The State of Ohio
Department of Transportation
Project 10-8028 Daily Report
HAR/HAN-68-10.62/20.01/0.00
Co-Rt-Sec
Wed. 09-01-2010
Date
Shelly Paving
Supervisor
Skilled
Laborer
Start
Quit
Total
Ken Fern
4
6
06:30 a.m.
05:00 p.m.
10.5 hrs.
Justin Pearson
QC
07:00 a.m.
04:30 p.m.
09.5 hrs.
Description of Work
Ref
Item
Location
0007
407
(HAN) 06.070 mi ~ 08.110 mi, Lane 1 (Tack Coat)
0009
446
(HAN) 06.070 mi ~ 08.110 mi, Lane 1 (Asphalt Concrete Surface)
0019
614
(HAN) 06.070 mi ~ 08.110 mi (Work Zone Center Line)
Weather
Temperature
67o - 91o
Precipitation
0.00”
Rain Day?
N
Pay Items
Ref
Code
Location
Quantity
0009
01
(HAN) 06.070 mi ~ 08.110 mi, Lane 1 (Asphalt Concrete Surface)
0019
01
(HAN) 06.070 mi ~ 08.110 mi (Work Zone Center Line)
749.50 cy
2.04 mi
General Remarks
407—Tack
Surface was clean and dry; tack was sprayed w/clean nozzles; uniform coverage was
achieved.
See Spreadsheet for daily totals.
446—Surface Course
Paved Surface Course from Hancock County 68 SB, Lane 1; 6.07 – 8.110 mile marker;
2.04 miles paved today (plus mailbox approaches and drives).
Monday’s tonnage total 105.14 + 1511.00 = 1616.14 tons (TE217)
Add today’s total with
614—Work Zone Center Line, Class II
Striped 6.07 – 8.110 mi. marker
Asphalt Pavement Check: 8.110 - 6.07 = 2.04 x 5280 = 10,771.2 x 15 x 1.5 = 242,352/12 =
20,196/27 = 748 x 2.016 = 1507.968 ton; contractor placed 1511.00 tons, for a difference
of 3.032 tons, heavy
Equipment---paver, 3-vibratory steel drum rollers, tack truck, water truck, foreman
truck, pick-up, tractor w/ broom attachment, enclosed tool trailer, street sweeper,
striper, and broker trucks
**Larry Norris was on the job site today; and Dan Rettig stopped by the job site also.
Employee
13204
Jeromy Piehl
13204
Jeromy Piehl
13218
Penny Kessler
13218
13218
Hours
Reg.
O.T.
Remarks
4.5
3.5
Comp Used
Penny Kessler
2.0
Paving
Penny Kessler
1.5
Transport 446 cores to Test Lab