I&C engineering

advertisement
2015
INSTRUMENTAION & CONTROL ENGINEER
SUMESH P SANKARAN
+971506967114
sumeshps32@gmail.com
Experience:
Total of eight and half years of experience as Instrumentation Engineer for total I&C engineering
(EPC) activities of the Project. This includes Design Support, Procurement, Erection and
Commissioning.
Skills:
Good interpersonal & presentation skills, Self starter and Strong team player. Ability to
communicate at all levels of the business and with a variety of cultures. Effective HSE implement &
high level maintain.
Employment Details
Current Employer
Project
Client
Consultant
Position
Reporting Authority
Work period
Notice Period
References
Job Responsibilities
Design Phase




















: POSCO ENGINEERING & CONSTRUCTIONS Co LTD Abu Dhabi
: G-5809 SWSR Project Liwa Abu Dhabi
: TRANSCO/EAD
: GIZ/Dornier Consulting
: Engineer- Instrumentation & Control
: E& I Engineering Manager
: 15 May 2012 to till date
: One Month
: Mr. Nam Soo Hur I&C Design Manager SWSR Project Liwa
Over all Supervision of Basic & Detailed Engineering Subcontractors and
ensure compliance with the project specification and requirements
 Review of Basic and Detailed Engineering Deliverables such as
Review of Operation & Control Philosophies
P&ID review, Commenting and updating
Set points and Alarm Lists.
Cause & Effect charts.
Control & Regulation Loops
Review & Preparation of Instrument data sheets
Review & Preparation of instrument index
Review & Preparation of I/O list
Review & Preparation of cable schedule
Review of instrument typical and hook up drawings
Review of field instrument Location layouts
Review I&C Cable Routing layouts
Review Control Room layouts
Review of Internal Wiring Diagram and Instrument Loop Diagram
Review JB schedule, Cable drum schedule
Review of overall plot plans, and cable trench lay out from other discipline.
Review of SCADA Functional Description Documents
Review of SCADA Control System Architecture Drawings
Review of SCADA Panel GA Drawings



Review of SCADA Panel Wiring Drawings
Review of Overall FOC Schematic Drawings
Review of FOC Splicing & Termination Details Drawing
 Conducting FAT & IFAT for ABB SCADA 800xA IndustrialIT Control System
Procurement & Erection Phase
 Procurement activities for all components related to I&C jobs (Field
Instruments, Cables, Junction Boxes and Instrument Installation Accessories
 Overall supervision and monitor the subcontractor construction/Installation
works and ensures compliance with the project drawing/specification and
requirements.
 Subcontractors Progress monitoring (daily, weekly and monthly)
 instrumentation works according to Client and advance scheduling of
instrumentation jobs before initiating work activities
 Project management activities, monitoring, inspection and approval of
construction work during erection stage
Pre Commissioning & Commissioning
 Overall supervision and monitor the Precommissioning Commissioning
subcontractor works and ensures compliance with the project
drawing/specification and requirements.
 Conducting Inspection with Client and Consultant
 Hot Commissioning and Start Up
Others
 Meeting / Coordination Consultant / Owner in order to discuss Technical
issues, changes in specification, Project Progress etc.
 Meeting / Coordination with supplier / manufacturer for the equipment
supply
 Support commercial team for the I&C Variation and prepare request for
quotation for I&C systems
 Prepares submittals of documents/drawings to consultant/client for their
review and approval as per project specifications and standards
 Finalize document for As-built drawing and follow up pending deliverables
 Co-ordination with client, subcontractors and/or suppliers.
 Co-ordinate with other discipline engineers to ensure completeness of the
engineering works.
 Providing E&I support to site engineers on technical query' issues
Previous Employer 1 : DOOSAN HEAVY INDUSTRIES & CONSTRUCTIONS Co LTD DUBAI
Project
: DEWA Jabel Ali M Power and Desalination Package ‘P’ 2000MW Dubai
Client
: Dubai Electricity & Water Authority (DEWA)
Consultant
: Fitchner Consulting Engineers
Position
: I&C Commissioning Engineer
Reporting Authority
: I&C Commissioning Manager
Work period
: 7 April 2011 to 20 March 2012
Job Responsibilities
 Conducting Inspection with Client and Consultant
 Progress monitoring (daily, weekly and monthly)
 Certify/witness of testing and commissioning
 Handling commissioning activities like Continuity test, Loop checking & trouble shooting of
pressure, level flow, temperature, vibration transmitters & switch (high-low), valves, control
valves & ON/OFF valves, MOVs & insulation test of instrument cables
This document is electronically transmitted and does not contain any signature
2

Reviewing and finalized all daily reports, work schedules, requirements need such as
manpower and equipment on the job site and pre-commissioning activities.
 Coordinate with vendor/contractors for installation & interfacing of PLC’S, DCS, ESD and
miscellaneous equipment.
 Work on experience in motor control loops, & vibration transmitter switches & elements
commissioning of Electrical Status Signals
 Using DCS Siemens SPPA T3000, Vibration monitoring system, Vibro - Meter VM 600
Test Equipments (Hand on Experience)

Field communicator Emerson(Hart 375 &475)

Dead Weight Tester , Pressure calibrator DPI 603(Druck)

Temperature Calibrator (Fluke), Altek 211 RTD calibrator

Voltage/milliamps Source (Druck)

Pneumatic pressure calibrator (Druck)

Hand Pumps pneumatic and hydraulic

Fluke 744 documenting process calibrator

Ametec temperature calibrator
Previous Employer 2
Project
Client
EPC Contractor
Position
Reporting Authority
Work period
Job Responsibilities







: GAMA QATAR
: Qatar Gas 3&4 (QG 3&4) LNG Onshore Project
: Qatar Gas Operating Company
: Chiyoda Technip Joint Venture (CTJV)
: Instrument Engineer.
: I&C Section Engineer
: July 2009 to April 2010
Reviewing and finalized all daily reports, work schedules, requirements need
such as manpower and equipment on the job site activities.
 Weekly & Monthly Progress Meeting with Client & Contractor
 Plant Construction activities in charge - Slug Catcher and Inlet Facilities.
 Evaluation of plant technical problems related to instrumentation and
control during Construction.
 Responsible for conducting the meeting with main contractor to resolve the
project issue and Calibration in charge
Installation of transmitters according to instrument layout hookup drawings and P&ID
Installation of DCS Main Control Panels and Local Control panels
Installation I&C Cables
Impulse tubing of differential pressure level transmitters, pressure transmitters, flow
transmitters control valves etc.
Responsible for installing Control panels (DCS & SCADA) & installation of field instrument
junction boxes and LCP.
Instrument Field calibration, Bench calibration, Loop checking, Trouble shooting, Cable
termination, Conducting, Valve stroking, Cable tagging, leak testing, Installation of field
instruments, Cable pulling and cable route trench plan, stub ups installation according to
corresponding drawing.
Previous Employer3
Project
Client
Position
Reporting Authority
Work period
: MEGI CONTROL SYSTEMS PVT LTD THANE MUMBAI
: L P G bottling plant Khapri India (HPCL), L P G bottling plant Gandhar India (IOCL),
: Hindustan Petroleum Corporation Ltd (HPCL), Indian Oil Corporation Ltd
: Project Engineer.
: Project Manager
: May 2008 to February 2009
This document is electronically transmitted and does not contain any signature
3
Job Responsibilities
 Loop checking of instruments open and close loop, pumps, vibration
elements, mov’s. etc
 Evaluation of plant technical problems related to instrumentation and
control.
 Installation of transmitters according to instrument lay out hookup drawings
and P&ID
 Tubing of differential pressure level transmitters, pressure transmitters,
flow transmitters control valves etc.
 Pre-commissioning and Commissioning
Previous Employer3
Project
: AV INSTRUMENTATIONPVT LTD BHANDUP MUMBAI
: PETRONET LNG expansion project in Dahej Gujrat.
Erection and commissioning with, Sanofi Aventis Pharmaceutical Goa
Position
Reporting Authority
Work period
Job Responsibilities
: Project Engineer.
: Project Manager
: January 2007 to April 2008
 Responsible for handling commissioning activities like Calibration, Loop
checking & trouble shooting of pressure, level flow, temperature
transmitters & switch (high-low), valves, control valves & ON/OFF valves &
meggering of Instrument cables
 MCC panel control wiring, PLC panel control wiring testing and
commissioning.
 Work on experience in motor control loops, & vibration transmitter
switches & elements
Educational Chronicle
1. Attained Bachelor of technology (B Tech) in Instrumentation and Control Engineering,
(2002-2006) From SNMIMT Maliankara, Eranamkulam. Under Mahatma Gandhi University
Kerala. India.
Engineering Documentation
 Inspection and Test Plan (ITP), Method statements (MS) for FAT, SAT, Testing and final hand
over documentation.
 Client co ordination and progress analysis & review meetings MOM (minutes of meeting)
Weekly, Biweekly and monthly
HSE Compliance for Site activities
 Certified First Aider & Fire Marshal
 Active member in contribution to review and develop good management principles,
procedure and work culture and strict maintain.
 HAZOP study for water plants – hypothetical division of a plant into zones where risk may arise.
An area classification established in this way permits the proper selection of apparatus, tools,
procedure and instruments for use in such hazardous area s.
Personal Details
Name
Gender
Date of Birth
Passport No
Marital Status
Languages Known
:
:
:
:
:
:
Sumesh P Sankaran
Male
31 05 1984
H 0288866 Indian
Married
English, Hindi, Malayalam and Tamil
This document is electronically transmitted and does not contain any signature
4
Download