Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds Topics Control of Asbestos Regulations 2012 RIDDOR Fee for Intervention Refurb’ Campaign – Feb/March 2012 Work plan 2012/13 Control of Asbestos Regulations 2012 • EU Directive on exposure to asbestos (Directive 2009/148/EC) • 6th April 2012 – What has stayed the same – What has changed • • • Notification April 2015 – health surveillance Enforcement expectation RIDDOR • • 6th April • The deadline by which the over-sevenday injury must be reported has also increased to 15 days from the day of the day of the accident. The trigger point has increased from over three days to over seven days incapacitation (not counting the day on which the accident happened). Fee For Intervention • Material breach –when, in the opinion of the HSE Inspector, there has been a contravention of health and safety law that requires them to notify the duty holder, in writing, of that opinion. • • £124 per hour * October 2012 ? Refurbishment campaign Inspection initiative 20th Feb to 16th March -Refurb’ & small sites No of sites visited – 132 (3237) No of Contractors seen – 175 (4080) No of notices issued – 27 (581) FFI dry run Issues -WAH, Fire Safety, Good Order, asbestos survey Work plan 2012/13 • Priority Areas – Asbestos – Small sites – Refurbishment – Major Projects – Timber Frame buildings – Temporary Demountable Structures