no with signs of natural mineral deposits? no no no High-voltage power lines no High-pressure gas pipes no Pipings no Buildings no Trees, bushes yes Other objects impeding free exploitation of the site no 5.9. Vicinity of potentially hazardous facilities Inhabited localities which were put in the list of areas with radiation pollution according to the Decree No 1582 dated December 15, 1997 (or other decrees) in a radius of 10 km Sources of radiation pollution in a radius of 5 km no no Incineration plants, city dumps, industrial dumps in a radius of 5 km yes, it will be eliminated Sewage collectors of localities with more than 50,000 inhabitants in a radius of 5km no Prisons and penal colonies in a radius of 1 km no Animal burials in a radius of 1 km no Blast furnaces or chemical plants with 1,000 and more workers within a radius of 3km no Other contaminating plants within a radius of 3km no 6. Business climate 6.1. Tax concession (period, volume of tax reduction, obtainment conditions) Corporate tax Property tax Land value tax Tax on vehicles Other taxes if applicable 6.2. Possible involvement into the investment project by way of other subsidies, preferences within the actual legislation Infrastructure construction possible Education and training of staff Other ways to support the project 7. Legal terms 7.1. Property, status Present owner of the land and facilities, if applicable municipal entity “Narimanovsky District” Was the plot registered as an industrial area? no Organization of a sanitary zone possible 7.2. Land category and type of permitted use (the plot development plan is attached) lands of inhabited localities 7.3. Any encumbrances No 7.4. Any third party claiming the potential plot no 7.5. Cadastral number (cadastral certificate is attached) no 7.6. Proposed method for the site acquisition, procedure 7.7. Cost of the land plot acquisition (accurate price, as far as it possible to be estimated) 8. Timeframe In accordance with articles 30, 31, 32 of the Land Code of the Russian Federation, a land plot for construction is submitted if the facility location has been preliminary approved. The registration of a land plot lease for construction lasts 6 months and consists of the following stages: - choice of a land plot (drawing up a statement of land plot choice and coordination with respective authorities and organizations); - stipulation of technical specifications; - public announcement about possible or coming facility construction; - decision on preliminary coordination of the facility location made by the district administration; - changes made in the documents of territory planning (general plan of the inhabited locality) ; - cadastral proceedings on the land plot, its state cadastral registration; - land plot recategorisation from agricultural lands to industrial lands; - decision on provision of the land plot for construction A land plot with legally registered buildings, facilities, constructions may be acquired as property in accordance with article 36 of the Land Code of the Russian Federation. Acquisition price is defined on the basis of the Decree of the Astrakhan Oblast government No 406-П dated September 27, 2012 and accounts for 20-fold rate of the land tax (1.5%) from the plot cadastral price. Cadastral price is defined on the stage of state cadastral registration of the land plot. 8.1. Time necessary to register the property rights depending on the proposed procedure (minimum and maximum) up to 8 months 8.2. Time necessary to obtain the plot cadastral number up to 2 months 8.3. Time necessary to recategorise a land plot (if applicable) up to 3 months 8.4. Time necessary to approve upon technical specifications up to 1 month 8.5. Time necessary to obtain construction permit within 10-day period upon presenting documents in accordance with article 51 of the Urban Planning Code of the Russian Federation 9. General information on the region 9.1. Territory, thousand km2 9.2. Population, inhabitants 9.3 General description of the labour resources Number of able-bodied population (2011) Unemployment rate 2010 2011 2012 Average wage of blue collars (2011) Average wage of experts and laboratory assistants of pharmacological plants (2011) Average salary of senior managers (2011) 9.4. Educational system Higher educational institutions with Chairs of Pharmacology (name, contact details, number of students) Vocational and basic-level professional educational institutions of healthcare and pharmacy (name, contact details, number of students) 9.5. Quality control and medicine certification in the region Presence of a laboratory for medicine quality control in the region. If there isn’t any, please specify the nearest one (name, contact details) Presence of a medical certification body. If there isn’t any, please specify the nearest one (name, contact details) 9.6. Foreign investors in the region Company Industry