I&TS HSW Management Sub-System 3.1-07FO3 General Permission to Work Form The purpose of this General Permission to Work (GPTW) is to ensure that adequate controls are implemented to protect the safety of persons conducting, or who may be in the vicinity of high-risk work being undertaken and to protect University property from damage. General Permission to Work (PTW) Number (UoA to complete) In the event of an Emergency, all GPTW’s are immediately suspended. All persons must assemble at the nearest nominated assembly point. The GPTW must be re–authorised (Signed) by the I&TS GPTW Issuer before work resumes. 1. CONTRACTOR DETAILS Company undertaking the work: Person undertaking the work & phone number: Supervisor name & phone number: Principal Contractor Company: Principal Contractor Contact name & phone number: 2. PROJECT DETAILS University Project / Job No. (if applicable): Location of Work: (inc. Campus/Building/Room: Planned Work Activity: Estimated Duration of the PTW: 3. Date from: Time: Date to: Time: WORK DETAILS Tick applicable boxes: ☐ Working at Heights > 3 metres ☐ Working on any de-energised electrical infrastructure, on, or upstream of a LV electrical distribution board (working on ANY live electrical infrastructure is strictly prohibited) ☐ Roof Access (inc EME equipment) ☐ Building Penetration >25mm ☐ Removal or disturbance of Asbestos ☐ Earth Penetration >300mm ☐ Work where high risk work licence is required by Legislation (Reg 81) ☐ Other ……………………………………………………… ☐ Isolation of Fire Indicator Panel 4. ie Boom-type EWP, scaffold, dogging & rigging, crane/hoists, forklift, pressure equipment operation (ie entering hazardous spaces) ISOLATIONS REQUIRED Isolation Forms Attached: (if applicable) ☐ Isolation of Essential Services (water, gas, electricity, mechanical, etc) Isolation of Fire Suppression Systems ☐ 5. GENERAL REQUIREMENTS FOR SWMS/JSA The person in direct control acknowledges that the items related to GPTW (below) have been considered and included in the attached SWMS/JSA. All items must be ticked or marked N/A ( or N/A): or or GENERAL INCLUSIONS: N/A N/A Company Details; name address and ABN Names of workers consulted in developing the SWMS/JSA Reference to relevant WHS Legislation, COPs and Standards Worker responsible for ensuring implementation, monitoring & compliance is identified Permits, licences and training is documented RISK & HAZARD IDENTIFICATION & CONTROL A Sign off sheet for workers Tasks are set out in a logical step-by-step sequence Risks and controls are clear and specific or N/A or N/A All task specific hazards are identified Working Outdoor risks (including weather) are identified Workers are able to add site specific hazards Site Access & Egress risks are identified Essential/fire services isolation needs are identified Environmental concerns are identified Plant and equipment to be used is identified Hazardous Chemicals to be used are identified Adequate controls & PPE are identified to eliminate or reduce the risk Adequate controls & PPE are identified to eliminate or reduce the risk Isolation Request form must be referenced as controls Pre start inspections & PPE must be referenced as controls Warning Authorised by Filepath Traffic management and PPE must be referenced as controls Site security and maintenance of disability access must be considered EPA compliant clean-up must be referenced as controls Safety Data Sheets and PPE must be referenced as controls This process is uncontrolled when printed. The current version is available on the I&TS Website. Director of Infrastructure & Chief Information Officer Document1 Effective Date: Review Date: January 2014 January 2019 Version: 2.0 Page: 1 of 3 I&TS HSW Management Sub-System 3.1-07FO3 General Permission to Work Form General Permission to Work (PTW) Number 6. (UoA to complete) WORK SPECIFIC REQUIREMENTS FOR SWMS/JSA COVERED BY THIS GPTW Complete the section that relates to the Work Details ticked in Section 3. All items (in the section) must be ticked or marked N/A ( or N/A): The person in direct control acknowledges that the items related to GPTW (below) have been undertaken and included in the attached SWMS/JSA. or or WORKING AT HEIGHTS >3 METRES N/A N/A Ladders, Elevated Work Platforms (EWP)and/or scaffolding complies System in place to prevent tools/equipment falling with relevant Standard Fall protection/arrest equipment identified and conforms to Rescue plan provided (required when fall arrest utilised) Standards/anchor points rated to 15kn identified or or ROOF ACCESS N/A N/A Roof Register sighted & Roof has been load tested/verified to support Regular communication between working party and weight (as applicable) nominated emergency contact. Where the Roof Register identifies EME (telecommunications or other Where the Roof Register identifies Unprotected roof edges, RF transmission) equipment, no-go zones are acknowledged holes and/or openings and steep or slippery surfaces, risk Where the Roof Register identifies Fume exhaust flues, risk is is assessed and controls are in place. Fall protection assessed and isolation has been arranged (which conform to Standard) & a system which prevents tools/equipment from falling are provided. Standby person Where the Roof Register identifies Fragile roof materials, risk is is provided and rescue plan is in place. assessed and controls are in place or or EARTH PENETRATION > 300MM N/A N/A Excavation secured from public access including All underground services located and marked inadvertent entry Nature of ground investigated (soil/rock, wet/dry etc) Atmospheric conditions considered Possibility of flooding reviewed (drain, run-off etc) Rescue plan provided where there is a risk of cave in Trenches >1.5m deep shored, shielded or benched to prevent cave in Spoil pile safely located (preferably on low side of excavation) Work arranged so persons do not work alone in trenches >1.5m deep, or where SWMS/JSA has second person as control measure ELECTRICAL INFRASTRUCTURE Trenches <1.5m – stability of excavation addressed or N/A Electrical infrastructure & associated hazards are identified including area clear of wet conditions, combustible and flammable materials Where required, written permission from SA Power Networks has been obtained/electrical network operator notified All conditions specified by SA Power Networks and the Technical Regulator are complied with For work on live circuits a risk assessment has been completed justifying the need for the work and there is a trained safety observer present at all times who is competent in low voltage rescue. BUILDING PENETRATION >25MM or N/A Where required a trained safety observer and communication system is in place Lock out/Tag out procedures are in place for isolation of affected plant & infrastructure The treatment of all cables as energised until positive tests are made which prove the cable is de-energised Identification of equipment downstream of isolation which could be effected ie essential machinery/research activities or N/A or N/A Penetration has been assessed for breakthrough risks/hazards, flooding and effect on structural conditions All services located and marked including communication services Asbestos Register sighted & local risks assessed or N/A ASBESTOS SafeWork SA approval & EPA disposal licences attached or N/A Asbestos removal control plan submitted and attached Notification regarding the removal of asbestos has been provided to staff, students and workers in the area. Class of asbestos removal has been determined Asbestos Register sighted & local risks assessed WORK WHERE HIGH RISK WORK LICENCE IS REQUIRED or N/A or N/A Level of High risk work licences required to perform task High risk work licences sighted SWL for lifting equipment is assessed & has current inspection Where required plant has a current registration Warning Authorised by Filepath This process is uncontrolled when printed. The current version is available on the I&TS Website. Director of Infrastructure & Chief Information Officer Document1 Effective Date: Review Date: January 2014 January 2019 Version: 2.0 Page: 2 of 3 I&TS HSW Management Sub-System 3.1-07FO3 General Permission to Work Form General Permission to Work (PTW) Number 7. (UoA to complete) GPTW REQUEST (GPTW Holder) ALL ITEMS MUST BE TICKED This acknowledgement signifies a formal request to commence activities involving one or more specified high-risk works. I request this GPTW be acknowledged and registered by the relevant University of Adelaide GPTW Issuer. As the person requesting this PTW, I hereby certify that: ☐ I have developed / reviewed the attached SWMS/JSA for the work covered by this GPTW. ☐ All work being undertaken covered by this GPTW meets the current South Australian WHS legislative requirements. ☐ I am competent to co-ordinate this work activity in accordance with the attached SWMS / JSA. I shall ensure that all persons required to carry out the work have: the relevant licences; attended the current University of Adelaide Contractor Induction; been consulted and understand the requirements of the SWMS / JSA and the GPTW. I shall implement all planned and necessary controls to ensure the health and safety of all persons who may be affected by the activities. ☐ ☐ ☐ I shall monitor the identified hazards and control strategies throughout the work activities. ☐ I have submitted this GPTW to the relevant PCBU/Principal Contractor to ensure that controls are adequate. GPTW Holder Name: 8. Date: Time: Signature: PRINCIPAL CONTRACTOR/ PCBU CONTRACTING THE WORK TO THE GPTW HOLDER ALL ITEMS MUST BE TICKED As the Principal Contractor (where someone other than the University has engaged the GPTW Holder)/ PCBU (where the University has engaged the GPTW Holder) commissioning the work, I have reviewed the attached SWMS/JSA (and kept a copy) for the work covered by this GPTW to ensure: ☐ Hazards and risks have been identified and adequate controls measures are implemented. ☐ Workers undertaking the work are trained and competent to undertake this work in accordance with the attached SWMS / JSA. ☐ All work being undertaken covered by this GPTW meets the current South Australian WHS legislative requirements. PCBU/Principal Contractor Rep: 9. Date: Time: Signature: I&TS GPTW ISSUER The above criteria have been addressed and the work is authorised to commence in accordance with the SWMS / JSA and identified control measures. As the I&TS Permit Issuer, I hereby acknowledge that: ☐√ I have allocated this GPTW a number and scanned to the GPTW register in the relevant area. ☐ For Asbestos work; The UoA Asbestos Consultant and the Branch/Faculty Manager of the affected/adjacent areas have been notified. GPTW Issuer UoA Date: Time: Signature: 10. CLOSE OUT As the GPTW Holder, I hereby acknowledge that: ☐ All Isolations have been removed and/or reinstated, all workers have vacated the space and the area has been left in a safe condition. ☐ All near miss/hazards/incidents have been reported. ☐ The PCBU/Principal Contractor has been informed that the work is complete and of the close out this GPTW. ☐ Asbestos Removal Documentation has been provided i.e. Air monitoring results/clearance certificate, transport and disposal certification. GPTW Holder Date: Time: Signature: As the GPTW Issuer, I authorise the closure of this GPTW and will scan it to the GPTW register in my area: GPTW Issuer Original – Retained by GPTW Holder Warning Authorised by Filepath Date: Time: Signature: Copy – Retained by GPTW Issuer This process is uncontrolled when printed. The current version is available on the I&TS Website. Director of Infrastructure & Chief Information Officer Document1 Effective Date: Review Date: January 2014 January 2019 Version: 2.0 Page: 3 of 3