Neil Stephens
Current Position
Originally final year of 3 year plan
Plan extended by 1 year to align with HSE
Business plan – 2014/15 = final year
Priority sectors
Small Sites (30%) – 37% delivered
Refurbishment (25%) – 18%
Asbestos (20%) – 19%
Major Projects & Large Contractors
Local Priorities
2013/14 Updates
Priority sectors remain same
Small Sites (increase to 35%)
Refurbishment (25%)
Asbestos (20%)
Major Projects & Large Contractors
Local Priorities
Inspection initiative
•
•
•
Currently in last week of this year’s
•
•
Excellent regional media coverage
Delivered over 2176 inspections so far*
Promoting – no change message on hard
hats
2013/14 will take place in September 2013
2013/14 New Field Projects
•
Fragile Materials
– Inspection by
CD
– Inspection FOD
– Estates
Excellence
– Busy Builder
(type) Sheet
– CSkills videos
– WWT SHADs
– Ag SHADs
– ORR
– Research on
human factor
causes
– Trade articles
– Presentations
(toolbox talk)
2013/14 field projects……..
•
Fireplace Installation
– VO led project
•
Tile Cutting (roof valley)
– NRFC guidance
•
Health Risks in paving & block work
– Noise
– Havs
– Silica
•
•
Asbestos Removal in Retail
Temp de-mountable structures and timber frame
construction - continues
Non - Field work examples
•
•
•
•
•
Clients Standard (or Charter)
•
COHME - revision
Client Engagement on Nuclear Build/Estate
H&S and BIM - guidance
Lift installation and maintenance
Dust partnership
– Visualisations (Elvis)
– On-tool extraction
– Resolving Face fit testing