CASE STUDY – 408 PERMITTING AND LEVEE ACCREDITATION FOR WATERLOO, NEBRASKA ASFPM MAY 24, 2012 Presented by Randy Behm, PE, CFM Lalit Jha, PE, D.WRE, CFM ASFPM – May 24, 2012 OVERVIEW • • • • • Levee History and Background Regulatory Comparison Project Approach Problems and Challenges Lessons Learned ASFPM – May 24, 2012 LEVEE HISTORY AND BACKGROUND • • • • • Just West of Omaha West Bank of Elkhorn River Population 728 Levee Constructed in 1967 by USACE Entire Village is in Protected Area ASFPM – May 24, 2012 LEVEE HISTORY AND BACKGROUND • • • • • • • Enrolled in USACE PL 84-99 Program Accredited Levee Since Early 1980’s PAL Agreement entered on Jan 15, 2008 Evaluation, Design and Permitting(2008-2010) Construction Started November 2010 Construction Completed October 2011 Accreditation Packet Submitted on April 2012 ASFPM – May 24, 2012 PAL PROCESS • FEMA and Community Enter PAL Agreement • Levee is Shown as PAL and Allowed to Continue to Show Protection on Flood Map • Provides Two Years to Submit Documentation Meeting 44 CFR 65.10 Requirements • After PAL Expires, FEMA Must Take a Minimum of 18 Months for FollowUp Mapping Processes (but still initiates levee de-accreditation process) Recent Non-Accredited Levee Mapping Guidance -DRAFT process for mapping non-accredited levees, still being finalized ASFPM – May 24, 2012 FEMA CRITERIA* (44 CFR 65.10) • • • • • • • • Freeboard Closures Embankment Protection Embankment and Foundation Stability Settlement Analysis Interior Drainage Operation Plan Maintenance Plan ASFPM – May 24, 2012 LEVEE DE-ACCREDITATION IMPLICATIONS • Mandatory Purchase of Flood Insurance – Federally Backed Loan = Mandatory Flood Insurance • Development Restrictions • Property Value/Re-Sale Concerns • Economic Development Concerns Note: implications may be revised by new non-accredited levee mapping approach ASFPM – May 24, 2012 USACE PL 84-99 PROGRAM • • • • Authorized through ER 500-1-1 (Civil Emergency Management Program) Levees systems participating in PL84-99 must meet O&M RRR criteria PL84-99 is not directly associated with FEMA levee certification Levee section (crown, side slopes, r-o-w, seepage berms) remain intact ASFPM – May 24, 2012 USACE PL 84-99 PROGRAM • USACE Reviews – Modifications Related to O&M (Minor 408 Permitting) • Approval at District Level – System Changes to Levee Protection Level (Major 408 Permitting) • Approval at HQ level ASFPM – May 24, 2012 USACE PL 84-99 PROGRAM Sec – 408 Modifications (Major) Assessment • Modifications requiring Chief of Engineers approval: o degrading (lowering) project o raising o realignment • Analyses required for major modification o full range of loading (8 profiles) upstream, downstream, adjacent to o system performance (levee and structures) o risk analysis ASFPM – May 24, 2012 USACE PL 84-99 PROGRAM Sec – 408 Modifications (Major) Review • Iterative process: o USACE district (initial, 60%, 90%, DrChecks) o agency technical review o type II Independent External Peer Review o USACE Division o HQUSACE ASFPM – May 24, 2012 PROJECT APPROACH • Phased Approach – – – – Preliminary Evaluation Detailed Evaluation Design/Permitting and Construction Accreditation ASFPM – May 24, 2012 PHASE 1 – PRELIMINARY EVALUATION Levee Background Information Field Investigations Preliminary Hydrology & Hydraulics Preliminary Freeboard Assessment Levee Infrastructure Audit Preliminary Economic Impact ASFPM – May 24, 2012 PHASE 2 – DETAILED INVESTIGATIONS Detailed Geotechnical Investigation Detailed Hydrologic and Hydraulics - Internal Drainage Evaluation - Risk & Reliability Analysis - Pump Station evaluation Drainage Structure Evaluation Alternatives Analysis ASFPM – May 24, 2012 PHASE 3 – DESIGN AND CONSTRUCTION Design Plans & Specifications Construction Implementation Post Construction Permitting & Coordination ASFPM – May 24, 2012 Any improvement of levee will need U.S. Army Corps of Engineers approval. PHASE 4 - ACCREDITATION • Post-Construction – Verification of As-Built Condition and Meeting Project Intent – USACE O&M Manual Updates • Accreditation Package – FEMA PM 63 – FEMA Tabbed Submittal – Bringing it All Together ASFPM – May 24, 2012 LEVEE EVALUATION FINDINGS - Levee Improvement Needed ASFPM – May 24, 2012 DESIGN AND PERMITTING • Design of Improvements – – – – Increase in Levee Height Riverside Gatewell Improvements Addition of Toe Drain Accounting for O&M Deficiencies – Vegetation • Permitting – – – – – – 408 Permit 404 Permit Railroad Department of Road Floodplain Others ASFPM – May 24, 2012 CONSTRUCTION • Construction – – – – – Contractor Coordination and Observation Geotechnical Oversight Phasing for NEPA Vegetation Removal Emergency Action Plan (EAP) • Available/Designated Materials and Staff ASFPM – May 24, 2012 LEVEE IN ACTION • Elkhorn River Flooding (June 2010) ASFPM – May 24, 2012 LEVEE IN ACTION • Flooding Elkhorn River – Ice Jam Downstream (Feb 2011) • EAP Implemented ASFPM – May 24, 2012 PROBLEMS AND CHALLENGES • • • • Freeboard Geotechnical Interior Drainage Flood Warning Procedures ASFPM – May 24, 2012 PROBLEMS AND CHALLENGES • Time • FEMA vs. USACE Regulatory Requirements • An Acceptable Corps Inspection Rating, Alone, Does NOT Equate to an Accredited Levee for the NFIP ASFPM – May 24, 2012 PROBLEMS AND CHALLENGES • Funding – Little if Any Funding is Available at the National or State Levels – FEMA Mitigation Programs Specifically Exclude These Types of Projects – Communities Must Fund Improvements Themselves ASFPM – May 24, 2012 CONCLUSIONS AND LESSONS LEARNED • • • • • • • • • Evaluate Early Provide Routine Public Information Timeline for PAL Insufficient for Significant Improvements Coordinate with USACE Early Evaluation Criteria of FEMA and USACE Are NOT the Same Quality Geotechnical Evaluation Construction Operations Sequencing/Scheduling Vegetation Removals and Management Emergency Action Plan and Preparedness ASFPM – May 24, 2012 NATIONAL POLICY CHALLENGES AND EMERGING ISSUES • Higher Standards for Levees (500-Year/0.2% Annual Chance Flood) • FEMA Non-accredited Levee Mapping Approach • Mandatory Flood Insurance Behind Levees? • Railroad Highway Embankment Issues • Funding (or lack thereof) ASFPM – May 24, 2012 MANAGING RESIDUAL RISK Graphic Courtesy of U.S. Army Corps of Engineers ASFPM – May 24, 2012 ASFPM – May 24, 2012