Westin Dragonara Resort, Malta 4 March 2013 ‘Implementation of the new Air Operations Regulations in Malta’ Capt Michael O’Brien Head of Flight Operations Inspectorate Transport Malta – Civil Aviation Directorate Development of Air Operations Regulations in Europe Joint Aviation Authorities. JAR-OPS 1 (Aeroplanes) JAR-OPS 3 (helicopters). EU-OPS (Aeroplanes). EASA Implementing Rules will replace EU-OPS and JAR-OPS 3. New rules encompass a range of commercial and noncommercial operations. 2 The Air Operations Regulation (965/2012) entered into force on 28th October 2012. Malta will make use of the 2 year opt out period therefore the ‘Date of Application’ of the Regulation in Malta will be 28th October 2014. In the meantime EU-OPS and JAR-OPS 3 will continue to apply. 3 Regulation (EC) No 965/2012 contains the first 5 Annexes of the Air Operations Regulation Annex I Annex II Annex III Annex IV Annex V DEF Definitions used in Annexes II to VIII Part-ARO Authority Requirements for Air Operations. Part-ORO Organisation Requirements for Air Operations. Part-CAT Commercial Air Transport Operations with aeroplanes and helicopters. Part-SPA Requirements for operations requiring Specific Approval e.g. RVSM, MNPS, LVO etc. 4 The Regulation will be complemented by Annexes VI to VIII including regulations for Sailplanes and Balloons (CAT S & B), A to A Operations (CAT A-A) and rules concerning Flight Time Limitations later in 2013. Annex VI Part-NCO Requirements for NonCommercial Operations of complex motor powered aircraft. Annex VII Part-NCO Requirements for NonCommercial Operations of otherthan-complex motor powered aircraft. Annex VIII Part-SPO Requirements for Specialised Operations including commercial and noncommercial operations e.g. Aerial Work. 5 Regulation Air Operations Annex I DEF Annex II Part-ARO Annex III Part-ORO Annex IV Part-CAT Annex V Part-SPA Annex VI Part-NCC Annex VIII Part-SPO Annex VII Part-NCO .GEN .GEN .GEN .GEN .GEN .GEN .GEN .OPS .AOC .OP .PBN .OP .OP .OP .RAMP .DEC .POL .MNPS .POL .POL .POL AOC –Air Operator’s Certificate ARO –Authority Requirements Operations CAT –Commercial Air Transport CC-Cabin Crew DEC- Declarations DG – Dangerous Goods FC – Flight Crew GEN – General HHO – Helicopter Hoist Operations IDE - Instrument Data Equipment LVO – Low Visibility Operations MLR –Manuals, Logs & Records MNPS –Minimum Navigation Performance Specification NCC – Non-Commercial Complex NCO – Non-Commercial Other Than Complex NVIS –Night Vision Enhancement Systems OP –Operating Procedures ORO – Organisation Requirements Operations PBN – Performance Based Navigation POL – Performance & Operating Limits RVSM – Reduced Vertical Separation Minimum SEC – Security SPA –Specific Approvals SPO –Specialised Operations (Aerial Work) .MLR .IDE .RVSM .IDE .IDE .IDE TC –Technical Crew .SEC .LVO .FC .ETOPS .CC .DG .TC .NVIS .FTL .HHO .SPEC .HEMS 6 Actions by the Civil Aviation Directorate during the transition period. Inform EASA and the Commission of our intention to use the opt-out and submit our implementation plan. Make necessary changes to our Inspecting Staff Manual and Management System Manual. Issue further advisory material to operators by way of Operations Advisory Notices (OAN) and convene additional Flight Operations Consultation Group (FOCG) meetings. 7 Monitor Operators’ progress with implementation and conduct visits to individual operators to give advice where necessary. Review Operators’ submissions of revised Operations Manuals. Check each operator’s application for the EASA AOC, Compliance Checklist and Compliance Statement. Issue the new AOCs. 8 Actions to be taken by existing Operators during the transition period. Appoint a project leader/point of contact. Analyse the new regulation, associated means of compliance and guidance material and consider the implications for their own operation. Conduct a gap analysis to identify individual areas that would need development and/or adaptation. 9 Devise a road map to ensure that the set target dates can be achieved. Inform the CAD Flight Operations Inspectorate of time scales set for the implementation plan. Adapt their Management Systems, including a Safety Management System and Operations Manuals to satisfy the new Regulation. Submit a notice of proposed amendment for the Operations Manual with a list of changes made to the existing manual. 10 Complete the process for grant of an EASA AOC by April 2014 at the latest – 6 months prior to the expiry of the opt-out. Ensure that crew members and other operations personnel are briefed on the changes that have been made. This briefing, which must be recorded, is to be given prior to the revised documentation being used as reference in actual operations. 11 Advice to Operators Do: Start work now and devise a plan of action. Keep CAD Flight Operations Inspectorate informed. Aim to submit necessary material as soon as possible. Apply adequate resources. Keep in mind that, after the end of the opt-out period, AOCs issued in accordance with EU-OPS or JAR-OPS 3 will no longer be valid. Do Not: Panic! Delay or underestimate the work to be done to obtain the new AOC 12 Thank you. 13