PIPELINE QRA SEMINAR INOGATE PIPELINE QRA SEMINAR SEPTEMBER 8-12, 2014 COMPANY PRESENTATION RAMBOLL OIL & GAS INOGATE PIPELINE QRA SEMINAR SEPTEMBER 8-12, 2014 RAMBOLL HISTORY • Ramboll was founded in 1945 in Copenhagen, Denmark, and named after its founders “Rambøll & Hannemann” • The two founders had strong personal beliefs regarding: • High ethical standards • Responsibility towards society • Content employees INOGATE PIPELINE QRA SEMINAR SEPTEMBER 8-12, 2014 3 FROM 2 TO 10,000 • Today, Ramboll is a leading, international, engineering, design and consultancy company • We employ more than 10,000 experts worldwide of which approximately 1,000 in the Oil and Gas industry INOGATERAMBOLL PIPELINE QRA OIL SEMINAR & GAS SEPTEMBER 8-12, 2014 2014/06/11 4 HISTORICAL PEDIGREE INOGATE PIPELINE QRA SEMINAR SEPTEMBER 8-12, 2014 5 OUR ORGANISATION GROUP MANAGEMENT New Markets ENVIRONMENT ENERGY Energy OIL & GAS Oil & Gas MANAGEMENT CONSULTING Management Consulting Group Management Markets Geographical coverage Atelier Dreiseitl India Middle East United Kingdom TRANSPORT Finland Sweden Norway Denmark BUILDINGS Principal business units INOGATE PIPELINE QRA SEMINAR SEPTEMBER 8-12, 2014 OUR SERVICES Authority management Pipeline design Maintenance Environmental Process Project management Mechanical Structural Risk and technical safety Piping and layout Feasibility studies Financial studies & planning Software and systems Electrical Procurement 3D Scanning & Survey Instrumentation & telecom Weight estimation and monotoring HSE management Geophysical and geotechnical Cost estimation INOGATE PIPELINE QRA SEMINAR SEPTEMBER 8-12, 2014 7 INTRODUCTION Presenters: Axel Sporon-Fiedler (AES) • Process Engineer • General Experience in O&Gindustry: • Refinery, On-and Offshore Installations • Gas Plants, Pipelines • Process Safety Design • Commissioning Daniel Lundberg (DANL) • Risk Engineer • General Experience in O&Gindustry: • On- and Offshore Installations • Pipelines (design and life-time extension) • Risk Engineering INOGATE PIPELINE QRA SEMINAR SEPTEMBER 8-12, 2014 INTRODUCTION Seminar Program Topics: Day 1: At GOGC, Tbilisi • General Introduction to General Risk Management (DANL) • Establishment of Basic Data (Design Framework) (AES) • Examples of Pipeline –and Compressor Incidents (AES) • Introduction to Risk Identification (HAZID)(DANL) • Examples of Typical Hazards for Pipeline Systems (AES) • Release Frequencies and Ignition Probabilities (AES) INOGATE PIPELINE QRA SEMINAR SEPTEMBER 8-12, 2014 INTRODUCTION Seminar Program Topics: Day 2: At GOGC, Tbilisi • Consequence Assessment - Dispersion, Fire and Explosion (AES) • Examples of Fire and Explosions – BLEVE, Jet Fire, Flash Fire (AES) • Software for Consequence Modelling (PHAST, CFD) (DANL) • Example of Risk Assessment of a Pipeline System and Risk Acceptance Criteria (DANL) • Rules and Regulations (AES) • ALARP Methodology (AES) INOGATE PIPELINE QRA SEMINAR SEPTEMBER 8-12, 2014 INTRODUCTION Seminar Program Topics: Day 3: At GOGC, Tbilisi Case Study No. 1: Gas Pipeline Explosion at Ghislenghien, Belgium (AES) • Examples of Fire and Explosions – BLEVE, Jet Fire, Flash Fire (AES) • Software for Consequence Modelling (PHAST, CFD) (DANL) • Example of Risk Assessment of a Pipeline System and Risk Acceptance Criteria (DANL) • Release Frequencies and Ignition Probabilities (AES) Case Study No. 2: (DANL) Site Visit at Gudauri: Collect Data INOGATE PIPELINE QRA SEMINAR SEPTEMBER 8-12, 2014 INTRODUCTION Seminar Program Topics: Day 4: At Kasbeki • Visit at Pipeline Site in Kasbeki • Workshop in Kasbeki Data collected at site visits will be evaluated according to the methodology presented on previous days. Day 5: At • • • GOGC, Tbilisi Follow-up on previous days activities Evaluation of course Wrap-up INOGATE PIPELINE QRA SEMINAR SEPTEMBER 8-12, 2014 INTRODUCTION Historical Context – Pipelines: 1806: First Gas Mains in London 1821: First Gas Pipeline in Fredonia, New York made of Hollowed Tree Logs 1862: First Oil Pipeline in Pennsylvania 1879: First Oil Pipeline in Azerbadjan 1906: Oil Pipeline Baku-Batumi 1944: Pipeline under the Ocean (PLUTO) 1947: Kerr McGee first Offshore Pipeline INOGATE PIPELINE QRA SEMINAR SEPTEMBER 8-12, 2014 INTRODUCTION Historical Context – Risk Assessment: Pre- WW2: Informal. No Systematic Approach to Risk Assessment. Post WW2: With the advent of nuclear power, methodologies were developed to assess risk The Seveso disaster in 1976 marked a significant step in making risk assessment a standard feature of industrial projects. Risk Assessment has become universal across every aspect of human activity : Aerospace, Industry in general, including Oil and Gas, Environment, Medical, Financial, etc. INOGATE PIPELINE QRA SEMINAR SEPTEMBER 8-12, 2014 INTRODUCTION TO COURSE Statistics Context (Source: CIA World Fact Book, 2014) By Transported Product Pipelines by Region Europe-incl. Russia North America South America Austral-Asia Middle East & North Africa Sub-Saharan Africa World KM % GAS 465.631 73,9 OIL CONDENSATE 116.735 1.649 18,5 0,3 LPG REF. PRODUCTS OTHER 1.437 43.525 881 0,2 6,9 0,1 TOTAL 629.858 100,0 KM % KM % KM % KM % KM % 2.054.063 86,7 68.645 56,0 179.420 62,8 86.203 51,0 9.051 25,0 175.482 7,4 34.627 28,2 65.336 22,9 55.203 32,7 16.834 46,5 12.304 0,5 251 0,2 3.742 1,3 6.447 3,8 366 1,0 4.509 0,2 1.904 1,6 2.825 1,0 7.482 4,4 258 0,7 116.553 4,9 17.150 14,0 32.594 11,4 13.295 7,9 9.622 26,6 5.316 0,2 0 0,0 1.951 0,7 258 0,2 55 0,2 2.368.227 100,0 122.577 100,0 285.868 100,0 168.888 100,0 36.186 100,0 KM % 2.863.343 79,3 464.327 12,9 24.765 0,7 18.423 0,5 232.784 6,4 8.462 0,2 3.612.104 100,0 INOGATE PIPELINE QRA SEMINAR SEPTEMBER 8-12, 2014 INTRODUCTION Pipelines and Politics Political leaders excercise enormous power via pipelines INOGATE PIPELINE QRA SEMINAR SEPTEMBER 8-12, 2014 END OF INTRODUCTION INOGATE PIPELINE QRA SEMINAR SEPTEMBER 8-12, 2014