BIM PROJECT EXECUTION PLANNING Ralph Kreider Graduate Research Assistant CIC Research Program Penn State University Thursday, January 11, 2012 BIM Project Execution Planning Procedure BIM PROJECT EXECUTION PLANNING Identifying BIM Goals and Uses BIM PROJECT EXECUTION PLANNING “Begin with the end in mind.” BIM Goals BIM PROJECT EXECUTION PLANNING Identifying BIM Goals and Uses BIM PROJECT EXECUTION PLANNING Identifying BIM Goals and Uses BIM PROJECT EXECUTION PLANNING Frequency and Benefit of Uses 60% 55% 50% 45% 40% 35% 30% 25% 20% 15% 10% 5% 0% Frequency Benefit 1.6 1.4 1.2 1.0 0.8 0.6 0.4 0.2 0.0 BIM PROJECT EXECUTION PLANNING 65% BIM Use Selection Worksheet Responsible Party Value Proceed? Capabilities & Resources BIM PROJECT EXECUTION PLANNING BIM Use Design BIM Project Execution Process BIM PROJECT EXECUTION PLANNING Level Two Process Maps BIM PROJECT EXECUTION PLANNING Develop Information Exchanges INFO EXCHANGE EXCHANGE BIM PROJECT EXECUTION PLANNING INFO Information Exchange Worksheet BIM PROJECT EXECUTION PLANNING = Output Inadequacy (Revise Information) OR = Input Inadequacy (Revise Responsible Party) Supporting Infrastructure BIM PROJECT EXECUTION PLANNING Plan Template BIM PROJECT EXECUTION PLANNING Lessons Learned BIM PROJECT EXECUTION PLANNING Need BIM Champion(s) Owner Involvement is Critical Need team Buy-in and Transparency The Planning Procedure should allow for Adaptations by the Project Team The Project Execution Plan must be considered a Living Document Planning takes Resources and it is Critical that Resources are Available ACKNOWLEDGEMENTS The Charles Pankow Foundation The Construction Industry Institute (CII) Penn State Office of Physical Plant The Partnership for Achieving Construction Excellence (PACE) Industry Partners: LACCD USACE Balfour Beatty Whiting Turner Clark Construction Group Jacobs Barton Malow GSA MA DCAM Advisory Board Members Dana ‘Deke’ Smith Mark Butler Derek Cunz Mark Falzarano Ed Gannon Greg Gidez Francois Grobler Steve Hagan Steve Hutsell Mark Konchar Soad Kousheshi Rob Leicht Kurt Maldovan Victor Sanvido Alexander Zolotov John Messner PSU Research Team Students: Craig Dubler Shane Goodman Colleen Kasprzak Ralph Kreider Eric Nulton Chitwan Saluja Nevena Zikic Faculty: Chimay Anumba Sam Hunter BIM PROJECT EXECUTION PLANNING Sponsors: BIM PROJECT EXECUTION PLANNING Ralph Kreider Graduate Research Assistant CIC Research Program Penn State University Download the Guide at: bim.psu.edu Keep it up to Date BIM PROJECT EXECUTION PLANNING What to do for this class Create a PxP Template Add sections on decision making Map BIM Process Level 1 and Level 2 Map Design Process Level 1 – Project Team Level 2 – Individual Process Information Exchanges What information is required