Mega-Scale Fabrication by
Contour Crafting
Behrokh Khoshnevis
University of Southern California
Viterbi School of Engineering
.
USC
Fabrication Processes
• Subtractive (milling, turning, chiseling, sawing,..)
• Formative (pressing, forging, bending,..)
• Additive
– Casting (requiring mold)
– Traditional Layered Fabrication in manual construction
– Modern Layered Fabrication (SFF or RP) Technologies
Viterbi School of Engineering
.
USC
Commercialized RP Technologies
Viterbi School of Engineering
.
USC
Limitations of current SFF methods
•
•
•
•
Slow speed
Not scalable
Limited choice of materials
Impossible to embed other objects
Viterbi School of Engineering
.
USC
What is Contour Crafting?
Material feed barrel
Side trowel control
mechanism
CC is a layered fabrication method
which combines ancient surface
forming concepts with modern
robotics technology
Nozzle
Top trowel
Side trowel
Viterbi School of Engineering
.
USC
A CC machine for thermoplastics
Viterbi School of Engineering
.
USC
Nozzle Assemblies
Viterbi School of Engineering
.
USC
Plastic Parts
Viterbi School of Engineering
.
USC
Movable Side Trowel
Cylinder
Connector
Bevel gear
Nozzle
Side trowel
mechanism of
movable side
trowel
Viterbi School of Engineering
.
USC
Building Various Surface Slopes
Viterbi School of Engineering
.
USC
Slant Wall Fabrication
Viterbi School of Engineering
.
USC
Creating hollow depositions
Viterbi School of Engineering
.
USC
Embedding Reinforcement
Viterbi School of Engineering
.
USC
Application in Construction
Viterbi School of Engineering
.
USC
Maslow’s Hierarchy of Needs
Self Actualization Needs (full potential)
Ego Needs (self respect, personal worth, autonomy)
Social Needs (love, friendship, comradeship)
Security Needs (protection from danger)
Physiological Needs (food, shelter)
Viterbi School of Engineering
.
USC
Why automate construction?
•
Labor efficiency is alarmingly low
•
Skilled workforce is vanishing
•
Work quality is low
•
Control of the construction site is insufficient and difficult
•
Accident rate at construction sites is high
•
Waste and trims are high (3 To 7 tons per average home; 40% of all materials used
(> 400,000 / year in US)
worldwide are for construction)
•
Low income housing and emergency shelters are critical
•
Construction is the largest sector of almost all economies
•
All other products are fabricated automatically – construction is still
largely a manual task
Viterbi School of Engineering
.
USC
Construction productivity decline
Non-farm productivity index
Construction
Productivity index
Labor productivity comparison for non-farm industries and construction industry
developed by Paul Teicholz
Viterbi School of Engineering
.
USC
Edison’s concrete houses
$175,000 for molds
More than 2000 pieces
500,000 pounds
Viterbi School of Engineering
.
USC
Automated construction in Japan
• 89 single task construction robots
• 11 different automated construction systems
This robot
absorbs
the water
which
remains
after
concrete
has been
set.
Concrete Surface Treatment Robot
Viterbi School of Engineering
.
USC
Big-Canopy high-rise pre-cast concrete construction system.
Used to construct the 26 storey pre-cast concrete 30,726m2
Yachiyodai Condominium building in Japan.
The system realized a 60% reduction in labor requirements for the frame erection.
Viterbi School of Engineering
.
USC
Form work cost structure
Reinforcement
Wales
Ties
Studs
Sheathing
Brace
Concrete footing
10%
7%
Formwork Labor
Concrete Materials
53%
30%
Formwork Materials
Concrete Labor
Viterbi School of Engineering
.
USC
A straight wall builder
Viterbi School of Engineering
.
USC
Full scale wall sections
Viterbi School of Engineering
.
USC
Viterbi School of Engineering
.
USC
Viterbi School of Engineering
.
USC
Adobe structures – Ageless comfort and beauty
House of
Brojerdi
Kashan
Viterbi School of Engineering
.
USC
Interior of an
Adobe house
CalEarth Design
Viterbi School of Engineering
.
USC
House made with vaults and domes
Interior of an
Adobe house
CalEarth Design
Viterbi School of Engineering
.
USC
Ingenious methods
Manual construction of adobe form structures
using clay bricks (Source: Khalili, 2000)
A vault structure made of clay bricks
(Source: Khalili, 2000)
Viterbi School of Engineering
.
USC
Free-standing Objects / Industrial parts
Viterbi School of Engineering
.
USC
Adobe house Construction
Viterbi School of Engineering
.
USC
Extraterrestrial Construction
Viterbi School of Engineering
.
USC
Deployable CC
Viterbi School of Engineering
.
USC
Lunar Construction
Viterbi School of Engineering
.
USC
Machine at NASA
Viterbi School of Engineering
.
USC
Viterbi School of Engineering
.
USC
Viterbi School of Engineering
.
USC
Viterbi School of Engineering
.
USC
Next Machine
Viterbi School of Engineering
.
USC
Viterbi School of Engineering
.
USC
Research specimens (concrete)
Viterbi School of Engineering
.
USC
Please visit www.ContourCrafting.org
Viterbi School of Engineering
.
USC
What constitutes construction cost?
Portion
Due to
If Automated by CC
20%-25%
Financing
Short project length and control of
time to market will dramatically
reduce this cost
25%-30%
Materials
Will be a wasteless (lean) process
45%-55%
Labor
Will be significantly reduced
Viterbi School of Engineering
.