The first Ukrainian industrial park "Malinovka" www.malinovka.business 1 Malinovka Technopark is: Alcohol business based distillery "Prime" (Distillery Prime, trademarks, distribution network) Malinowka glass plant (MGP) Plant for the production of aluminum cap (KGS) Plant for the production of bio-ethanol (Bikorm) and feed additives Businesses represent a unique complex, making vertical integrable chain in the production of alcoholic beverages. ЛВЗ ПРАЙМ KGS 2 In order to develop industrial park there are investment programs: 1. Investors can placed any production on more than 10 000 sq meters, for example producing household appliances, auto parts, electronics – 3-5 mln. The payback period of 3 years 2. Construction of the 2nd line of the production of glass bottles. $48 million., The payback period of 6 years. 2. Construction of the 2nd part of the factory complex processing of grain to produce Bikorm 15 000 tonnes of bioethanol in $22 million., Payback of 4 years. 3. Construction of line for plastic caps at the factory KGS $15 million., Payback of 4 years. 4. Construction of modern greenhouses, which would use the heat from the processing of the glass factory. $25 million., Payback of 3 years. 5. Construction of cattle farm meat and dairy consumption profile for feed products factory Bikorm that arise in the production of bioethanol. $ 40 million, Payback 5-year. 6. Construction of a plant for the creation of canned vegetables and meat. $ 20 million, Payback 6 years. 3 The scheme of investment projects of Technopark "Malinovka" Prime, beveriges plant Malinovka Glass plant heat Bioetanol plant Bikorm 2d line 2d line of biofuel 48 mln $ 22 mln $ modern greenhouses 25 mln. $ Animal feed heat heat glass Cattle farm Plant for canned vegetables and meat 20 mln $ 40 mln $ 4 Animal feed aluminum cap plant KGS line for plastic caps 15 mln $ Prime Plant "Prime" was commissioned Oct. 28, 2006; area - 13 ha; 7 lines with capacity 71 thousand bottles per hour; The main shops - administrative building, water treatment plant, alcohol-vault blending shop, spill, container plant, material storage, two laboratories, warehouses, energy and mechanical shop, a distribution warehouse of finished products; Capacity alcohol cellar - 2,000,000 liters of alcohol; The volume of sewage treatment plants - 5000 m 3 capacity - 400 m 3 per day. . 5 Malinowski Glassworks Top-5 with a 7% market share in Ukraine The most modern glassworks in Ukraine with the latest equipment (Horn, Sarmet, Emhart, Teka, SGCC), including NNPB moldable machine The plant was built in 2007, "from scratch", has capacyty 240 tons per day Developed client base - the leading producers of alcoholic beverages and drinks in Ukraine and the CIS. Exports accounted for 10% of net sales in 2012 A wide range of products - a bottle of spirits and soft drinks, the bank. It is planned to start production of medical packaging and bottles of premium vodka segment Location in one of the most industrially developed regions of Ukraine with the availability of skilled personnel, and access to raw materials Total investment in the plant was - $ 90 million .. According to expert research minimum warranty period of the furnace without major repairs - until the end of 2018 6 Will win a KGS Sole fired plant in Ukraine producing an aluminum cap with a closed-cycle production of offset printing on the aluminum sheet to insert wads lining in the finished product. Built "from scratch" and put into operation in 2005 and its current capacity of 35 million units per month. Equipped with a high technologically advanced equipment from leading manufacturers (LTG Mailaender GmbH, PackSys Global) The plant produces aluminum screw caps for alcoholic beverages and low / non-alcoholic drinks of various sizes, including those with plastic inserts. Major markets - Russia and Ukraine (30%). 7 Plant Bikorm The most modern plant in Ukraine on complex processing of grain. By performing complex transformations on the plant from crops produced bioethanol, amylum, gluten, bran, protein Concentrates. The total investment sostavila42 million The plant is scheduled to start within 3 months. 8