SAME Meet the Chiefs COL Bruce Estok Seattle District Commander 17 June 2014 US Army Corps of Engineers BUILDING STRONG® Purpose & Key Points • Purpose: Provide Seattle District 3xP (Programs, Projects, Priorities) overview • Key Points: 1. Full-service District – Complex mission set; Military, Puget Sound, BPA Hydro are economic engines 2. District/Regional Culture – Innovation, Energy-Sustainability, Environmental Stewardship 3. District Future – Lean and flexible to meet USACE Campaign Plan in a fiscally dynamic environment 2 BUILDING STRONG® Agenda District Overview & USACE Campaign Plan Military Environmental, Interagency & International Support (IIS) Civil Works Operations & Navigation Contracting/Small Business BUILDING STRONG® Seattle District Mission: Provide service to the Armed Forces & a Nation at peace or war by designing, constructing, operating, and permitting military/civil works infrastructure and projects that build the Nation's military and long term economic might in an environmentally sustainable way. On order, execute Emergency Operations in support of local, state and federal agencies. By the Numbers: • 875 Personnel • FY14 Workload $513M; ~ 65% Mil, 30% CW, 5% IIS/HTRW • 19 WA/ID/MT Congressional Delegates (Civil Works) • Significant Tribal Interaction 4 BUILDING STRONG® District Leadership Executive Team DPM – Olton Swanson CDR – COL Estok Execution Deputy CDR – LTC Park Program Managers Engineering – JoAnn Walls Military/Partnership – Ginny Dierich Construction – Arill Berg Civil Works – Jessie Winkler Operations – Beth Coffey Operating Projects/ Nav – Wayne Wagner Support Contracting – Pat Blackwood Small Business – Frank Gutierrez 5 BUILDING STRONG® USACE Campaign Plan Goal 1 – Support National Security: Deliver Solutions to DOD & the Nation ► 34th FEST-A Redeploy ► 555 EN BDE Levee Surveys Goal 2 – Transform Civil Works: Deliver Water Resource Solutions ► PSNER, Skokomish, Skagit TSPs ► MMD FPP Draft BiOp & HHD BA ► FY16 Budget ► Award LWSC Gates ► Seahurst Ecocystem Goal 3 – Reduce Disaster Risks: Mitigate, Respond, Recover ► Coastal Responses ► Oso Response ► Interim Levee Policy ► SWIFs Goal 4 – Prepare for Tomorrow: Build People, Teams, Systems, Processes ► Graduated LDP 13-14, New LDP Contract, & Selected LDP 14-15 ► Established Lewis & Clark Project Office BUILDING STRONG® Future Vision . . . A Few Observations Seattle District – Reducing staff ~20% IAW anticipated FY15–17 programs; flexibility & agility via Region & Industry Military – Less MILCON & More FSRM; Service Contracts, Enhanced Commissioning Civil Works – Tension between reduced HQ staff & reduced $; hard to get things done but WRDA passed . . . 2015 KC SWIF Plan Operations – Aging Infrastructure; Asset Mgt vs Fix-As-Fail Environmental/IIS – Discretionary Customer Base Energy & Sustainability – Apply to USACE Infrastructure O&M Contracting Tools – Regional Perspective, Innovation BUILDING STRONG® District Workload & Future Current Outlook: Relatively healthy/diverse outlook; working regionally FY14 Workload $610M Military Missions – $415M / 70% Civil Works – $142M / 23% Environmental/Interagency – $43M / 7% FY15 Workload Projection $475M Military Missions – $319M /67% Civil Works – $130M/28% Environmental/Interagency – $26M/5% Future Direction: Workload reduction drives staff decreases via shaping strategy w/People, Business, & Markets lines of effort; limited “peaking” capability provides potential opportunity for industry BUILDING STRONG® JBLM Military Mission Program Seattle District Mountain Chart 1,000 1st Mountain - $320M/yr avg FY05-10 2nd Mountain - $159M/yr avg FY11-15 NWS ARMY TOTAL NWS AF TOTAL NWS DOD/OTHER TOTAL 800 600 400 Active Projects $623M (CWE) 200 0 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 27 Active in Construction $377M 19 Carry Over (FY11-FY13) $246M Prior Year – Acquisition 3xProjects Future Projects $20-80M/yr (CWE) Waste Water Treatment Plant ($86M) High uncertainty;1-2 projects/year SOF Battalion Operations ($43M) FY14 – Acquisition 6xProjects ~$198M SOF Dog Kennel ($3.6M) Machine Gun Range – Yakima ($9M) FY14 FSRM – Mix of MATOC, JOC, IDIQ 98 Projects Total $93.4M Aviation Complex 2A (Large Hangar, Hangar Repair 1 authorized and 1 potential TEMF, Sports Fields $79M) Aviation Complex 2B (Fire Station, Air FY 15 & Prior – Design Projects ~$18M Control Tower, Flight Center, RSU $37M) Yakima Barracks/DFAC (DBB) Aviation Complex 2C (COF, BN HQ $28M) FY 16 – Programming SOF Battalion Operations Facility ($43M) 0.0 Electrical Lines ($1.5M) 9 BUILDING STRONG® Air Force Military Mission BLUF: No New MILCON Projects FY 14-16 Fairchild AFB Potential Future Work (TBD) ►Airfield Communications ►Base Operations ►Future year KC-46A Program Malmstrom AFB Potential Future Work (TBD) North/South Gate Entry Control Missile Alert Facility Force Development Center Fitness Center Phase 2 Mountain Home AFB Potential Future Work (TBD) ► Replace Civil Engineering Facility (DB) ►Runway Repair – unrestricted, bids due 10 JUL JPRA, White Bluff Complex, Spokane County Potential Future (TBD) ►Command and Control Facility (DB) BUILDING STRONG® Mountain Home AFB Airfield Runway and Taxiway Repair/Replacement Project Mt. Home AFB. ID Project: Remove & repave 250K SY runway/seal cracks, replace other slabs as part of 90K SY taxiway alpha work Schedule: 5 Jun 14 – Advertise 100% designed project unrestricted acquisition 24 Jun 14 – Pre-bid conference/site visit for interested contractors Sep 14 – Award contract Oct 14 – Approve Bonds, Issue Notice to Proceed, Preconstruction Conference Oct 14 – Nov 14 – Start seal crack work on Taxiway A Apr 15 – Aug 15 – Complete Runway and Taxiway A Repair/Replacement 11 BUILDING STRONG® Environmental & Interagency/Intl Services (IIS) FY14 Env Pgm – $23M; Projects > $1M Formosa Mine (BLM ) Umatilla Remediation (Army BRAC) Bunker Hill Pump & Treat (EPA) Malmstrom/Mt Home Env Svcs (AF-EQ) – Omaha District FY15 Env Pgm $53M, (FY16 $50M) Colville, WA - Border Patrol Station FY14 IIS – $6.1M; Projects > $1M Bunker Hill Upgrade Central Treat Plant Energy conservation initiatives, JBLM (DOE/BPA $) Moses Lake Pump & Treat (EPA) Thermostats and sensors, JBLM (FSRM $) Hamilton LaBree cleanup (EPA) Scrap yard upgrade, JBLM (DLA $) Installation Env Compliance Services (AF/Army EQ) FY15 & FY16 IIS <$10M (Uncertain) Energy conservation measures, JBLM DLA warehouse remodel, JBLM Potential to support other customers (VA, NPS, FS, FWS, Postal Service) Commencement Bay, Tacoma - well 12A remediation BUILDING STRONG® Civil Works – Studies & Construction •Ecosystem Studies – Complete 2015 PS Nearshore – Tentative Selected Plan (TSP) JAN 14; 11-site, 4,800+ acres & ~$1B in future potential projects Skokomish – Agency Decision Milestone (ADM) JUN 14; 9-site, 330 acres & $42M in future potential projects Near Shore •Flood Risk Management Studies – Complete 2015 Puyallup – Plan for TSP 2014 Skagit – ADM OCT 14; Improves 9 miles levee, builds 3 miles levee & 2 miles floodwall & $250M in future potential projects Skagit River Delta •Construction Green Duwamish – FY14 Award Mill Creek & Boeing Levee PS Adjacent Waters – Dungeness Levee Setback NET FY15 Boeing Levee • Other – Fish Passage Projects Mud Mountain Dam – ESA BiOp 2014 w/plan for Design 20152016 & Construct NET 2017–2020 Howard Hanson Dam – ESA BiOp 2014 then TBD 13 Mill Creek BUILDING STRONG® Elliott Seawall Operations USACE Contracts Sediment Characterization Clamshell & Hydraulic Dredging Revetment & Breakwater Construction East (Hydro, Env, Flood) FY14-15 AFD Rehab Tailrace Stoplogs CJD DC/Preferred AC Libby Powerhouse & Upgrade Dam Elect West (Flood, Env, Nav) FY14-15 LWSC Replace Pump Plant MMD Emer Gate Hydraulic Cyl Repair HHD Hydraulic System Piping Repair FY14 Dredge $18.8M (Work in FY 14-15) Grays Harbor (yearly) Everett Harbor/Snohomish (yearly) Swinomish Channel Quillayute Channel and Marina FY15 Dredge ~$15.5M (Work in FY16) Grays Harbor Everett Harbor/Snohomish Seattle/Duwamish Dredging 14 BUILDING STRONG® Contracting & Small Business Contracts Currently 16 AE IDIQ w/$56.8M in capacity Currently 23 Construction Multiple Award IDIQs w/$89.5M in remaining capacity FY14 Plan to Award 2 AE IDIQs w/$25.7M in capacity FY14 Plan to Award 1 Construction Multiple Award IDIQs w/$5.9M in capacity Small Business Programs Small Business Results FY14 (as of 6 JUN 2014) Goal FY14 Small Businesses Small Disadvantaged Businesses Women Owned Small Businesses Service-disabled Veteran-owned Small Businesses HUBZone Small Businesses Historically Black Colleges and Universities/Minority Institutions (HBCU/MI) 28% 18% 4.50% 3.50% 5.00% 3.00% Achievement FY14 39% 25% 22% 6% 5% 28% BUILDING STRONG® Finding Contracting Opportunities Seattle District FedBizOpps www.nws.usace.army.mil/ www.fbo.gov FBO Tips SAM Register/keep current in System for Award Management, Entity Management http://www.sam.gov Downloading does not automatically get you update notifications, must be on "Watchlist." ASFI https://acquisition.army.mi l/ Want to show others you’re interested? Click "Add me to Interested Vendors List" Advanced Searches can automatically send you links to the opportunities you want to see. BUILDING STRONG® Questions Contact us: http://www.nws.usace.army.mil Contracting - Patricia Blackwood - 206-764-3772 Technical – JoAnn Walls - 206-764-3776 Small Business – Frank Gutierrez - 503-808-3852 BUILDING STRONG®