1 - BT Wholesale

advertisement
BTW Planned Engineering Works
90 day overview
May 2013 to July 2013
These dates are indicative dates only and not to be used for any forecasting purposes as
they are all subject to change. Please ensure that you wait for formal notifications from
IRAMS.
The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
Please treat it accordingly and do not forward, republish or permit unauthorized access.
BT reserves the right to make changes to the information in this Presentation at any time without further notice.
1
BTW 2012 Network Changes – 3 month rolling plan
•
Whilst BTW has continually worked to enhance its network, we are currently undergoing an
exceptional level of change driven by four main drivers:–
–
–
–
•
•
•
•
2
Stability – to improve the reliability of the network, BTW is targeting certain network elements with hardware
and software improvements.
Capacity – the need for additional capacity is driven by an increase in the number of broadband users on
the 21C network (through migration from 20C and growth) and also by the ever-increasing bandwidth
demands of those users.
Resilience –to improve the resilience of the network , BTW is actively removing single points of failure from
the network
New Functionality – to meet the needs of the market BTW needs to enhance its network to deliver the
services its customers require.
This presentation outlines the key upgrade programmes, their drivers, customer impact and
the number of upgrades per programme per week.
BTW is keen to deliver all the required improvements as quickly as possible whilst actively
managing the risk to customers. For this reason a range of run-rates against each
programme has been outlined. The actual run-rates achieved will be determined by this
ongoing live analysis of risk.
Customer outage times for the PEWs start between 00:01 and 02:00 with the aim of
completing customer impacting work by 04:00. This allows 2 hours for roll-back should the
PEW be unsuccessful.
Business as usual capacity upgrades and upgrades to resilient structures have not been
listed here.
Customer Service / BTID Network Change - Executive Summary
21c BRAS Upgrades cont’d
Programme No 37
SE800 11.1.2.5p8 Software upgrade - status update
• Endorsed plan to progress SEOS software upgrades from 6.1.3.10 p10 to 11.1.2.5 p8 on all 255 Ericsson SE800 BRASs in the
21C BB estate 5 nights per week, so change program could be completed by mid June 13 and provide a stability period
before BT Sport Launch Aug 13.
• SEOS 11.1.2.5 p8 moves BT from bespoke software to standard releases & in so doing fixes numerous bugs including a
memory leak issue which has caused 7 BRASs to crash over the last 9 months. Additionally, it supports IPv6.
• The following dashboard provides overall status of the upgrade program with projected completion 19 Jun 13:
POSI Site
Birmingham
Bristol
Cardiff
Colindale
Derby
Falkirk
Faraday
Glasgow
Guildford
Leeds
Manchester
Milton
Newcastle
Peterborough
Preston
Sheffield
Slough
Southbank
Stepney
Wolverhampton
1
30-Apr-13
25-Apr-13
24-Apr-13
21-Mar-13
14-May-13
24-May-13
31-May-13
20-May-13
16-Apr-13
12-Jun-13
12-Apr-13
08-May-13
12-Mar-13
30-Jan-13
18-Apr-13
11-Jun-13
22-Feb-13
16-May-13
03-Jun-13
14-Jun-13
2
01-May-13
25-Apr-13
24-Apr-13
22-Mar-13
03-Apr-13
23-May-13
31-May-13
20-May-13
16-Apr-13
12-Jun-13
12-Apr-13
08-May-13
12-Mar-13
16-Jan-13
18-Apr-13
11-Jun-13
22-Feb-13
16-May-13
03-Jun-13
08-Jan-13
3
01-May-13
25-Apr-13
24-Apr-13
22-Mar-13
08-Apr-13
24-May-13
29-May-13
20-May-13
15-Apr-13
12-Jun-13
12-Apr-13
08-May-13
13-Mar-13
30-Jan-13
18-Jun-13
11-Jun-13
26-Feb-13
14-May-13
04-Jun-13
14-Jun-13
4
01-May-13
26-Apr-13
19-Jun-13
03-May-13
08-Apr-13
24-May-13
29-May-13
21-May-13
17-Apr-13
05-Apr-13
12-Apr-13
08-May-13
19-Mar-13
31-Jan-13
18-Jun-13
10-Jun-13
28-Feb-13
14-May-13
05-Jun-13
14-Jun-13
5
30-Apr-13
29-Apr-13
19-Jun-13
27-Mar-13
03-Apr-13
24-May-13
29-May-13
21-May-13
15-Apr-13
05-Apr-13
11-Apr-13
09-May-13
19-Mar-13
31-Jan-13
18-Jun-13
10-Jun-13
01-Mar-13
15-May-13
07-Jun-13
13-Jun-13
6
30-Apr-13
29-Apr-13
19-Jun-13
27-Mar-13
03-Apr-13
23-May-13
30-May-13
21-May-13
16-Apr-13
05-Apr-13
11-Apr-13
09-May-13
29-Apr-13
22-Jan-13
18-Jun-13
10-Jun-13
05-Mar-13
15-May-13
04-Jun-13
13-Jun-13
BRAS Number
7
8
9
10
11
12
13
14
15
16
30-Apr-13 01-May-13 03-May-13 03-May-13 01-May-13 30-Apr-13
26-Apr-13 26-Apr-13 26-Apr-13 25-Apr-13 25-Apr-13 26-Apr-13 New Build
19-Jun-13 24-Apr-13 24-Apr-13 19-Jun-13
26-Mar-13 26-Mar-13 27-Mar-13 27-Mar-13 03-May-13 26-Mar-13 26-Mar-13 03-May-13 21-Mar-13 New Build
03-Apr-13 03-Apr-13 New Build
23-May-13 New Build
30-May-13 29-May-13 30-May-13 30-May-13 31-May-13 31-May-13 31-May-13 New Build New Build
21-May-13 22-May-13 22-May-13 22-May-13 22-May-13 22-May-13 23-May-13 21-May-13 20-May-13 23-May-13
15-Apr-13 17-Apr-13 16-Apr-13 17-Apr-13 17-Apr-13 15-Apr-13 17-Apr-13 New Build New Build
12-Jun-13 05-Apr-13 05-Apr-13 12-Jun-13 New Build
11-Apr-13 11-Apr-13 11-Apr-13 10-Apr-13 12-Apr-13 New Build New Build
10-May-13 10-May-13 09-May-13 09-May-13 10-May-13 09-May-13 08-May-13 New Build
14-Mar-13 13-Mar-13 12-Mar-13 New Build
01-Feb-13 08-Mar-13 10-Jan-13 29-Jan-13 29-Jan-13 New Build New Build
17-Jun-13 17-Jun-13 18-Apr-13 18-Apr-13 18-Jun-13 18-Apr-13 New Build
11-Jun-13 10-Jun-13
06-Mar-13 08-Mar-13 27-Feb-13 27-Feb-13 28-Feb-13 01-Mar-13 05-Mar-13 26-Feb-13 06-Mar-13 New Build
17-May-13 14-May-13 14-May-13 15-May-13 17-May-13 17-May-13 15-May-13 16-May-13 17-May-13 New Build
04-Jun-13 05-Jun-13 05-Jun-13 05-Jun-13 07-Jun-13 07-Jun-13 07-Jun-13 04-Jun-13 05-Jun-13 04-Jun-13
13-Jun-13 14-Jun-13 13-Jun-13 14-Jun-13 13-Jun-13
Complete
On plan
New build = New BRAS installations planned to address growth as required. Theses will be installed with latest 11.1.2.5p8 SEOS software
Re-planned = Postponed, e.g. where pre-checks I have identified technical issue requiring resolution before upgrade. Specified date is the revised date.
3
Customer Service / BTID Network Change - Executive Summary
Deployment Priorities Feb – Apr 2013
0
4
TBC
TBC
TBC
TBC
11
0
None
None
2
Scaling,
Functionality
200k EU
1500 - 18000
WBC / WBMC
5
6000 72000
Ongoing
Vendor
support,
Functionality
Approx 2500.
6000
HE, WBMC,
WBC
20
75
Dec 13
Scaling 4 port
10G line-card
TBC
41
2nd vendor P
card Upgrade
Scaling
MSE Migrations
21c EES, EEA,
IEA, MSE
Upgrade
Prog No:
None
TBA
500G IEA chassis
upgrade
4
Upgrades
per week
TBA
40
45
Average EU
outage
(Mins)
Ongoing
0
Target Months
Targat End
TBC
Affected
Products
May
Resilience,
scaling,
stability. IEA-P,
EEA-P, P-P,
MSPE-P
42
Average EU
Impact per
upgrade
Apr
LAG Deployment
39
Total
Upgrades
Mar
Key Drivers
Feb
Upgrade
Upgrades
Complete /
Total
EUs per
upgrade
Upgrades
per PEW
Affected
Products
Av. End user Upgrade
outage
s per
(Mins)
week
Av 800
Min 0
Max 1000
9
WBC
35
Up to 75
1052/1060
Non
Customer
impacting
40
None
0
5
31
CRS SMU
Upgrades
Stability
33/52
Non
Customer
impacting
1
None
0
16
Functionality
4/6
Average
200k
1
WBC /
WCC
15 mins
1
35
HT-BEA
IOS-XR
Upgrade
SVLA
offlo
Broa
to a
allev
EEA –
This c
scalab
May 13
Softw
platfo
Apr 13
5
Apr 13
Capacity
Ongoing
Ongoing
June
Capacity,
Stability
May
SVLAN
moves
EEA – EES
Backhaul
Uplift
24
Progress
Planned End
Key Drivers
Apr
6
Upgrade
Mar
Prog No:
Ongoing 21C Upgrades
Softw
40G P
Ongoing 21C Upgrades Cont’d
Upgrades
Complete /
Total
EUs per
upgrade
Upgrades
per PEW
Affected
Products
Av. End user Upgrade
outage
s per
(Mins)
week
Progress
110/257
6
WBC /
WBMC
45
Up to 24
Jun-13
BB EU’s per
BRAS
Av 35000
Max 45000
June
Functionality
(IPv6),
stability.
May
BRAS
37 11.1.2.5 P8
Upgrade
Apr
Mar
Prog No:
Key Drivers
Planned End
Upgrade
22
Capacity
8/11
Av 120K
1
WBC /
WCC
45 mins
1
2nd vendor
MSPE
Software
Upgrade
Functionality
2/80
None
1
None
None
4
(Lag
Support),
stability.
June-13
6
High
Throughput
BEA-VS
Jun-13
38
SVL
offl
Bro
to a
alle
HTbigg
rep
Cap
rep
out
Ongoing 20C Upgrades Cont’d
Prog No:
Av. End user Upgrade
outage
s per
(Mins)
week
Progress
Feb
Bypass
Transformation
Av 11000
Min 3000
Max 18000
6
WBC
35
Up to 18
1/4200
TBC
15
IP Stream
10
75
Sept 14
IPSTREAM Platform
46 MSIP
122/122
Mar 13
36 SB11
7
Affected
Products
Planned End
Stability
Upgrades
per PEW
May
10k BRAS
Upgrades
EUs per
Complete / upgrade
Total
Apr
Key Drivers
Mar
Upgrade
Completed 20C Upgrades
1
14
2
8
Completed 21C Upgrades
Upgrades
Complete /
Total
BB EUs
and/or
Ethernet
Circuits per
upgrade
Upgrade
s per
PEW
Affected
Products
Copper MSAN
Function
ality
5594/5594
NonCustomer
Impacting
Up to 120
None
0
Up to 480
Dec
11
EAD Chassis
Stability
6950/6950
Up to 15
Ethernet
Circuits
Up to 200
Ethernet,
Mobile
Ethernet
<1
Up to 1000
Feb
12
Non
Customer
Impacting
Up to 12
WBC
0
16-30
Feb 12
Progr No:
Key
Drivers
15 Upgrade
16 Code Upgrade
3
9
21C BRAS
Core
Migration
Capacity
151/151
Av. End
user
outage
(Mins)
Upgrades
per week
Date Ended
Upgrade
BEA VS Card
17 Upgrade
Capacity
20/20 –
Complete
NonCustomer
Impacting
1
None
0
Up to 4
Mar
12
DDR
28 Hardware
replacement
Stability
200/200
Non
Customer
impacting
10
None
0
50
May
12
Completed 21C Upgrades
Upgrades
Complete
/ Total
BB EUs
and/or
Ethernet
Circuits per
upgrade
Upgrades
per PEW
Affected
Products
EAD Chassis
16 Code Upgrade
Stability
6950/6950
Up to 15
Ethernet
Circuits
Up to 200
Ethernet,
Mobile
Ethernet
<1
Up to 1000
Feb
12
21C BRAS
Core
Migration
Capacity
Non
Customer
Impacting
Up to 12
WBC
0
16-30
Feb 12
3
17
BEA VS Card
Upgrade
DDR
28 Hardware
replacement
MPLS Core
11 Router
Upgrades
10
151/151
Av. End
user
outage
(Mins)
Upgrades
per wee
Date Ended
Key
Drivers
Progr No:
Upgrade
Capacity
20/20 –
Complete
NonCustomer
Impacting
1
None
0
Up to 4
Mar
12
Stability
200/200
Non
Customer
impacting
10
None
0
50
May
12
Code
Update
Av 20000
Min 0
Max 100000
1
WBMC
1-4
109/109
Jun
12
180
(240 Max)
Completed 21C Upgrades
Upgrades
Complete
/ Total
High
22 Throughput
BEA-VS
Capacity
5/5
Stability
193/193
Copper MSAN
27 Software
Upgrade
Stability /
Capacity
2nd vendor
MSAN
30 Upgrade
Progr No:
Key
Drivers
BRAS software
Upgrade
23
11
2nd Vendor
MSPE
BB EUs
and/or
Ethernet
Circuits per
upgrade
Upgrades
per PEW
Affected
Products
Av. End
user
outage
(Mins)
Upgrades
per week
Av 120K
1
WBC /
WCC
45 mins
1
Av 17000
Max 32000
1
WBC /
WBMC/
WCC
45 mins
Up to 50
Jul 12
5844/5844
Average
700
120
WBC /
WBMC
30 mins
480
May
12
Stability
702/702
Average
700
40-50
WBC /
WBMC/
WCC
40 mins
200 - 250
Jul
12
Stability
51/51
Av 20k
1
WBC /
WCC /
Ethernet
30 secs –
2 mins
2
Jan
13
Date Ended
Upgrade
Jun
12
Broadband Services on 21CN
46
2
1
36
14
29
44
11
27
32
20
9
6
47 48
45
37
4
28
26
22 35
40
34 45
45
39
45
23
31
38
34
11
12
Ethernet Service on 21CN
13
Descriptions
14
Management of risk
15
Download