blackmore.it 15 staff 20,000 sq ft facility near A303 blackmore.it WFD waste hierarchy blackmore.it You should consider what wastes you produce and how they are managed. The steps you will need to consider are; Using the waste management hierarchy You need to consider the hierarchy of waste management options. The hierarchy sets out, in order of priority, the waste management options you should consider. It places more emphasis on waste prevention, and then requires you to consider preparing waste for reuse, then opportunities for recycling, before options for recovery such as energy recovery and once all these other options have been explored, disposal. From 28 September 2011, whenever you pass waste on to someone else, you will have to declare on the waste transfer note, or consignment note for hazardous waste, that you have applied the waste management hierarchy. blackmore.it The purpose of this exemption is for the reuse of WEEE, or any dismantled components of WEEE, for their original purpose. blackmore.it Metal £150 PCB £2500 Copper £4000 Cable £1500 Aluminium £2000 blackmore.it Metal £150 = 15p per kg PCB £2500 = £2.50 per kg Copper £4000 = £4 per kg Cable £1500 = £1.50 per kg Aluminium £2000 = £2 per kg blackmore.it Metal £150 = 15p per kg PCB £2500 = £2.50 per kg Copper £4000 = £4 per kg Cable £1500 = £1.50 per kg Aluminium £2000 = £2 per kg TOTAL: 6kg = 90p 1.2kg = £3 250g = £1 500g = 75p 100g = 20p 8.05kg = £5.85 £90 blackmore.it blackmore.it blackmore.it Positive confirmation of destruction Certified with Professional Indemnity cover Inspected and approved by: Grant Thornton Ernst & Young Dixons Lombard Mitie Serco blackmore.it China makes new PC + mains lead UK installs new PC Copper sent back to China New mains lead sent for copper Old PC recycled + new mains lead blackmore.it Try to re-use Be data safe Save money Increase employment Generate CSR funding blackmore.it