Task 2 VE Workshop

advertisement
Council Bluffs
Industrial Park Levee Accreditation
Kyle Tonjes, P.E.
Jared Olson, P.E.
Value Engineering
Workshop
Industrial Park Levee (IPL)
Background Information and 2011
Flood Fight
Industrial Park Levee (IPL)
204+00
224+00
A
236+00
B
244+00
C
D
Inland Flooding Between IPL and Federal Levee
IPL at Ameristar
IPL at Warren and Cargill
Levee Segment A
Original Study Recommendations:
• Re-align levee for
flood fight access
• Armor riverward
levee slope
• Remove concrete
barriers
• Increase levee height
(station 205+00)
• Improve interior
drainage and replace
drainage pipes
through levee
New Levee
Alignment
Levee Segment B
Original Study Recommendations:
• Remove concrete
retaining wall and metal
bin wall
• Extend levee top
landward
• Raise earth
embankment
• Improve interior
drainage and replace
drainage pipe through
levee
Levee Segment C
Original Study
Recommendations:
• Embankment
protection
– Sheet pile wall
– Regrade levee
slope to 3:1
– Riprap to
normal high
river level
– Gravel above
normal high
river level
Levee Segment D
Original Study
Recommendations:
• New levee alignment
• Fill boat slip or
construct floodwall on
west side of boat slip
New levee
alignment
Value Engineering of Original
Study
PRE-WORKSHOP
Preparation Phase
Orientation Memo
Team Member Homework Research
Cost Estimating
TASK 2
VE WORKSHOP
Information Phase
Function Analysis Phase
Creative Phase
Evaluation Phase
Development Phase
Presentation Phase
TASK 3
TASK 1
Proposed VE Work Plan
POST-WORKSHOP
Owner/Designer Review of VE Comments
Implementation Meeting
Preparation of Final Report
Deliverables:
• Detailed VE Workshop
Agenda
• Homework
Assignments
Deliverables:
• Preliminary
VE Report
• Oral debriefing
to owner and
designer
Deliverables:
• Help owner/designer
decide on VE Proposals’
disposition
• Final VE Report
VE Team
Workshop: Information Phase
• Activities
– Presentation of original study background
and findings by the City
– Q & A discussion between workshop
participants, City, and levee sponsors
– Site tour with levee sponsors
• Outcomes
– Design Criteria: FEMA 44 CFR.65.10
accreditation adequate vs. USACE ETL 11102-570 and inclusion in PL 84-99 program
– List of goals and expectations for the levee
program
– List of major issues as viewed by the
sponsors
Task 2
VE Workshop
Workshop: Function Phase
• Activities
– Break down the project into basic functional
• Outcomes
– Five basic functions were identified for the
levee project
 Stabilize Embankment
 Protect Embankment
 Increase Freeboard
 Prevent Backflow
 Drain Stormwater
Task 2
VE Workshop
Workshop: Creative Phase
• Activities
– Brainstorming of ideas for each function
group
– Judgment of ideas is discouraged at this
point, a wide range of ideas is sought
– Not judging ideas immediately is difficult, but
doing so keeps the creative process flowing
• Outcomes
– Development of a long list of ideas for each
function group aimed at enhancing the
original study proposals
 At this point the list of ideas is raw, some
items may be duplicated under multiple
function groups, etc.
Task 2
VE Workshop
Workshop: Judging Phase
• Activities
– Develop screening criteria
 Increase level of protection
 Potential to minimize cost
 Strong technical solution
 Potentially acceptable to levee Sponsors and
does not impact operations
 Enhances O&M
– Each VE Team member evaluates each idea
based on screening criteria and votes for
ideas that should be further considered
– Members may also reject ideas that are not
believed to satisfy a majority of the screening
criteria
– The facilitator then leads a discussion to
resolve conflicts
Task 2
VE Workshop
Workshop: Judging Phase (Cont)
• Outcomes
– List of ideas that will be carried forward for
further development and cost estimating
 Ideas can be grouped and combined
 Rejected items are dropped
 Some items are judged to be equivalent to
the original design (report)
– Some ideas are classified as future design
suggestions
Ideas that would normally be incorporated
into or considered during a levee design
 Ideas that had minor cost implications would
be better known during detailed design
Cost implications were minor but have
potential to affect O&M positively or
negatively.
Task 2
VE Workshop
Workshop: Development Phase
• Activities
– Develop the concept for each chosen idea
into a complete VE Proposal
 Develop full proposal description and
advantages and disadvantages
 Estimate quantities
 Estimate cost and compare to original study
 Prepare sketches or other backup
information to document the proposal
 Group compatible proposals
• Outcomes
– List of fully developed VE proposals and the
cost implications of each
– The proposals were presented to the levee
Sponsors and the City at the end of the
Workshop
Task 2
VE Workshop
Major VE Proposals
High Ground Option
• Certify Ameristar Hotel area
as high ground (LOMR-F)
– All areas where structural fill
was placed to required height
above 100-year WSE
– Levee ties in at south and
east sides of high ground
– Eliminates concerns about
utility locations
– Will require verification that
basement meets “floodproofing” requirements
Other Proposals
• Reconstruct drainage pipes through levee
– This is consistent with original study
• Eliminate sheet pile toe wall along Ameristar
in Segment C
– Review of topographic survey and bathymetric
survey shows 3:1 slope achievable without sheet
pile
• Seed riverward slopes in Segments A & B
instead of armoring with gravel/cobble
– Velocities appear low enough above normal high
bank to not require slope protection beyond
seeding
• Do not move levee west in Segment A
– Building clearances from levee toe adequate for
44 CFR 65-10
Discussion/Questions
Download