RESUME Bhartendra Singh S/o Shri Fateh Veer Singh Gali No.4, Near Nav Durga Shakti Temple Old G.T. Road , Khurja Dist. : BulandShar Ph. No. ( 05738 ) 248771 Mobile No. : 09687641692/09638475432 E-mail : bharat47601@rediffmail.com, bhariendrasingh@punjlloyd.com Personal Data Date Of Birth : Marital Status : Sex : 22nd Dec. 1976 Married Male Relevant Experience Presently Working As Construction Manager In EPC Project of ONGC. Worked as Construction Manager In 48’’ DVPL-II Gas Pipe line Project. Worked as Dy. Manager In 48’’ East – West Gas Pipe line Project. Worked as Sr. Eng. In 18’’ Mundra – Delhi Pipe line Project. Worked as Sr. Eng. in Naptha Cracker Unit of IOCL Mathura Refinery. Worked As a Project Eng. Electrical at CPCL Ref. III Expasion Project ( CDU/VDU/Merox Unit ) Chennai. Worked as an Project Engineer in SANGHI CEMENT- GUJARAT (one of the world’s largest cement plant, capacity-2.6 MTPA) Installation & commissioning of marine (jetty) electrical works as per approved IS & Bs at Dhabol LNG Project. Worked as an execution Engineer for installation and testing of electrical panels at substation, testing & commissioning of electrical motors, Process area Lighting & Earthing works. Worked as an Execution Engineer for installation & commissioning of cathodic Protection System & Optical Fibre Cable System in cross-country pipelines. Worked as a QA/QC Engineer for inspection of Electrical works at Tanks & Process Area at Dhabol LNG Project. Computer Literacy Microsoft Office Internet Browsing Educational Qualification Diploma in Electrical Engineering- Madhya Pradesh Technical Board. B.Tech. in Electrical Engineering – Rajasthan University Experience Highlights Organization Period : : M/s Punj Lloyd Ltd. From March 2005 to Till now Punj Lloyd Group is a diversified global conglomerate providing Engineering & Construction services in Oil & Gas, Infrastructure and Petrochemicals, and with interests in Defence, Aviation, Marine and Upstream sectors. Project Name : 48” DVPL-2 Period : From August 2009 to till now Designation : Manager Client : Gas Authority of India Ltd. Job Responsibilities a. Responsible for all the front end and back end activities. b. Site Planning, co-ordination & Client Billing. Achievements Successfully Completed the difficult Patch of 11 Km of GIDC area in Dahej which was full of foreign line crossing. ____________________________________________________________________ Project Name : 48” East West Gas Pipe line Project Period : From July 2007 to August 2009 Designation : Dy. Manager Client : Reliance Gas Transportation & Infrastructure Limited Job Responsibilities a. Individually handled all the activities of 25 km. of mini spread in GIB area. b. Station Electrical works. c. Site Planning, co-ordination & Client Billing. Achievements Completed 100 nos. main line joint in a single day with one Automatic Welding crew. Project Name : 18” Mundra – Delhi Pipeline Project Period : March 2005 to July 2007 Designation : Sr. Engineer Client : M/s HPCL Consultant : Engineers India Ltd. Job Responsibilities a. All the Back end activities in 200 Km stretch. b. Station Electrical and Instrumentation Works. c. Client billing and Documentation. _________________________________________________________________- Achievements Proper implementation of Quality Assurance plans and maintains a less rework percentage throughout the project. _________________________________________________________________ Organization Period : M/S Jay Krishna Ind. Ltd. : From July 2001 to March 2005 M/S Jay Krishna Ind. Ltd is an Engineering & Construction company engaged in installation & Execution of Electrical & Instrumentation works on turnkey/ conventional basis in Chemical & Petro- chemical Refineries, Cement Plants. Project Name : Period : Naptha Cracker Unit IOCL MATHURA Refinery From March 2003 to Feb. 2005 Designation : Sr. Engineer Client : Toyo India . Consultant : Lurgi India. Job Responsibilities a. Conform the quality of work as per the standards & IS codes . b. To co-ordinate with client and consultant for various engineering problems and provide solution for them. c. Responsible for installation of all equipment inside the Substations. d. Responsible for Earhting of Various Equipments in both the Substations and tank area. e. Responsible for laying of HT as well as LT cables for Motors & Panels. f. Responsible for preparation of ITP’s & QAP’ s for & necessary documents for Pre commissioning & commissioning of various equipments. g. Responsible for making & Submission of R.A. Bills for the executed work. h. Responsible for Closing of Contract in all respect. Project Name : Period : From June 2002 to March 2003 Designation : Project Engineer Client : Chennai Petrolium Corporation Ltd. Consultant : CPCL REF. III PROJECT, MANALI - CHENNAI Engineers India Ltd. Job Responsibilities a. Conform the quality of work as per EIL standards & IS codes . b. To co-ordinate with client and consultant for various engineering problems and provide solution for them. c. Responsible for installation of all equipment inside the Substations. d. Responsible for Earhting of Various Equipments in both the Substations and Unit area. e. Responsible for laying of HT as well as LT cables for Motors & Panels. f. Responsible for preparation of ITP’s & QAP’ s for & necessary documents for Pre commissioning & commissioning of various equipments. g. Responsible for making & Submission of R.A. Bills for the executed work. Achievements Proper implementation of Quality Assurance plans and completion of both the Substations with in the specified time. Project Name : Sanghi Cement Ind.- Sanghipuram (Gujrat), One of the world’s largest cement Plant. Period : From July 2001 to June 2002 Designation : Project Engineer Client : Sanghi Ind. Ltd. Job Responsibilities a. Conform the quality of work as per required codes and specifications. b. To co-ordinate with client and consultant for various engineering problems and provide solution for them. c. Responsible for installation & pre-commissioning of electrical panels, Transformers at substation & Bag House. d. Responsible for Installation of CT’s, PT’s, SF6 Breaker, Isolators & Lightning Arrestor’s in 220 KV Switchyard. e. Responsible for Earhting of Various Equipments in 220 KV Switchyard & various areas in plant. f. Responsible for making & Submission of R.A. Bills for the executed work. g. Prepare necessary documentation for electrical clearance and pre-commissioning. _________________________________________________________________ Achievements Proper implementation of Quality Assurance plans and completion of work with in the specified time. __________________________________________________________________ Organization Period : : Punj Lloyd Limited From Feb. 1997 to July 2001 Punj Lloyd Group is a diversified global conglomerate providing Engineering & Construction services in Oil & Gas, Infrastructure and Petrochemicals, and with interests in Defence, Aviation, Marine and Upstream sectors. Project Name : LNG-Regasification Terminal Phase –II Dabhol Power Company, Enron Power Project Period : From Feb. 2001to June 2001 Designation : QA/QC Engineer Client : Kaverner Construction India Ltd., Lingtec, DPC Job Responsibilities a. Confirm the quality of work as per required codes and specifications. b. To carry out inspection as per ITP and implement of QAP. c. To co-ordinate with client and consultant for various engineering problems and provide solution for them. d. Prepare necessary documentation for electrical clearance, and pre commissioning. e. Documentation as per ISO 9001 and 9002 and face ISO Audits. f. Inspection of all project material procured by Punj Lloyd Ltd. Achievements Proper implementation of Quality Assurance Plan and maintain a less rework percentage throughout the project. ____________________________________________________________________ Project Name : 12” Jamnagar – Loni Pipeline Project Period : August 1999 to Feb. 2001 Designation : Jr. Engineer Client : M/s Gas Authority of India Ltd. Consultant : Engineers India Ltd. Job Responsibilities a. Installation of TCP and PCP b. OFC Laying and Splicing. c. Station Electrical and Instrumentation Works. Project Name : SRU-HPCL, Mumbai Period : Feb. 1997 to August 1999 Designation : Jr. Engineer – Electrical Client : Kinetic Technology international Spa. Consultant : Engineers India Ltd. Job Responsibilities a. Conform the quality of work as per required codes and specifications. b. To execute all the works as per approved ITP and implementation of QAP. c. Responsible for installation & pre-commissioning of electrical panels, Transformers at substation, lighting & Earthing work in plant area. d. Prepare necessary documentation for electrical clearance and pre-commissioning. e. Documentation as per ISO 9002 and face ISO Audits. Other Informations Language Known : English, Hindi Hobbies : Singing, Playing Cricket, Watching Movies, Traveling, reading Current CTC Expected CTC : : Date: Place Bhartendra Singh