Oslo kommune Energigjenvinningsetaten Political objectives in Oslo • 50 % reduction in emissions of greenhouse gases by 2030 • 50 % recovery of materials by 2014 • Source sorting of food waste and plastic packaging by 2012 • Increased use of renewable energy: – Decision of sustainable cycle of waste handling, energy recycling and District heating in Oslo (1 - 2 TWh.) Change from fossil fuels to renewable waste-based fuel for the district heating system. – Use biogas as renewable fuel in vehicles Oslo kommune Energigjenvinningsetaten Oslo and EGE – in a climate perspective • Based on the political objectives, Oslo has defined the scope of work in EGEs building programme : • Scope of work, EGE: – – – – New Waste-to-energy line, Klemetsrud – KA3 Optical sorting plant at Haraldrud Optical sorting plant at Klemetsrud Biogas plant at Nes in Romerike Oslo kommune Energigjenvinningsetaten Circular Waste Management in Oslo • • • The climate perspective, realised through circular waste management Circular waste management is based on total recovery of materials and energy that waste, as a resource, represents. EGE’s new plants at Klemetsrud and Haraldrud have been developed in pursuance of this perspective, focusing on production of renewable energy, such as district heating, electricity and biogas, and the best possible materials recovery from food waste. Oslo kommune Energigjenvinningsetaten PROSJEKT: ”EGE 2010" - ORGANISASJONSPLAN 27.08.2008 Referansegruppe: Øystein Ihler Silja Bjerke Vestre Johnny Stuen Lillian D. Oterholt Ole Gregert Terjesen EGE fagforeninger - Roy Ståle Haug - Jørn Gude - Stig Skauby - Skjalg Holter Runar Skretteberg, HVO Prosjekteier: Helge Heier Controller: Cato Ryd Prosjekteiers representanter: Marked/Logistikk/Info : Øystein Ihler Produksjon : Johnny Stuen Prosjekteiers representant Silja Bjerke Vestre EGE Ressurspersoner Driftskoordinator : Terje Opsahl Logistikkkoordinator : Erik Ulberg Anleggskoordinator BA: Thor Kristiansen Utsortering : Knut Martinsen Anna Karin Eriksson Biogass : Birgit Rindal Ovnslinje : Thor Kristiansen SRO : Skjalg Holther KS : Monica Solheim HMS : Hans-Kristian Beck Prosjektdirektør: Knut Heieren Utsorteringsanlegg Prosjektleder: Petter Thorbeck Prosjektstyring: Prosjektassistent Anskaffelser - Oppf. Reinertsen Prosjektcontroller KS/HMS Myndighetskontakt Plan/ dok. Teknisk - El / SRO - Generelt Biogassanlegg Prosjektleder : Knut O. Furuseth - Biometan : Kjetil Hansen Ovnslinje 3 KA Prosjektleder - Del. prosj. leder el/mek - Prosjekteringsleder : Ole Poulsen : Dorthe L. Baun : Tore Bjønnstu Bygg & Infrastruktur Prosjektleder - Byggeleder bygg KA - Byggeleder infr KA - Byggeleder BA - Prosjekteringsleder - Teknisk byggeledelse - HMS-leder utførelse : Elisabeth Nedgaarden : Nils Buskenes : Per Ø. Gøystdal : Henriette Berntsen : Anne Grete Helbostad : Jarle Martinsen : Jørgen Waak Viken : Bjørn Halvorsen : Ingvar Birkeli : Johan Thorbeck Leverandør: ENVAC Norge AS Leverandør: (September 2009) Leverandør: Ovn/kjel Gassrenseanlegg Turbin /el generator : Von Roll Umwelttechnik AG : Von Roll Umwelttechnik AG : (Sept 2008) : Erik Madsen * : Geir Simonsen : Stein Ole Innset : Karl Otto Vehus : NN : NN (El/Mek, etc) : Kjetil Øvensen Hovedentreprenør: Reinertsen AS * Stedfortredende Prosjektdirektør Oslo kommune Energigjenvinningsetaten Optical sorting plant Oslo kommune Energigjenvinningsetaten Biogas plant: From food waste to biogas and biofertilizer Biogas plant Oslo kommune Energigjenvinningsetaten Environment and Climate Aspects • Using biogas as fuel offers global environmental benefits, as this replaces and reduces fossil CO2 emissions and recuce local emissions. • Nitrogen and phosphorus are nonrenewable resources, which are in short supply on a global scale. Proper use of bio fertilizer will return these nutrients to the ground. Oslo kommune Energigjenvinningsetaten Klemetsrud W-t-E plant : KA 3 Signal building when arriving Oslo Oslo kommune Energigjenvinningsetaten Situation of Line 3 at the existing facility in Klemetsrud Line 3 Oslo kommune Energigjenvinningsetaten Main Supplies for the KA, Line 3 Contractor: Von Roll Inova AE&E Inova Hitachi Zosen Inova • • • • Automatic waste reception system with fully automatic waste cranes (Kranwerke) Boiler/incinerator unit Wet Flue Gas Treatment System with SCR catalytic NOx reduction Turbine/Generator (Man Turbo AG) • • Waste Water Treatments System Regulation coolers to cool excess heat production during summer time. Oslo kommune Energigjenvinningsetaten Energy Production • Overall energy efficiency: 99 % • • Nominal electrical efficiency 20% Maximum electrical efficiency 24% • Nominal energy production: – 55,4 MW heat corresponding to heat demand for 40.000 households – 10,5 MW electricity corresponding to electricity consumption for 20.000 households Oslo kommune Energigjenvinningsetaten Challenges 2006 vs 2011: Changed Scandinavian waste market • • • • Competition of waste Avfallsmängder och behandlingskapacitet i Sverige (maj 2009) Rentability International waste 8 [Mton/år] Develop district heating? 7 6 Ca 2 000 000 ton 5 Ca 800 000 ton – – – – Profu 2009: Stop in landfills Renewable energy, district heating Circular waste management 2009 : Svenskesuget The competition with the Swedish W-t-E-plants 4 3 2 Avfallsmängd grundfall Avfallsmängd Scenario låg och hög Behandlingskapacitet inkl. alla planer Behandlingskapacitet inkl. planer med tillstånd Behandlingskapacitet inkl. definitivt beslutade planer 1 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Oslo kommune Energigjenvinningsetaten