IMPROVEMENT PLAN UPDATESPO Richard Latham Bridget Eggers Tyler Brent Valeria Gonzalez PRESENTATION OBJECTIVES Summarize what was achieved last semester Present project timeline Updates on activities Mixing Prep Activities Mixing Clean Up Kaizen Scaling Process Improvement Operations Management Standard Work Implementation MSD I SUMMARY PROJECT PLAN – MSD II ENGINEERING REQUIREMENTS MIXER WORKER JUSTIFICATION PROJECT Objective: To make a decision about whether a second operator is justifiable in the frozen cookie mixer process (for cookies with inclusions). Engineering Requirements: Characterization of all process steps Throughput Implemented solutions are consistent across all crews and shifts Tools that make system run smoothly Management approval Test Method: Cycle time improvement MIXER WORKER JUSTIFICATION PROJECT Current Progress: Videos taken for Dads, Ultimate w/ nuts, Sub Shop w/ nuts Process analysis completed for one operator Job elements created for two workers based off reasonable assumptions Job element comparison charts created for one worker vs two workers 1 operator 2 operators Dads 26 min 15 sec 15 min 9 sec 73% increase 1 operator 2 operators Sub Shop W/ Nuts 33 min 34 sec 17 min 38 sec 90% increase 1 operator 2 operators Ultimate W/ Nuts 27 min 50 sec 16 min 8 sec 72% increase MIXER WORKER JUSTIFICATION PROJECT Next Steps: Experiment with two workers Create standard job element sheet for two workers using operator feedback Present findings to management SANITATION KAIZEN Objective: Create a system that allows the sanitation employee to be at the mixer at the right time. Engineering Requirements: No food safety, ergonomics, quality impacts Throughput Characterization of all process steps Implemented solutions are consistent across crews and shifts Tools that make system run smoothly Management approval Test Method: Mixer wait time per week (see Mixer Operator Time Sheet) SANITATION KAIZEN Current Progress: Interviewed Jim Roode about sanitation processes Agreed that sanitation can work on a schedule Suggested ideal state would be a one to two hour notice Sanitation employee will fill out sanitation section of the Mixer Operator Time Sheet Next Steps: Map information flow scenarios for mixer sanitation Collect data on sanitation cycle time Update schedule to include sanitation Present findings to management RECIPE MODIFICATION PROJECT Objective: Increase usability of recipe by removing the need for calculations to find the number of bags/boxes needed. Engineering Requirements: Characterization of all process steps Implemented solutions are consistent across crews and shifts Tools that make system run smoothly Sustainable solution methods Management approval Test Method: Does the sheets make sense to the operator? - Yes/No Are the sheets being utilized regularly? - Weekly Team Leader Audit OPERATIONS MANAGEMENT MIXING Objective: Make mixer its own resource and develop a single daily mixer schedule. Engineering Requirements: Characterization of all process steps Tools that make system run smoothly Implemented solutions are consistent across crews and shifts Management approval Test Method: Planned vs Actual number of batches (see Mixer Operator Time Sheet) OPERATIONS MANAGEMENT MIXER Current Progress: Collecting mixer cycle times for frozen and commercial cookies Created preliminary mixing schedule Down time, reason, sanitation Trained mixer operators on mixer tracking sheet Next Steps: Collaborate with frozen and commercial schedulers on mixer schedule Test and validate schedule OPERATIONS MANAGEMENT DIVIDER Objective: Create changeover matrix for divider for use in scheduling. Engineering Requirements: Characterization of all process steps Tools that make system run smoothly Implemented solutions are consistent across crews and shifts Management approval Test Method: Was changeover time accounted for in the weekly schedule? – Yes/ No Does the matrix clearly provide the changeover time between different cookie types? - Yes/No OPERATIONS MANAGEMENT DIVIDER Current Progress: Collect reasons for changeover Next Steps: Collect times for changeover Create changeover matrix Frozen Cookies Changeover Matrix (Time to change) To Present matrix to scheduler Products 125303 197668 From 58940 372378 379705 357632 Sub Shop Cookie Pucksw nuts W/Nuts Cookie PucksSub Shop No Nuts Frz Choc Chip Dads old Cooky way TO BE DISCD ULT Choc Chip Dads Sheets new way NEW Frz Ult ChChp Ultimate Cooki 1.1oz Ultimate Frz Ult ChChp w nuts Nuts 1.1oz Frz Chc Chc Chunk Cky 1.1 Machine W/U W/U W/U W/U W/U W/U W/U 125303 197668 58940 372378 379705 Sub Shop Dads old Dads Ultimate Sub Shop Ultimate w nuts way new way w nuts Frz Choc ULT Choc Frz Ult Cookie Cookie Chip Frz Ult Chip ChChp Pucks- Pucks-No Cooky ChChp Sheets Cooki W/Nuts Nuts TO BE Nuts 1.1oz NEW 1.1oz DISCD 357632 Frz Chc Chc Chunk Cky 1.1 x x x x x x x 313034 126403 282062 Frz Frz Pnut Frz Oatmeal Btr Snickerd Raisin Cookie oodle 1.1oz 1.1oz Pucks STANDARD WORK IMPLEMENTATION Objective: Create work instructions for revised process improvements Engineering Requirements: Characterization of all process steps Implemented solutions are consistent across crews and shifts Tools that make system run smoothly Sustainable solution methods Management approval Test Method: Do the updated work instructions make sense to the worker? – Yes/No Are they being utilized regularly? – Weekly Team Leader Audit DISCUSSION