UNCLASSIFIED SWMS Taxonomy Breakout Pre-Decisional Information SWMS Taxonomy Groupings Group A* Multiple Award Full & Open Program Management Engineering and Technical Professional Services ~$404M ~ # of FTE: 398 Group B ~ % of Total Requirement 26.7% 10.7% 17.7% 55% The global scope, complexity, and dollar value of the expected work favors Full & Open competition vice a Small Business Set-Aside Multiple Award Business Set Aside Education & Training Admin & Other-Non SORDAC Management Support Services ~$259M Small ~ # of FTE: 248 Group C** ~ % of Total Requirement 16.3% 5.1% 13.8% 35% Industry input and market research indicate a Small Businesses SetAside will yield multiple offers from multiple quality vendors *Includes SORDAC Line PEO Acquisition Support: PEO-FW, PEO-RW, PEO-SW, PEOST, PEO-SR, PEO-M,PEO-C4 Single Award SDVOSB Set-Aside Engineering and Technical Management Support Services Professional Services ~ % of Total Requirement 0.3% 7.8% 0.3% Administrative Support 1.5% ~$ 71M 10% ~ # of FTE: 70 Set-aside for high OCI risk requirements improves overall competitive environment for Groups A & B; single award reduces B&P cost at the task order level. ** Includes SORDAC Acquisition Support-(OCI): PEO-SV, K, AS, AO, AC; and negligable PM support Taxonomy Grouping Totals (as a Percentage of FTE) UNCLASSIFIED SORDAC - SV SORDAC PEO-SV 1 UNCLASSIFIED SWMS Update Pre-Decisional Information Acquisition Strategy is on-going Acquisition will be satisfied with three solicitations with contract award to Large Businesses, Small Businesses, and Service Disabled Veteran Owned Small Businesses Draft solicitations: Group C posted Friday (4 Apr 14) and Groups A and B will be posted this week. Awards in April 2015 Competition of GBPS task orders to follow awardwhen the period of performance ends UNCLASSIFIED SORDAC - SV SORDAC PEO-SV