Bhartendra

advertisement
RESUME
Bhartendra Singh
S/o Shri Fateh Veer Singh
Gali No.4, Near Nav Durga Shakti Temple
Old G.T. Road , Khurja
Dist. : BulandShar
Ph. No. ( 05738 ) 248771
Mobile No. : 09687641692/09638475432
E-mail
: bharat47601@rediffmail.com,
bhariendrasingh@punjlloyd.com
Personal Data
Date Of Birth
:
Marital Status
:
Sex
:
22nd Dec. 1976
Married
Male
Relevant Experience











Presently Working As Construction Manager In EPC Project of ONGC.
Worked as Construction Manager In 48’’ DVPL-II Gas Pipe line Project.
Worked as Dy. Manager In 48’’ East – West Gas Pipe line Project.
Worked as Sr. Eng. In 18’’ Mundra – Delhi Pipe line Project.
Worked as Sr. Eng. in Naptha Cracker Unit of IOCL Mathura Refinery.
Worked As a Project Eng. Electrical at CPCL Ref. III Expasion Project (
CDU/VDU/Merox Unit ) Chennai.
Worked as an Project Engineer in SANGHI CEMENT- GUJARAT (one of the
world’s largest cement plant, capacity-2.6 MTPA)
Installation & commissioning of marine (jetty) electrical works as per approved IS &
Bs at Dhabol LNG Project.
Worked as an execution Engineer for installation and testing of electrical panels at
substation, testing & commissioning of electrical motors, Process area Lighting &
Earthing works.
Worked as an Execution Engineer for installation & commissioning of cathodic
Protection System & Optical Fibre Cable System in cross-country pipelines.
Worked as a QA/QC Engineer for inspection of Electrical works at Tanks & Process
Area at Dhabol LNG Project.
Computer Literacy
 Microsoft Office
 Internet Browsing
Educational Qualification
Diploma in Electrical Engineering- Madhya Pradesh Technical Board.
B.Tech. in Electrical Engineering – Rajasthan University
Experience Highlights
Organization
Period
:
:
M/s Punj Lloyd Ltd.
From March 2005 to Till now
Punj Lloyd Group is a diversified global conglomerate providing Engineering &
Construction services in Oil & Gas, Infrastructure and Petrochemicals, and with
interests in Defence, Aviation, Marine and Upstream sectors.
Project Name
:
48”  DVPL-2
Period
:
From August 2009 to till now
Designation
:
Manager
Client
:
Gas Authority of India Ltd.
Job Responsibilities
a. Responsible for all the front end and back end activities.
b. Site Planning, co-ordination & Client Billing.
Achievements
Successfully Completed the difficult Patch of 11 Km of GIDC area in Dahej which
was full of foreign line crossing.
____________________________________________________________________
Project Name
:
48”  East West Gas Pipe line Project
Period
:
From July 2007 to August 2009
Designation
:
Dy. Manager
Client
:
Reliance Gas Transportation & Infrastructure
Limited
Job Responsibilities
a. Individually handled all the activities of 25 km. of mini spread in GIB area.
b. Station Electrical works.
c. Site Planning, co-ordination & Client Billing.
Achievements
Completed 100 nos. main line joint in a single day with one Automatic Welding
crew.
Project Name
:
18”  Mundra – Delhi Pipeline Project
Period
:
March 2005 to July 2007
Designation
:
Sr. Engineer
Client
:
M/s HPCL
Consultant
:
Engineers India Ltd.
Job Responsibilities
a. All the Back end activities in 200 Km stretch.
b. Station Electrical and Instrumentation Works.
c. Client billing and Documentation.
_________________________________________________________________-
Achievements
 Proper implementation of Quality Assurance plans and maintains a less rework
percentage throughout the project.
_________________________________________________________________
Organization
Period
: M/S Jay Krishna Ind. Ltd.
: From July 2001 to March 2005
M/S Jay Krishna Ind. Ltd is an Engineering & Construction company engaged in
installation & Execution of Electrical & Instrumentation works on turnkey/
conventional basis in Chemical & Petro- chemical Refineries, Cement Plants.
Project Name
:
Period
:
Naptha Cracker Unit IOCL MATHURA
Refinery
From March 2003 to Feb. 2005
Designation
:
Sr. Engineer
Client
:
Toyo India .
Consultant
:
Lurgi India.
Job Responsibilities
a. Conform the quality of work as per the standards & IS codes .
b. To co-ordinate with client and consultant for various engineering problems and
provide solution for them.
c. Responsible for installation of all equipment inside the Substations.
d. Responsible for Earhting of Various Equipments in both the Substations and tank
area.
e. Responsible for laying of HT as well as LT cables for Motors & Panels.
f. Responsible for preparation of ITP’s & QAP’ s for & necessary documents for
Pre commissioning & commissioning of various equipments.
g. Responsible for making & Submission of R.A. Bills for the executed work.
h. Responsible for Closing of Contract in all respect.
Project Name
:
Period
:
From June 2002 to March 2003
Designation
:
Project Engineer
Client
:
Chennai Petrolium Corporation Ltd.
Consultant
:
CPCL REF. III PROJECT,
MANALI - CHENNAI
Engineers India Ltd.
Job Responsibilities
a. Conform the quality of work as per EIL standards & IS codes .
b. To co-ordinate with client and consultant for various engineering problems and
provide solution for them.
c. Responsible for installation of all equipment inside the Substations.
d. Responsible for Earhting of Various Equipments in both the Substations and Unit
area.
e. Responsible for laying of HT as well as LT cables for Motors & Panels.
f. Responsible for preparation of ITP’s & QAP’ s for & necessary documents for
Pre commissioning & commissioning of various equipments.
g. Responsible for making & Submission of R.A. Bills for the executed work.
Achievements
 Proper implementation of Quality Assurance plans and completion of both the
Substations with in the specified time.
Project Name
:
Sanghi Cement Ind.- Sanghipuram (Gujrat),
One of the world’s largest cement Plant.
Period
:
From July 2001 to June 2002
Designation
:
Project Engineer
Client
:
Sanghi Ind. Ltd.
Job Responsibilities
a. Conform the quality of work as per required codes and specifications.
b. To co-ordinate with client and consultant for various engineering problems and
provide solution for them.
c. Responsible for installation & pre-commissioning of electrical panels,
Transformers at substation & Bag House.
d. Responsible for Installation of CT’s, PT’s, SF6 Breaker, Isolators & Lightning
Arrestor’s in 220 KV Switchyard.
e. Responsible for Earhting of Various Equipments in 220 KV Switchyard &
various areas in plant.
f. Responsible for making & Submission of R.A. Bills for the executed work.
g. Prepare necessary documentation for electrical clearance and pre-commissioning.
_________________________________________________________________
Achievements
 Proper implementation of Quality Assurance plans and completion of work with
in the specified time.
__________________________________________________________________
Organization
Period
:
:
Punj Lloyd Limited
From Feb. 1997 to July 2001
Punj Lloyd Group is a diversified global conglomerate providing Engineering &
Construction services in Oil & Gas, Infrastructure and Petrochemicals, and with
interests in Defence, Aviation, Marine and Upstream sectors.
Project Name
:
LNG-Regasification Terminal Phase –II
Dabhol Power Company, Enron Power
Project
Period
:
From Feb. 2001to June 2001
Designation
:
QA/QC Engineer
Client
:
Kaverner Construction India Ltd., Lingtec,
DPC
Job Responsibilities
a. Confirm the quality of work as per required codes and specifications.
b. To carry out inspection as per ITP and implement of QAP.
c. To co-ordinate with client and consultant for various engineering problems and
provide solution for them.
d. Prepare necessary documentation for electrical clearance, and pre
commissioning.
e. Documentation as per ISO 9001 and 9002 and face ISO Audits.
f. Inspection of all project material procured by Punj Lloyd Ltd.
Achievements
Proper implementation of Quality Assurance Plan and maintain a less rework
percentage throughout the project.
____________________________________________________________________
Project Name
:
12”  Jamnagar – Loni Pipeline Project
Period
:
August 1999 to Feb. 2001
Designation
:
Jr. Engineer
Client
:
M/s Gas Authority of India Ltd.
Consultant
:
Engineers India Ltd.
Job Responsibilities
a. Installation of TCP and PCP
b. OFC Laying and Splicing.
c. Station Electrical and Instrumentation Works.
Project Name
:
SRU-HPCL, Mumbai
Period
:
Feb. 1997 to August 1999
Designation
:
Jr. Engineer – Electrical
Client
:
Kinetic Technology international Spa.
Consultant
:
Engineers India Ltd.
Job Responsibilities
a. Conform the quality of work as per required codes and specifications.
b. To execute all the works as per approved ITP and implementation of QAP.
c. Responsible for installation & pre-commissioning of electrical panels,
Transformers at substation, lighting & Earthing work in plant area.
d. Prepare necessary documentation for electrical clearance and pre-commissioning.
e. Documentation as per ISO 9002 and face ISO Audits.
Other Informations
Language Known
:
English, Hindi
Hobbies
:
Singing, Playing Cricket, Watching Movies,
Traveling, reading
Current CTC
Expected CTC
:
:
Date:
Place
Bhartendra Singh
Download