Health and Safety Executive 2013/14 Plan of Work Neil Stephens Current Position Originally final year of 3 year plan Plan extended by 1 year to align with HSE Business plan – 2014/15 = final year Priority sectors Small Sites (30%) – 37% delivered Refurbishment (25%) – 18% Asbestos (20%) – 19% Major Projects & Large Contractors Local Priorities 2013/14 Updates Priority sectors remain same Small Sites (increase to 35%) Refurbishment (25%) Asbestos (20%) Major Projects & Large Contractors Local Priorities Inspection initiative • • • Currently in last week of this year’s • • Excellent regional media coverage Delivered over 2176 inspections so far* Promoting – no change message on hard hats 2013/14 will take place in September 2013 2013/14 New Field Projects • Fragile Materials – Inspection by CD – Inspection FOD – Estates Excellence – Busy Builder (type) Sheet – CSkills videos – WWT SHADs – Ag SHADs – ORR – Research on human factor causes – Trade articles – Presentations (toolbox talk) 2013/14 field projects…….. • Fireplace Installation – VO led project • Tile Cutting (roof valley) – NRFC guidance • Health Risks in paving & block work – Noise – Havs – Silica • • Asbestos Removal in Retail Temp de-mountable structures and timber frame construction - continues Non - Field work examples • • • • • Clients Standard (or Charter) • COHME - revision Client Engagement on Nuclear Build/Estate H&S and BIM - guidance Lift installation and maintenance Dust partnership – Visualisations (Elvis) – On-tool extraction – Resolving Face fit testing