NeGP-A Overview & Feedback on Guidelines NATIONAL e-GOVERNANCE PLAN Agriculture (NeGP-A) Launched in May, 2006 to improve public service delivery NeGP Includes : 12 cluster of Services with 75 components. Web enabled delivery of services & service levels Process re-engineering, change management and project management Centralized Initiative - Decentralized Implementation Implementation Strategy Delivery of services through multiple modes. CAP & SAPs being developed for standardization and would facilitate data flow within and outside the States. Scope includes Data / Disaster Recovery Centres, computer hardware up to Block level, Site Preparation, Application Development , Data Digitisation, Capacity building & Training. Strengthening/Promoting of Agricultural Information System under AGRISNET to continue with all unspent balances under AGRISNET (without any definite plan of action) to be considered as part of Government of India resources available for NeGP-A. NIC selected to develop Solution Design, Development, Testing & Acceptance, Solution Implementation, Training & Change Management (pertaining to the application software). Project Activities & Timelines of NeGP-A Roll out Phase SR A Activity IMPLEMENTATION PRE- PLANNING A1 Date of RFP Release B IMPLEMENTATION B1 Timelines Completion of Software Development by NIC of components 31 May 2014 30 Apr 2014 which have been cleared for development. B2 Incorporation of changes/suggestions from Divisions and 30 Jun 2014 States to all SRS documents for software development in remaining service clusters B3 Completion of all SRS of remaining components to such a 31 Jul 2014 level that on which Software Development can start taking place. B4 Completion of Data Entry Screens 30 Sep 2014 B5 Selection of Hardware Vendor by DAC 15 Sep 2014 B6 Completion of Civil Infrastructure and Site Preparation (by 31 Aug 2014 Project Activities & Timelines of NeGP-A Roll out Phase B7 Signing of Agreement 30 Sep 2014 B8 Installation of Hardware by Hardware Vendor 15 Jan 2015 B9 Pilot launching of all Services Data Digitalisation by States 30 Nov 2014 B10 Suggestions received from States on services 31 Dec 2014 B11 User Acceptance Testing 31 Jan 2015 Completion of Data Migration B12 Complete Implementation / Deployment / Stabilisation including 31 Mar 2015 required software and hardware for Central Segment (Go-Live) at all locations C Operations & Maintenance and Support Phase 01 Apr 2015 Role & Key Activities to be undertaken by State Government State Agriculture Department to be Nodal Department. Civil Infrastructure Preparation. Backup power arrangements, wherever needed. Hiring of manpower on contract basis. Setting up of State Project Monitoring Unit (SPMU). Comprehensive inputs on SRS documents and feedback on pilot run of software packages. Role & Key Activities to be undertaken by State Govt. Data digitization (Rs. 10 Lacs/State) & localization. Receipt, Acceptance Testing and uploading of reports for site readiness and hardware/Sys Software Recurring expenditure on power and consumables except to the extent of funding by the GOI. States’ share for manpower (0%, 30% & 50%) during first 3 years & Site preparation @ 45% for all sites except Training Labs which will be funded 100% by Center . Senior nodal officer for interacting with GOI and other Stakeholders. Power back up through Solar Panel /Diesel Generators . A sum of up to Rupees one lakh per block subject to an upper limit of 33% of total blocks in the State. Contingency provisions at the rate of 7.5% of overall budget to meet unforeseen requirements. Help Desk – Central & in States (with vernacular language support) Support of GOI under NeGP-A H/W & and System S/w with comprehensive onsite warranty for 5 years Basic IT training to end users. Full support for site preparation of Training Centers and 55% share for other sites. 100, 70 and 50 percent for manpower cost for first three years. Connectivity charges with SWAN for end user locations for a period of 3 Years at an average of Rs. 11000 per location per year. An amount of Rs. 7500 per block, Rs.10, 500 per district headquarter and Rs. 30,000 per State head quarter per year for consumables like printer cartridges etc. for a period of three years. Support for IT infrastructure at selected Mandis, Hand-held devices for e-Pest surveillance. Complete address details of locations where hardware items are to be delivered will be compiled and provided by each State. TRAINING 02 days Basic IT training to end users at State, District & Block level officials. An amount of Rs. 1200 per person for the two days for meeting TA/DA and other administrative charges. The training of CSCs VLEs Expenditure for the training will be borne out of item A2 in the Cafeteria of Activities under ATMA Scheme. ICT Training labs at the scale of one per five districts will be established in each State. One time grant of Rs. 8 lacs per location being given by Govt. of India. NORMS FOR PROVIDING COMPUTER HARDWARE AT STATE LEVEL State Agriculture Department State Agriculture University 20 5 1 0 20 0 20 5 1 0 20 0 0 0 Item Desktop Printer-cum-Scanner Switch(08/24 port) Modem UPS (650VA) Hand Held devices Touch Screen Kiosk Hand-held Devices for Pest Surveillance Pilot Mandi (01 per State) District Block 2800* 06 01 0 0 06 10 5 1 1 1 5 0 0 1 3 1 1 1 3 0 0.5(01 Kiosk per 02 Blocks Norms for Infrastructure Set-up Items State Agri Dept. State Agri University District Block State Data Centre (Civil & Electrical) 1,50,000 NA NA NA State Data Centre (Access Control) 2,00,000 NA NA NA Site Preparation Cost 1,00,000 100000 67000 NA NA 75000 800000 (for 5 districts) Site Preparation for Training Centre NA NORMS FOR MANPOWER DEPLOYMENT NeGP-A Item State Agri Dept. State Agri University District Block Data Entry Operator / Computer Operator 4 2 2 0.5(i.e. 1 per two block) State PMU Consultants 3 0 0 0 Criteria for deployment & Financial Assistance Number of Senior Blocks Consultant Consultant Monthly Cost Ceiling* (Rs. In lacs) 0-5 and Delhi# 0 0 0 6-60 1 0 1.80 61-160 1 1 3.25 161-360 1 2 4.75 >360 1 3 6.00 Categorisation of States/UT’s for SPMU Resources S. No. Name of State Districts Blocks Category Max. No. of resources Category A 0 1 Delhi 10 2 Chandigarh 1 1 Category A 0 3 D&N Haveli 1 1 Category A 0 4 Daman & Diu 2 2 Category A 0 5 Lakshadweep 1 9 Category A 0 6 Andaman & Nicobar 3 9 Category A 1 7 Goa 2 12 Category A 1 8 Puducherry 2 15 Category A 1 9 Sikkim 4 24 Category A 1 10 Mizoram 8 26 Category A 1 11 Meghalaya 11 39 Category A 1 12 Tripura 8 45 Category A 1 13 Nagaland 11 52 Category A 1 14 Manipur 9 60 Category A 1 Categorisation of States/UT’s for SPMU Resources 15 Himachal Pradesh 12 78 Category B 2 16 Arunachal Pradesh 16 94 Category B 2 17 Uttarakhand 13 95 Category B 2 18 Haryana 21 119 Category B 2 19 Jammu & Kashmir 22 136 Category B 2 20 Punjab 22 141 Category B 2 21 Chhattisgarh 27 146 Category B 2 22 Kerala 14 153 Category B 2 Categorisation of States/UT’s for SPMU Resources 23 24 25 26 27 Karnataka Gujarat Rajasthan Jharkhand Assam 30 33 33 24 27 189 245 249 260 268 Category C Category C Category C Category C Category C 3 3 3 3 3 28 Andhra Pradesh 22 271 Category C 3 29 Orissa 30 314 Category C 3 30 Madhya Pradesh 51 321 Category C 3 31 32 33 34 West Bengal Maharashtra Tamil Nadu Bihar 19 35 31 38 347 357 385 534 Category C Category C Category C Category D 3 3 3 4 35 Uttar Pradesh 75 821 Category D 4 AGRISNET State-wise details of funds released under AGRISNET Sl. No. Name of the State 1 Andhra Pradesh 2 3 4 Arunachal Pradesh Assam Chhattisgarh 5 Gujarat 6 Haryana 7 Himachal Pradesh 8 9 Karnataka Kerala 10 MP Total Amt. released Unspent UC received up to Dec-2012 Balance 643.35 643.35 NIL 138.48 36.60 349.377 138.48 36.60 223.42 368.37 6.95125 703.12 607.29199 165.01 107.503 83.13 83.14 NIL NIL 125.97 361.4187 5 5 258.7268 6 81.88 35.35290 865.49 843.46 22.03 5 11 12 13 14 15 16 17 Maharashtra Meghalaya Mizoram Nagaland Orissa Puducherry Punjab 553.60 259.06 177 150.10 579.75 27.22 376 351.23 115.75 177 105.10 579.75 26.62 5 202.37 143.31 NIL NIL NIL 0.60 371 18 Rajasthan 743.2984 319.90 423.3984 19 Sikkim 158.84 145.87 12.97 20 Tamil Nadu 592.0816 21 22 23 24 25 26 Uttar Pradesh Uttarakhand West Bengal Bihar Goa Manipur Total 496.302 220 591.26 400 45 150 8901.812 592.0816 496.302 581.23 23.37423 6185.03107 104.40 NIL 220 10.02 400 21.62577 150 2950.07268 KISAN CALL CENTRE(KCC) Revamped KCCs since 01.05.2012 Voice/Media Gateways (IPPBX based decentralized system) & MPLS. Aim: reach at least one third the farmers households, once in a year. It amounts to about 4.25 crore calls/year. Total 1.49 crore calls registered at KCCs since inception. Call barging and 100% call recording SMS to caller farmers providing a gist of advisories given to them on phone. Voice mail system for recording farmer’s queries with provision for call back. Soft phones in every personal computer with caller ID facility. Facility of video conferencing for upgradation of skills of KCC agents. Centralized monitoring of KCCs at different locations. Number of Calls Registered in KKMS since inception (Jan.2004 to March 2014) 4500000 No. Of calls registered in KCCs 4000000 3500000 3000000 2500000 2000000 1500000 1000000 500000 0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 THANK YOU