Appointment Contracts for BIM SMARTBIM Solutions Measured ROI North America vs. Western Europe SMARTBIM Solutions McGraw-Hill: The Business Value of BIM in Europe. Smart Market Report. BIM is not just Technology! Management & Organisation Process & Workflow Technology © SmartBIM Solutions 2011 SMARTBIM Solutions Benedict Wallbank RIBA Supply Chain Collaboration BUSINESS ACTIVITIES Design Collaboration Internal Collaboration Establishing BIM INDIVIDUAL REPLICATE TEAM OPERATIONS INTEGRATED DESIGN WORKFLOW 3D BIM PROJECT LIFECYCLE WORKFLOW nD BIM Contributing Parties and Utility of Information Organisation Process Technology 2D CAD Time Phase 1 Phase 2 Phase 3 Efficiency Effectiveness Transformation © SmartBIM Solutions 2011 SMARTBIM Solutions CAD Transition: The Challenge of Collaboration BIM Protocols / Implementation Plans Building Contracts for BIM. Professional Indemnity Insurance on BIM projects Appointment Contracts for BIM Intellectual Property Rights and Collaborative BIM. SMARTBIM Solutions Key Risks! Does your Client understand what he is asking for? Control Client expectations. Don’t oversell the benefits particularly on first BIM projects. Appointments should detail the scope and objectives of the BIM. Include a Schedule of BIM Deliverables (programme). (Ensure that you allow for a time overhead on the set up of a first BIM project (particularly 5D).) Agree where the BIM database is to be located and the security responsibilities thereof. Appointment Documentation should refer to the drawing up of BIM protocols between contributing parties (this too should be programmed) . © SmartBIM Solutions 2011 SMARTBIM Solutions Appointment Contracts SMARTBIM Solutions Restructure Fees? © BIMit Consultancy 2010 Volume Model Environmental Analysis Space Model Scheme Model Element Model Construction Model FIM Model FM Model © Focchi © ArchiFM AIA Document 202 - 2008 Your appointment should state the level of detail of the BIM at each work stage. Note when a record copy of the BIM is required. At each defined work stage as a minimum. (AON recommend weekly copies.) LOD 100 LOD 200 Define the permissible uses of the BIM at each work stage. When is the BIM itself a construction document? Define the identity and role of the Information (Model) Manager on LOD 300 collaborative BIM projects. Charge for all services outside standard scope of works for an architect. LOD 400 Get your legal advisors and insurers (Brokers) to review and comment LOD 500 upon the appointment before you sign. © SmartBIM Solutions 2011 SMARTBIM Solutions Appointment Contracts Melbourne Convention & Exhibition Centre, Australia A Plenary Group Public Private Partnership Architects: Woods Bagot and NH Archi`tecture Where sub-contractors are contributing to the BIM a detailed CDP Matrix becomes vital. Clear definition of construction modelers roles and responsibilities. ` If the architect is construction modeling for the contractor, unambiguous agreement of responsibility for these portions of the work must be documented. SMARTBIM Solutions Appointment by the Contractor Define at the outset what rights your client has to use project information. Joint rights? Grant of non exclusive rights to all users for the purpose of the project only? Use by owners for facilities management? Use of Data rather than the model itself? © SmartBIM Solutions 2011 SMARTBIM Solutions Intellectual Property Rights Detail permissible uses of the model. No party to have liability resulting from use of Model beyond uses set out. If you provide for the re-usage of the BIM ensure that appointment documents allow only for reusage in exactly the same way / relationship as in the original design. If IPR rights are not confined to single usage ensure that you are paid more. Your insurers will charge you more! © SmartBIM Solutions 2011 SMARTBIM Solutions Intellectual Property Rights Document your intent and get acknowledgement from all parties! © SmartBIM Solutions 2011 SMARTBIM Solutions Collaborative BIM Directors Key Rule Questions? SMARTBIM Solutions